This document outlines environmental protection specifications for a federal contract opportunity. It details requirements for managing hazardous and non-hazardous waste, protecting air and water quality, and preventing environmental pollution. Contractors must adhere to regulations including RCRA, CERCLA, the Clean Air Act, and DoD instructions. They are responsible for identifying, handling, storing, transporting, and disposing of all materials brought on site, as well as any waste generated. Procedures are provided for waste profiling, accumulation, manifesting, transportation and disposal. The specifications also cover spill response requirements, land use controls, and protection of natural and cultural resources.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_Sampling Data.pdf | ||
| Solicitation Amendment FA500023Q00730001.pdf | ||
| Solicitation Amendment FA500023Q00730001 SF 30.pdf | ||
| Attachment 9 Wage Determination 21 July 2023.pdf | ||
| Attachment 5_FXSB 23-1040S LIQDG.pdf | ||
| Attachment 6_FXSB 23-1040S Open Mkt Gen Specs 20230601.pdf | ||
| Attachment 3_FXSB 23-1040S AF Form 66.pdf | ||
| Attachment 1_FXSB 23-1040S Price Schedule.pdf | ||
| Attachment 2_FXSB 23-1040S SOW.pdf | ||
| Attachment 9_Davis-Bacon Act WD AK20230001 23 June 2023.pdf | ||
| Attachment 7_Contractors Fire Safety Guide (2017 ed).pdf | ||
| Solicitation - FA500023Q0073.pdf | ||
| Attachment 4_FXSB 23-1040S exhibit drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBER Environmental Protection ad Waste Specs,v11APR22 Page 1 of 42
SECTION 01500 ENVIRONMENTAL PROTECTION - JBER
1. APPLICABLE LAWS AND DIRECTIVES
1.1. The Contractor and all subcontractors, in performance of this contract, shall comply with all federal, State of Alaska (SOA), and local laws, regulations, orders and ordinances concerning environmental quality, environmental pollution abatement and control.
1.2. The Contractor shall be responsible for any fine, penalty assessments and/or natural resources damage claims that are brought against JBER for those incidents the Contracting Officer Representative (COR) determines are due to Contractor’s performance or failure to perform during the execution and performance of this contract.
1.3. Technical assistance for complex environmental problems will be coordinated with:
• JBER Environmental Flight, 673 CES/CEIEC (Current Environmental Program Manager List to be Provided to Contractor)
• JBER Bioenvironmental Engineering, 673 AMDS/SGPB, 384-3985
1.4. The Contractor shall accomplish scope of work within the guidance and limitations established by the following federal, SOA, and local regulations and statues; as well as, and USAF instruction and policy based on the most current changes and amendments described below.
1.4.1. Code of Federal Regulations (CFR), Titles 29, 44, and 49
Citation Description 29 CFR 1910.1200 Hazardous Material Communication (HAZCOM) Standard 32 CFR Part 989 Environmental Impact Analysis Process (EIAP) US Air Force 40 CFR 50 National Primary and Secondary Ambient Air Quality
Standards 40 CFR 60 Standards of Performance for New Stationary Sources:
Subpart Dc (Small Industrial-Commercial-Institutional Steam
Generating Units Subpart Kb (Standards of Performance for Volatile Organic
Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After 23 July 1984)
Subpart IIII (Stationary Compression Ignition Internal Combustion Engines)
Subpart JJJJ (Stationary Spark Ignition Internal Combustion Engines)
40 CFR 61 National Emission Standards for Hazardous Air Pollution
JBER Environmental Protection ad Waste Specs,v11APR22 Page 2 of 42
Subpart A (General Provisions) Subpart M (National Emission Standard for Asbestos) 40 CFR 63 National Emission Standards for Hazardous Air Pollution for
Source Categories Subpart ZZZZ (Stationary Reciprocating Internal Combustion
Engines) Subpart CCCCCC (Gasoline Dispensing Facilities) Subpart JJJJJJ (Industrial, Commercial, and Institutional
Boilers Area Sources) 40 CFR 64 Compliance Assurance Monitoring 40 CFR 68 Chemical Accident Prevention Provisions (Risk Management
Program) 40 CFR 82 Protection of Stratospheric Ozone 40 CFR 112 Oil Pollution Prevention 40 CFR 144 Underground Injection Control Program 40 CFR 122.26 Storm Water Discharges (Applicable to Alaska National
Pollutant Discharge Elimination System (NPDES), See section 123.25)
40 CFR 239-299 Guidelines for Disposal of Solid Waste 40 CFR 243 Guidelines for the Storage and Collection of
Residential, Commercial, and Institutional Solid Waste 40 CFR 260 Hazardous Waste Management Systems – General 40 CFR 261 Identification and Listing of Hazardous Waste 40 CFR 262 Standards Applicable to Generators of Hazardous Waste 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste 40 CFR 265 Interim Status Standards for Owners and Operators of
Hazardous Waste Treatment, Storage, and Disposal Facilities 40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities
40 CFR 268 Land Disposal Restrictions 40 CFR 273 Standards For Universal Waste Management 40 CFR 279 Standards for the Management of Used Oil 40 CFR 300 National Oil and Hazardous Substances Pollution
Contingency Plan 40 CFR 320-324 General Regulations- Wetlands, Waters of the United States 40 CFR 355 Emergency Planning and Notification 40 CFR 403 General Pretreatment Regulations for Existing and New
Sources of Pollution 40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential
Structures 40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions 44 CFR 9 Floodplain Management and Protection of Wetlands
JBER Environmental Protection ad Waste Specs,v11APR22 Page 3 of 42
44 CFR 60 Criteria for Land Management and Use; Subpart C:
Considerations in Managing Flood Prone, Mud-slide Prone, and Flood related Erosion Prone Areas
49 CFR 171-178 U.S. Department of Transportation (DOT) Hazardous Materials Regulations
1.4.2. Executive Orders (EO) and United States Code (USC)
