Attachment 2 - AF Form 66 Schedule of Material Submittals.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Boiler Replacements B520 Federal contract opportunity
- Solicitation number
- FA303023Q0008
About this file
This document provides details for a federal solicitation to replace boilers at Building 520 of Goodfellow Air Force Base in Texas. The project consists of removing the existing forced draft gas-fired heating water boiler and installing a new boiler with an integrated carbon monoxide monitor. The solicitation will result in a firm-fixed-price contract awarded to the responsible offeror providing the most advantageous quote meeting requirements. As a 100% small business set-aside, the contract value is estimated between $100,000 and $250,000. The North American Industry Classification System code is 238220 for plumbing, heating, and air conditioning contractors. The solicitation is issued by the 17th Contracting Squadron of the Air Force Air Education and Training Command. Key dates include the site visit on March 15, question submission by March 20, quote due date of March 29, and anticipated award date of April 12. The period of performance is 180 calendar days from notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT 4 | ||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: 1128463 | Bldg. 520 South HTW Boiler Replacement and Hydronic HTW filtration System Installation | SOLICITATION/CONTRACT NO.: | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.) | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S AND OTHER WARRANTIES | OPERATING INSTRUCTIONS | SEE PARA ON COPIES | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACT-TOR RE-SUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||
| 1 | Part 1, 1.5.1 in total |
Performance Period,
| Work Schedule/Plan | 1 | b | GA | ||||||||||
| 2 | Part 1, 1.7.1 Safety | 1 | b | ||||||||||
| 3 | Part 1, 1.11, | ||||||||||||
| Submittals: | 1 | 1 | 1 | 1 | b | GA | |||||||
| 4 | Part 1, 1.12 Warranties | 1 | 1 | e | GA | ||||||||
| 5 | Part 1, 1.14.1.1Work Clearance Request, AF Form 103 | 1 | c | GA | |||||||||
| 6 | Part 1, 1.14.2 Utility Outages | 1 | c | GA | |||||||||
| 7 | Part 1, 1.15 Detail/CAD Drawings | 1 | c/e | GA | |||||||||
| 8 | Part 2, Attachment 1 Air Emissions Source Report | 1 | d/e | GA | |||||||||
| 9 | Part 2, Attachment 1 Hazardous Wastes SDS and Report (If Applicable) | 1 | d/e | GA | |||||||||
| 10 | Part 2, Attachemnt 1 Disposal of Construction Waste | 1 | e | GA | |||||||||
| 11 | Part 3, 3.4 Material Data/Certificates of Compliance | 1 | 1 | 1 | d/e | GA | |||||||
| 12 | Part 4, 4.2.i Test Reports and Results | 1 | d | GA |
| AF Form 66 | |
| (a) As soon as possible but in no case later than 45 calendar days after NTP. | |
| (b) No Later Than 14 Calendar Days after NTP | |
| (c) Prior to Final Inspection of Task Order | No Later Than 14 Working Days Prior to Beginning On Site Work |
| (d) Final Inspection | Prior to Final Inspection |
| (e) As Required per Specifications or Contract |
PAGE &P OF &N
FORM66.xls
File details come from the government source that posted it. Updated .