EO 11990 Protection of Wetlands EO 11988 Flood Plain Management EO 13514 Federal Leadership in Environmental, Energy, and Economic
Performance
42 USC 170001
Section 438
Energy Independence and Security Act of 2007
16 USC 703-771 Migratory Bird Treaty Act 42 USC 300f Safe Drinking Water Act
1.4.3. State of Alaska Regulations and Statutes
18 AAC 34.020 Prohibited and Restricted Noxious Weeds 18 AAC 30 Environmental Sanitation 18 AAC 50 State of Alaska Air Quality Control Regulation 18 AAC 60 Solid Waste Management 18 AAC 62 Hazardous Waste 18 AAC 63 Siting of Hazardous Waste Management Facilities 18 AAC 70 Water Quality Standards 18 AAC 72 Wastewater Disposal 18 AAC 75 Oil and Hazardous Substances Pollution Control 18 AAC 78 Underground Storage Tanks 18 AAC 80 Drinking Water 18 AAC 83 Alaska Pollutant Discharge Elimination System Program 18 AAC 85 Radiation Protection 18 AAC 90 Pesticide Control AS 16.05.871-901 Anadromous Fish Act AS 16.05.841 Fishway Act
1.4.4. USAF and DoD Instructions. Manuals, and Policy Directives
AFI 32-7040 Environmental Restoration Program AFI 32-7001 Environmental Management AFMAN 32-1052 Integrated Pest Management
JBER Environmental Protection ad Waste Specs,v11APR22 Page 4 of 42
AFMAN 32-7002 Environmental Compliance and Pollution Prevention AFMAN 32-7003 Environmental Conservation AFPD 32-70 Environmental Considerations in Air Force Programs and
Activities DoDI 4715.23 Integrated and Solid Waste Management
1.4.5. JBER Environmental Program Management Plans
• Integrated Hazardous Material Plan (IHMP)
• Integrated Solid Waste Management Plan (ISWMP)
• Hazardous Waste Management Plan (HWMP)
• Integrated Pest Management Plan (IPMP)
• Integrated Natural Resources Management Plan (INRMP)
• Urban Forest Management Plan (UFMP)
• Industrial Wastewater Management Plan (IWMP)
2. GENERAL ENVIRONMENTAL REQUIREMENTS
2.1. Project Features: The Contractor and the COR shall conduct a joint condition survey of the construction or project site prior to start of any onsite construction activities.
2.1.1. The Contractor shall prepare a brief report including a plan describing the features requiring protection under the provisions of the contract that are not specifically identified on the drawings as environmental features requiring protection. The report shall include a description of the condition of trees, shrubs, and grassed areas immediately adjacent to the work site and adjacent to the Contractor's assigned storage and laydown areas; as well as, all access route(s), as applicable.
2.1.2. The Contractor and the COR shall sign the condition survey report upon mutual agreement that it is accurate and complete The Contractor shall protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the work under the contract.
2.2. Pre-Construction Meeting: The Contractor shall attend the pre-construction meeting to review the scope of work with the COR, project manager(s), JBER Environmental Flight, Safety, and Security Forces and any other relevant personnel.
2.2.1. Environmental Brief: JBER Environmental Flight shall provide the Contractor with an environmental brief during the Pre-construction Meeting. The environmental brief shall include a discussion of all relevant environmental regulatory and permitting requirements.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 5 of 42
2.2.2. The Contractor shall provide information regarding equipment, hazardous materials that will be used and wastes that could potentially be generated during the project.
The Contractor shall convey the results of the pre-construction condition survey.
2.3. Environmental Protection Plan (EPP): The Contractor shall submit an EPP within 15 working days after contract award and 10 working days prior to the pre-construction meeting. The EPP shall describe the environmental measures taken to be protect environmental, natural, and cultural resources during project execution.
2.3.1. Implementation of EPP: The Contractor shall meet with the COR and a representative from the 673 CES/CEIEC to discuss the implementation of the EPP.
Contractor shall revise the EPP throughout the project to include any reporting requirements, changes in site conditions, or contract modifications that modify the project scope of work in a way that could have an environmental impact. The Contractor shall submit changes to the EPP for approval to the COR and 673 CES/CEIEC. No requirement shall relieve the Contractor of any federal, SOA, and local environmental protection laws and regulations. The Contractor shall maintain the current version of the EPP on site.
2.3.2. Contents of EPP: The EPP shall include, but is not limited to, the items listed below. Contractor shall provide details for each item listed. Contractor shall identify items that are not applicable to the project and provide a rationale describing why the item does not apply. Contractor shall also include discussions of any environmental issues germane to the work, even if a particular topic may not appear in the following list:
a. Spill Prevention and Control Plan
b. Solid Waste Management
c. Wastewater Management Plan
d. Ambient Air Pollution Control Plan
e. Contamination Prevention Plan
f. Historical, Archeological, and Cultural Resources Protection Plan
g. Biological Resources Protection Plan (Wildlife and Vegetation)
h. Invasive Species Management Plan
i. Hazardous, Toxic, and Radioactive Waste (HTRW) Plan
j. Non-Hazardous Solid Waste Disposal Plan
k. Borrowing Material Plan
l. Traffic Control Plan
2.3.3. Appendix of EPP: Contractor shall attach copies of all environmental permits, permit application packages, approvals to construct, notifications, certifications, reports, and termination documents. Contractor shall include a letter signed by appointing an Environmental Manager that will be responsible for implementing the environmental requirements described in the contract and the specifications heir in.
The appointment letter shall be signed by the Contractor’s authorized representative
JBER Environmental Protection ad Waste Specs,v11APR22 Page 6 of 42
3. PROTECTION OF LAND, NATURAL, AND CULTURAL RESOURCES
3.1. General: The Contractor shall furnish all labor, materials and equipment required to protect environmental quality and prevent environmental pollution resulting from work performed in accordance and/or in violation of these specifications.
Environmental pollution is defined as any activities, actions or consequences of Contractor activity that produce an undesirable effect on the human environment, including environmental resources such as land, water, air, or sound. Land and water resources within the project boundaries and any other location visited by the Contractor shall be preserved or referred to conditions existing prior to this contract.
The Contractor shall confine construction activities to areas allowed by the plans and specifications.
3.2. Noxious and Invasive Species: Contractor shall employ best management practices to prevent the new introduction or spread of noxious or invasive species in to or within JBER in accordance with the JBER Noxious or Invasive Species Management Plan.
Contractor shall inspect and clean all equipment, tools, vehicles, etc. to ensure they are free of plant fragments, seeds, or other viable propagules prior to mobilizing to JBER.
3.3. Landfill Disposal: All non-regulated waste including asbestos materials shall be disposed in an off-base state-approved site.
3.4. Waters Including Wetlands: Contractor shall not enter, disturb, destroy, or allow discharge of soil, debris or any other contaminants into waters or wetlands, except as authorized by the contract. Authorization to enter specific waters identified does not relieve the Contractor from any obligation to protect other waters within, adjacent to, or in the vicinity of the construction site and associated boundaries. In accordance with the JBER INRMP, a 15-foot vegetated buffer between project limits and any wetland or waterway must be established. If the wetland or waterway is adjacent to an anadromous system, then the buffer is to be not less than 100 feet.
3.5. Existing Structures and Utilities: Contractor shall not start excavation work until all existing site utilities have been located. The Contractor shall take the necessary precautions to ensure no damage occurs to existing structures and utilities. Contractor shall repair damage to existing structures and utilities, including monitoring wells and remediation systems, resulting from the Contractor’s operations at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without written approval from the COR.
3.6. Landscape Preservation: The Contractor shall not remove, disturb, injure, or destroy trees, shrubs, or any other surface vegetation without written authority from the COR.
3.6.1. The Contractor shall protect all trees at the project boundary or within the project work area that are not specifically designated for removal on the contract drawings.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 7 of 42
Protection measures shall include erection of sturdy barriers installed at a minimum distance of 10’ from each tree.
3.6.2. Contractor shall maintain all barriers intact until all grading, construction and landscaping work are complete, with exception of contouring upon removal of the barriers.
3.6.3. Contractor shall contour all slopes by hand digging and hand raking to blend the protected areas into the final grade, after barrier removal. Contractor shall manage construction activities in and around landscaped areas, including installation or replacement of landscape trees in accordance with the Urban Forest Management Plan (UFMP). All seeding requirements must use mixes in accordance with the JBER INRMP Section 7.7.7.
3.7. Location of Temporary Field Offices, Storage, and Laydown Areas: The Contractor shall obtain written permission from the COR for locating any temporary office, storage, or other buildings on USAF controlled property. The Contractor shall request location of said facilities by submitting a letter and location drawing to the Contracting Officer. Contractor shall restore the areas where these facilities will reside to pre-construction condition at no expense to the Government.
3.8. Cultural Resources
3.8.1. Archeological Resources: The JBER Cultural Resources Program Manager shall provide the Contractor with locations and restrictions if known archaeological resources exist within the work area. The Contractor shall protect these resources and be responsible for their preservation during the life of the contract.
3.8.2. Contractor shall suspend work if any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found during excavation or other construction activities that may damage or alter such resources.
a. Resources covered by this paragraph include but are not limited to any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock alignments, structural remains or other constructed features; and any indication of agricultural or other human activities.
b. Contractor shall immediately notify the COR and JBER Cultural Resources Manager upon such discovery or find to ensure the appropriate authorities can be notified, and a determination made as to their significance and what, if any, special disposition of the finds should be made.
c. Contractor shall cease all activities that may result in impact to or the destruction of these resources. Contractor shall secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources. The Government retains ownership and control over archaeological resources.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 8 of 42
3.8.3. Historical Resources: Cultural Resources Program Manager shall provide locations and restrictions to Contractor if known historical resources exist within the work area. Contractor shall protect these resources and be responsible for their preservation during the life of the contract.
a. Contractor shall avoid all activities that may damage or alter these resources unless otherwise specified by Cultural Resources Program Manager.
Contractor shall immediately notify the COR and Cultural Resources Program Manager if a historical resource is damaged or altered to ensure the appropriate authorities may be notified.
b. Contractor shall cease all activities that may result in impact to or the destruction of these resources. Contractor shall secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources.
3.9. Biological Resources: Contractor shall minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat. The protection of threatened and endangered animal and plant species, including their habitat, is the Contractor's responsibility. Contractor shall protect all biological resources encountered in and around the project area in accordance with federal, SOA, regional, and local laws, and regulations. Contractor shall adhere to the requirements identified in the JBER INRMP.
3.9.1. Migratory Birds: Migratory bird species occurring on JBER are protected under the Migratory Bird Treaty Act (MBTA) on JBER. The MBTA stipulates that once a bird establishes a nest and lays eggs, it is against federal law to disturb the nest or annoy the birds to get them to abandon the nest. Contractor shall only conduct clearing of grass, scrub land, and forested areas before 1 May or after 15 July to minimize impacts on ground and tree nesting birds.
3.9.2. Bald and Golden Eagles. Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act (BGEPA). Contractor shall comply with this act during the design and construction phases of a project.
3.9.3. Contractor shall make note of the presence of these protected bird species and their nests during the pre-condition survey and again prior to initiating construction with each new season to ensure compliance with the MBTA and BGEPA.
a. The non-observance or apparent absence of birds or their nests during the environmental review process does not mean that an area is free of birds or their nests.
b. Contractor shall obtain clearance from the JBER Avian Wildlife Biologist prior to construction. Contractor shall obtain required permit(s) prior to construction.
3.9.4. The Contractor shall be responsible for all, or any delays and charges filed by U.S.
Fish and Wildlife Service and the SOA Department of Public Safety due to its
JBER Environmental Protection ad Waste Specs,v11APR22 Page 9 of 42 negligence in removing and/or annoying birds or nests protected under the MBTA and BGEPA.
3.9.5. Contractor shall contact the Avian Wildlife Biologist immediately if any nests are observed or wildlife issues occur within the project area prior to and during construction.
3.9.6. Mammals
a. Bats: Contract shall not harass or kill little brown bats (LBB), which are managed as an unclassified game species in the SOA. Bat species cannot be legally harassed or killed, except under the terms of a wildlife nuisance permit issued by the SOA Department of Fish and Game. Contractor shall contact the Bat Program Manager if bats are discovered since limited information on roosting locations of LBB exist on JBER.
b. Brown and Black Bears: The Contractor shall manage solid waste and materials in a manner that deters wildlife including brown and black bears from creating a nuisance within project area. Such measures include policing construction site for food containers and food wastes regularly, storing trash within a secured structure and ensuring dumpster lids are securely closed.
3.9.7. Fish and Aquatic Species: The Contractor shall contact the Fisheries Biologist if a project has the potential to affect fish and aquatic species.
4. MILITARY MUNITIONS: Contractor shall immediately stop work in the area within a project site in the event military munitions, as defined in 40 CFR 260, are discovered, or uncovered. The Contractor shall inform the Contracting Office regarding the discovery or uncovering of military munitions.
5. PROTECTION OF AMBIENT AIR QUALITY
5.1. Stationary Sources: Contractor shall coordinate replacement of existing or installation of new emission sources with the JBER Air Quality Program Manager through the COR. Contractor shall not purchase the proposed equipment until it has been approved consistent with the contract requirements. Emission sources in need of prior approval include, but are not limited to engines (generators, firewater pumps, water pumps, aircraft arrestors, etc.), boilers, heaters, volatile organic storage vessels, paint booths, incinerators, and degreaser/solvent tanks. Contractor shall complete a permit and regulatory applicability determination and provide it to the COR as part of the approval process to ensure all regulatory and permitting requirements are met prior to installation of the emission sources.
5.1.1. Contractor shall provide, the make, model, model year, fuel input rating, and maximum input rating of each emission source being installed as part of the project.
For boilers and heaters, the heat input rating shall be provided in British Thermal Units per hour (Btu/hr). For generators. Contractor shall provide this information
JBER Environmental Protection ad Waste Specs,v11APR22 Page 10 of 42 for both the engine and the equipment it drives or powers (ex. generator, firewater pump, deluge pump, or crushers). For the engine, the input rating shall be provided in mechanical kilowatts or brake horsepower. Generator rating shall be provided in electric kilowatts and shall be the output rating rather than the input rating. The length, width, diameter, roof type, and maximum volume shall be provided for volatile organic liquid storage tanks/ vessels.
5.1.2. All diesel-fired engines installed on base shall comply with the New Source Performance Standards (NSPS) in 40 CFR 60 Subpart IIII and combust Ultra -Low Sulfur Diesel (ULSD). These engines cannot combust JP-8. Projects involving the replacement of existing diesel engines must include provisions to remove low sulfur or high sulfur diesel fuel, or JP-8 from existing storage tanks and replace the fuel with ULSD. If the existing tanks are removed and replaced with new tanks, it/they should be designed to store ULSD.
5.1.3. All gasoline- fired and natural gas-fired engines shall comply with NSPS in 40 CFR 60 Subpart JJJJ. Contractor shall ensure the engine complies with the applicable rules prior to purchase of equipment.
5.1.4. All boilers and heaters shall comply with the National Emission Standard for
Hazardous Air Pollutants (NESHAP) for Industrial, Commercial, and Institutional Boilers Area Sources, if applicable. Boilers that have an input greater than or equal to 10 million Btu/hr shall comply with NSPS in 40 CFR 60 Subpart Dc.
5.1.5. Contractor shall ensure Volatile organic liquid (VOL) storage vessels subject to the NSPS Subpart Kb comply with requirements in the rule prior to final design approval and construction. VOL storage vessels that are greater than or equal to 75 cubic meters (19,812.9 gallons) and less than 151 cubic meters ( 39,889.9 gallons) that will store VOLs with a maximum true vapor pressure greater than 15 kilopascals and VOL storage vessels with a storage capacity greater than 151 cubic meters and a maximum true vapor pressure greater than 3.5 kilopascals are subject to the rule.
5.2. Mobile and Non- Road Engine (NRE) Sources: Contractor shall monitor use of NREs, and other mobile sources brought on to JBER in support of a project to ensure that these units do not become classified as stationary sources by remaining on project site for more than 12 consecutive months. Contract shall monitor residency time of its NREs and mobile sources through recordkeeping. Contractor shall maintain a log documenting the date the NRE and mobile sources arrive on and depart from the project site. Contractor shall work with COR to establish temporary connection to power utility for construction projects expected to exceed 12 months at a single site.
Connecting to the power utility temporarily will eliminate the need for maintaining portable, primary power generators on site for more than 12 consecutive months or seasonally for more than 3 consecutive months for the duration of the construction project. Contractor shall contact COR immediately if a NRE or mobile source has the potential to exceed the residency restrictions.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 11 of 42
5.3. Fugitive Dust Emissions: The Contractor shall control fugitive dust emissions consistent with 18 AAC 50.045(d). Fugitive dust emissions (airborne dust generated by vehicles operating on unpaved surfaces, transfer or transport of dust producing materials, etc.). Contractor shall implement fugitive dust control measures at the construction site, along haul routes and at staging areas. The Contractor shall be required to maintain all excavations and excavation activities, embankments, stockpiles, hauling activities and all other work areas free from airborne dust. Dust control shall be practiced as required for the term of the contract. The cost of any required dust control will be borne in full by the Contractor. Dust control measures include application of water on roads, entry points, and material stockpiles. Dust suppressants can also be applied in lieu of water. Coordination with JBER Water Quality Program Manager and other Program Managers may be required for use of dust suppressants.
5.4. Open Burning: The Contractor shall not engage in any open burning activities on JBER controlled properties.
5.5. Asbestos Containing Material (ACM): Contractor shall prepare and submit any required notifications of intent (NOI) for renovation and demolition work that will disturb ACM and regulated (R) ACM to the EPA Region 10 consistent with notification requirements found in 40 CFR 61 Subparts A and M. Contractor shall manage and dispose of ACM and RACM waste in accordance with 40 CFR 61 Subparts A and M.
5.6. Ozone Depleting Substances and Significant New Alternative Policy (SNAP) Refrigerants: Contractor shall not removal any equipment containing Class I and II ODS and shall coordinate evacuation of ODS containing equipment with 773 CES HVAC Shop, Contractor-operated Shop on JBER, and JBER Air Quality Program Manager to ensure it is disposed of properly and in conformance with USAF and DoD policy and instruction. Refrigerant must be evacuated in accordance with 40 CFR 82 prior to equipment disposal. The DoD has identified select Class I and Class II ODS that must be turned-in to Defense Logistics Agency (DLA) for retention in the DoD strategic stockpile. Contractors and subcontractors are prohibited from removing intact equipment containing these Class I and Class II ODS and taking it off base for evacuation. These substances are listed below.
CHEMICAL NAME ODS CLASS
Refrigerants R-11 Trichlorofluromethane CFC, Class I R-12 Dichlorodifluromethane CFC, Class I R-114 Dichlorotetrafluoroethane CFC, Class I R-500 Azeotropic mixture of CFC- 12 and HFC-152A (1,1 Difluroethane)
CFC and HFC, Class I and II
JBER Environmental Protection ad Waste Specs,v11APR22 Page 12 of 42
CHEMICAL NAME ODS CLASS
R-502 Azeotropic mixture of CFC- 115 and HCFC-22 CFC and HCFC, Class I and II
R-22 Chlorodifluoromethane HCFC, Class II Fire Suppression Chemicals Halon 1202 Dibromodifluromethane Halon, Class I Halon 1211 Bromochlordifluromethane Halon, Class I Halon 1301 Bromotrifluromethane Halon, Class I Solvents Methyl Chloroform 1,1,1 Trichloroethane Class I CFC-113 Trichlorotrifluoroethane CFC, Class I
5.7. Contractor shall determine if any other Clean Air Act rules apply to the project and provide the JBER Air Quality Program Manager with a copy of their regulatory applicability review summary document.
5.8. Contractor shall prepare and provide all air quality permit applications required for the installation of new emission sources, if applicable, to the JBER Air Quality Program Manager for review and staffing by the JBER Installation Commander. The permit application shall include all the required Alaska Department of Environmental Conservation (ADEC) forms, emission calculations, vendor specifications that provide the input rating, and fuel consumption rating, and emission rates; as well as a copy of the Certificate of Conformity (for engines).
6. PROTECTION OF WATER QUALITY
6.1. Surface and Ground Water:
6.1.1. The Contractor shall not install, alter, or modify any Class V underground injection control wells without prior approval. Contractor must demonstrate that other options are either technically cost prohibitive or would adversely impact mission requirements. Contractor shall submit exception documentation to the JBER Water Quality Program Manager before any installation, alterations, of modification may proceed to ensure compliance with the Safe Drinking Water Act, 40 CFR Part 144.
6.1.2. The Contractor shall not operate equipment or machinery in any stream or lake without written permission from the Contracting Officer.
6.1.3. The Contractor shall prevent the deposition of any materials (including earth fill, vegetative waste, oils, and grease) into any stream or lake. Any such accidental deposit will be immediately reported to the COR.
6.1.4. The Contractor shall not discharge effluent from any process, including water-washing processes, into the sanitary sewer or storm drain system. Effluent and residues shall first be collected, sampled, and tested for compliance with ADEC’s Alaska Pollutant Discharge Elimination System (APDES) regulations for discharge.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 13 of 42
Disposal shall be made in accordance with APDES requirements based on the test results. Sampling, testing, and disposal costs shall be borne in full by the Contractor.
6.2. Wastewater: Anchorage Municipal Code (AMC), Title 26, Chapter 26.50, Part 3, Section 200 requires significant industrial users to have a permit to discharge wastewater into the municipal sewer system. JBER is an indirect discharger of non-domestic wastewater and contributes more than five percent of Anchorage Water and Wastewater Utility (AWWU) total wastewater load per day; thus, JBER is classified as a significant industrial user. As required by AWWU Industrial Wastewater Discharge Permit #11 (JBER AWWU Permit), JBER’s Industrial Wastewater Management Plan describes how activities are managed at JBER to minimize the chance of discharging toxic and/or hazardous pollutants into the municipal sewer system.
6.2.1. The Contractor shall prevent the discharge of any substance that may upset or degrade the municipal sewer system, cause health or safety problems, or exceed JBER AWWU Permit effluent limits. The primary applicable regulations that help ensure JBER’s wastewater discharges comply with the permit requirements are:
a. 40 CFR 112 – Oil Pollution Prevention, (2015)
b. 40 CFR 403 – Pretreatment Standards.
c. 18 AAC 75 – Oil and Other Hazardous Substances Pollution Control
d. AMC 26.50.200 – Sewer Service Wastewater Discharge Permits
6.2.2. Notification for discharges to the system: AWWU notification requirements are defined in the JBER AWWU Permit. Slug discharges are defined as any substance released at a rate or concentration that could cause a violation of the discharge standards, or any discharge of a non-routine, episodic nature. Slug discharges include, but are not limited to, accidental spills or a non-customary batch discharge.
The Contractor shall immediately notify the COR and JBER Water Quality Program Manager of a discharge in the following situations:
a. Any discharge to the sewer system of substances prohibited by AMC 26.50.050, or which may endanger public health.
b. Any spill of material prohibited by AMC 26.50.050 or slug discharge which may enter the sanitary sewer system.
c. Any unanticipated treatment bypass or upset which may exceed effluent limitations outlined in JBER AWWU Permit Sections 1.C. and 1.D.
d. The notifications shall include the following: location of the discharge; date and time of discharge; type of material/waste; concentration and volume of discharge; and corrective actions taken.
6.3. Stormwater:
6.3.1. The Contractor shall obtain all permits required by the applicable SOA and federal regulations regarding protection of water resources including coverage under the ADEC APDES General Permit for Discharges from Large and Small Construction Activities (CGP).
JBER Environmental Protection ad Waste Specs,v11APR22 Page 14 of 42
6.3.2. Construction projects that disturb less than one acre of soil within the U.S. Bureau of
Census-designated Urbanized Area of JBER that have the potential to discharge to JBER’s storm drain system or other waters (e.g., streams, lakes, wetlands) shall operate under an erosion and sediment control plan (ESCP) consistent with the JBER Stormwater Management Plan. The Contractor shall submit the ESCP to the JBER Water Quality Program Manager for review prior to beginning ground disturbance. Contractor shall refer to ADEC Alaska Storm Water Guide (https://dec.alaska.gov/water/wastewater/stormwater/guidance/) for additional information. The Contractor shall be responsible for the cost of preparing the project specific ESCP.
6.3.3. Construction projects that disturb 1 or more acres of land and have the potential to discharge to JBER’s storm drain system or other waters (e.g., stream, lakes, wetlands) shall operate under ADEC APDES CGP. The Contractor shall submit the following notifications and a Stormwater Pollution Prevention Plan (SWPPP) in conformance with the ADEC APDES CGP:
a. NOTICE OF INTENT (NOI): The Contractor shall provide the JBER Water
Quality Program Manager and the COR, with an ADEC approved Construction General Permit NOI.
b. NOTICE OF TERMINATION (NOT): Upon final stabilization and completion of the project work, the Contractor shall provide JBER Water Quality Program Manager and the COR a copy of the NOT.
c. SWPPP: The CGP requires submittal of a SWPPP. The Contractor shall submit the project specific SWPPP for projects less than five acres in size to the JBER Water Quality Program Manager and COR for review prior to beginning construction. The Contractor shall submit SWPPPs for JBER projects that are 5 acres or more in size to the JBER Water Quality Program Manager, COR, and ADEC at the time the NOI is filed. The Contractor shall be responsible for the costs associated with preparation of these documents, any permit fees, and maintaining compliance with the permit authorization.
7. PROTECTION FROM TOXIC MATERIALS
7.1. ACM and RACM: Contractor shall manage and dispose of ACM and RACM in accordance with 40 CFR 61 Subparts A and M, 29 CFR 1910.1001, and 29 CFR 1926.1101, as applicable.
7.1.1. Contractor shall maintain waste shipment/disposal records for all ACM and RACM waste and provide the shipment/ disposal records to the COR.
7.1.2. Contractor shall submit all required notifications to Alaska Occupational Safety and Health and EPA Region 10 prior to starting any asbestos work.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 15 of 42
7.1.3. Contractor shall not possess or use ACM in any project on JBER.
7.1.4. Contractor shall prepare and submit an asbestos abatement plan to the COR that includes, but is not limited to, a description of the work, methods of containment and airborne fiber mitigation, management of waste, disposal, air testing and copies of certifications for workers.
7.1.5. Contractor shall submit copies of notifications to USEPA Region 10 required under
40 CFR 61.145(a)(1), 61.145(a)(3), and 61.145(b) to the COR, Asbestos Program Officer, and the Asbestos Operating Officer. Contractor shall coordinate with JBER Toxics Program Manager and 773 CES/CEOI Insulation Shop to ensure all asbestos abatement associated with the project are documented.
7.2. The Contractor shall submit copies of all completed waste shipment/ disposal records that have been signed by the receiving landfill to 773 CES/CEOI Insulation Shop.
The Contractor shall follow the current JBER Asbestos Management and Operations Plan which states:
7.2.1. Contractor is responsible for identifying ACM and RACM prior to conducting maintenance, abatement, renovation, or demolition activities.
7.2.2. Contractor is responsible for contacting 773 CES/CEOI shop to ascertain presence or absence of ACM.
7.2.3. Contractor is responsible for providing proper notifications and copies to records to the JBER Toxics Program Manager and 773CES/CEOI Insulation Shop.
7.3. Lead Based Paint:
7.3.1. Contractor shall be responsible for identifying lead-contaminated waste, including lead-based paint, prior to conducting maintenance, abatement, renovation, or demolition activities.
7.3.2. The Contractor shall manage and dispose of lead-contaminated waste in accordance with 40 CFR 745. Contractor shall manifest any Resource Conservation and Recovery Act (RCRA) hazardous lead- contaminated waste and provide the manifest to the COR. RCRA hazardous lead waste manifests must be completed in accordance with the 01600 Management of Hazardous and Solid Waste - JBER, section 3.6. Only authorized JBER Environmental Compliance personnel will sign Uniform Hazardous Waste Manifests (UHWMs) for the shipment of HW generated on JBER.
7.3.3. The Contractor shall maintain waste shipment records for all non-RCRA hazardous lead-contaminated waste and provide the records to the COR. Contractor shall not use paint with a lead content of 0.06 percent or greater in any capacity on JBER, JBER Environmental Protection ad Waste Specs,v11APR22 Page 16 of 42 unless specifically approved in advance by JBER Bioenvironmental Engineering, 673 MDSS/SGB, 384-3985 and the JBER Hazardous Materials Program Manager.
7.3.4. Contractor shall not use oil-based paint for pavement striping purposes in any capacity on JBER unless specifically approved in advance by the JBER Hazardous Materials Program Manager.
7.4. Other Toxic Materials: The Contractor shall properly manage and dispose of all other toxic substances in accordance with the Toxic Substances Control Act (40 CFR, Subchapter R).
8. PROTECTION FROM AND MANAGEMENT OF HAZARDOUS MATERIALS
8.1. Contractor shall adhere to the hazardous material requirements stipulated in 29 CFR
1910, 49 CFR 171-178, federal acquisition regulation clause 52.223-5, federal standard 313, AFMAN 32-7002, AFI 90-821, JBERI 32-2001, and JBER Integrated Hazardous Material Plan (IHMP), while performing work on JBER. Contractor shall be responsible for identification, proper handling, use, storage, transportation, and disposal of all HAZMATs brought on JBER.
8.2. HAZMAT Definitions: A Hazardous Material or HAZMAT is any material that poses a risk to personnel, equipment, or the environment. The typical identification method is to review the manufacturer Safety Data Sheet (SDS) of the material. Hazards include but at not limited to explosive, flammables, compressed gases, combustibles, water reactive, oxidizers, organic peroxides, poisons, infectious materials, radioactive materials, and corrosives. All HAZMAT must be approved by 673 CES/CEIEC Joint Base Elmendorf Richardson (JBER) Environmental, prior to being brought on JBER. Contractor shall abide by contractor HAZMAT approval process in the most current version of the JBER IHMP.
8.3. HAZMAT Approval: Contractor shall adhere to HAZMAT approval process in current version of the JBER IHMP. To bring any HAZMAT onto JBER contractor will need approval from JBER 673 CES/CEIEC Environmental Office. Contactor may be required to show proof of HAZMAT approval while operating on JBER. Requests for HAZMAT approval must be submitted through the Contracting Officer Representative (COR). The COR can send requests to 673CES.CEIEC.EnvCom@us.af.mil or to the current HAZMAT Program Manager (PM). Recommend submitting HAZMAT approval requests at least 10 days prior to being brought on JBER. The requests will include at a minimum the items listed below, but please submit JBER HAZMAT Tracking Form found at this location:
https://www.jber.jb.mil/Services-Resources/Environmental/Compliance/
1. All HAZMAT SDSs
2. Dates HAZMAT will be on JBER
3. HAZMAT container sizes
4. Max quantity of each HAZMAT that will be on JBER at a given time.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 17 of 42
8.4. Tracking: If capable all HAZMAT will be submitted and tracked through Enterprise Environmental Safety Occupational Health-Management Information System (EESOH-MIS). This is required for contracts longer than 3 years. Contractor will coordinate through their COR to get the training/access required.
8.5. HAZMAT Transportation: Contractor will abide by all state and federal regulations to include but not limited to 49 CFR 171-178 DOT Hazardous Materials Regulations and 29 CFR 1910.1200.
8.6. HAZMAT Storage: Store HAZMAT in original unaltered container or a properly labeled container, suitable to contain the HAZMAT. Containers shall remain closed when not in use. Contactor is required to have the correct SDS for all HAZMAT on hand. Contractor will avoid and prevent material release into the environment, unless given permission to do so by their COR. Contractor will store materials with a Flash Point of 200°F or less, or combustible in a flammable storage cabinet meeting JBERI 32-2001 requirements. Contractor will store materials with a PH of 1-2 or 13-14 in a corrosive materials cabinet. Contractor will store all HAZMAT appropriately and, in a manner, to avoid material incompatibility. Contractor is responsible to provide, manage and maintain emergency response items, materials, secondary containment, and spill response materials suitable for the material being used/stored.
8.7. Deficiency Correction: Contractor shall correct all identified deficiencies for improper storage, labeling, and use of HAZMATs under their control. Corrections may require removal of these materials from JBER within 24 hours. All corrective action costs and/or removal costs shall be the responsibility of the Contractor.
8.8. Hazardous Communications: Reference: 29 CFR 1910.1200, Alaska Statutes Section 18.60.010, and Air Force Manual 90-821 Hazard Communication (HAZCOM) Program.
8.8.1. The Contractor shall establish and implement a written HAZCOM program, meeting the requirement of 29 CFR 1910.1200 and Alaska Statutes Section 18.60.010 Subchapter 15. This program shall be fully implemented prior to start of work. The HAZCOM program will be updated with any changes to process or materials.
Contractor shall submit their hazard communication plan to the COR for approval a minimum of 20 working days prior to the start of work.
8.8.2. The Contractor shall provide workplace HAZCOM training to meet 29 CFR
1910.1200 requirements to all personnel who will be working at or on the project site if HAZMAT or toxic materials are present. Training must be provided to Contractor, sub-contractor, Governmental inspectors, and any other personnel working on the site.
a. Contractor shall document completion of training in writing with the trainer and trainee signing the document.
b. Contractor shall provide a copy of the training record to the trainee and the COR. Contractor shall maintain all HAZCOM training records on site for review by JBER and outside agency inspectors.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 18 of 42
8.8.3. Hazard Communications information relating to Government supplied materials and hazards presented by Government operations at or in the Contractor's job site may be obtained through the COR. The COR may obtain this information from Bioenvironmental Engineering. Requests for information must be made in writing to the Contracting Officer with sufficient lead time to allow Bioenvironmental Engineering a minimum of 20 working days to process the request.
9. HAZARDOUS NOISE: Contractor shall identify all equipment that it will bring JBER that produces noise levels over 84 dBA ("A" weighted decibels) as a hazardous noise source. The Contractor shall use this equipment in a manner that precludes exposure of non-contractor personnel to levels exceeding 84 dBA.
10. HAZARDOUS MATERIALS SPILLS
10.1. Contractor shall comply with the most recent ADEC regulations and guidance pertaining to spill response and cleanup of contaminated sites.
10.2. The Contractor shall provide a Spill Prevention and Control Plan (SPCP) to the COR and JBER Spill Program Manager for review and approval. The Contractor shall, at minimum, describe the methods it will use to prevent and respond to HAZMAT spills;
as well as, a list of equipment, materials, and supplies it will maintain on site for spill response in the SPCP. The SPCP shall include the information required by Section 01600 – Management of Hazardous and Solid Waste on JBER.
10.3. Contractor shall maintain spill kits and absorption materials at the project site at a location that is readily and immediately accessible tin the event of spill. The Contractor shall replenish these materials as needed.
10.4. The Contractor shall be responsible and liable for all costs associated with a spill or release it causes including , but not limited to all labor costs associated with spill response and clean up, sampling and analysis of soils or water contaminated by the spill, and disposal costs.
10.5. Contractor shall obtain prior approval from 673 LRS/LGRF Fuels Management and
JBER Spills and Tanks Program Manager for the installation of every permanent, above-ground storage tanks (ASTs) that will containing petroleum, oils, and lubricants (POLs) or other HAZMATs brought on or constructed on to JBER. Underground Storage Tanks (USTs) shall not be installed on JBER. Contractor shall obtain prior approval for the use of portable and mobile POL, fuels, and HAZMAT containing storage tanks brought on to JBER.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 19 of 42
10.6. Spill Reporting
10.6.1. The Contractor shall immediately report all spills it causes or discovers during excavation activities by calling 911. Contractor must request to be connected to JBER Fire and Emergency Services if using a cellular phone to call 911. The Contractor shall notify the COR after reporting the spill to JBER Fire and Emergency Services.
10.6.2. Contractor shall provide the following documentation and information for each spill to the JBER Spills and Tanks Program Manager:
a. The date, time, and volume of material for each spill.
b. Location of the spill including a latitude and longitude and identify the coordinate system used.
c. Provide photographs and a map.
d. Provide documentation to the COR and JBER Spill Manager within three business days after spill clean-up is complete.
e. Document spill reporting activities and notifications in writing within 24 hours and in the daily report.
f. Work with the JBER Spills and Tanks Program Manager to make all the required agency spill reporting notifications.
10.6.3. The Contractor can contact the JBER Spill Manager for the JBER Spill Reporting Poster and requirements at by emailing 673 CES.CEIEC.EnvCom@us.af.mil and the Spill Program Manager listed in the Environmental Office Contact List.
10.7. Spill Response
10.7.1. The Contractor shall take steps to confine, contain, report, and clean up any leak or spill it causes or discovers in conformance with JBER, EPA and ADEC spill response procedures.
10.7.2. The Contractor shall inspect all tanks or other types of storage vessels that contain fuel, POLs, or HAZMAT daily for leaks. Contractor shall take the following actions if a leaking tank or vessel is discovered:
a. Follow spill response and reporting procedures in paragraph 10.6.
b. Immediately drain and containerize remaining materials from leaking tanks or storage vessels to prevent further releases.
c. Externally clean and place the compromised tanks or storage vessels into an appropriate container prior to transport.
10.7.3. Contractor shall collect samples and analyze soil or water contaminated by the release or spill to determine the concentration of each suspected contaminant to screen and segregate them before excavation. Contractor shall follow the contaminated soil testing and disposal procedures in found 18 AAC 75. Contractor shall take the following actions:
a. Properly stockpile contaminated soils in accordance with ADEC regulations.
JBER Environmental Protection ad Waste Specs,v11APR22 Page 20 of 42
b. Obtain approval from JBER Environmental Flight prior to transport and disposal of contaminated soil off the installation.
c. Complete the ADEC Division of Spill Prevention and Response Transport, Treatment and Disposal Approval Form for the Contaminated Media. The Contractor shall submit the form to ADEC for approval, prior to transporting the soil from the incident site. The Contractor shall provide a copy of the form to the COR and JBER Spill Manager.
d. Transport and dispose of contaminated soils to an ADEC disposal facility approved for the pollutants identified in soil based on test results.
1…