This solicitation requests quotes for a boiler replacement project at Building 520 of Goodfellow Air Force Base in Texas. The project consists of removing the existing forced draft gas-fired heating water boiler and installing a new carbon monoxide monitor integrated with the controls of a replacement boiler. The acquisition is a 100% small business set-aside with a contract value between $100,000 and $250,000. The North American Industry Classification System code is 238220 for plumbing, heating, and air conditioning contractors. Quotes are due by March 29th and award is anticipated on April 12th. The period of performance is 180 calendar days from notice to proceed. Site visits will take place on March 15th and all questions must be submitted by March 20th. The soliciting agency is the Department of the Air Force Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Other files attached to Boiler Replacements B520, newest first.
File Type Posted
Solicitation Amendment FA303023Q00080004 SF 30.pdf PDF
Solicitation Amendment - FA303023Q00080004.pdf PDF
Attachment 7 - Questions and Answers (Revision 2) - Boiler Replacements B520.pdf PDF
Solicitation Amendment FA303023Q00080003 SF 30.pdf PDF
Solicitation Amendment - FA303023Q00080003.pdf PDF
Attachment 1 - Statement of Work (Revision 3).pdf PDF
Solicitation Amendment - FA303023Q00080002.pdf PDF
Attachment 7 - Questions and Answers - Boiler Replacements B520.pdf PDF
Solicitation Amendment FA303023Q00080002 SF 30.pdf PDF
Attachment 3 - Drawings and Pictures (Revision 2).pdf PDF
Record of Attendance - Boiler Replacements B520.pdf PDF
Solicitation Amendment FA303023Q00080001 SF 30.pdf PDF
Attachment 1 - Statement of Work - Revision 2.pdf PDF
Solicitation Amendment - FA303023Q00080001.pdf PDF
Attachment 5 - Davis-Bacon Act WD TX20230282.pdf PDF
Attachment 6 - DoD Contractor Guide 2021.pdf PDF
Solicitation - FA303023Q0008.pdf PDF
Attachment 2 - AF Form 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Attachment 4 - Base Access Letter.docx DOCX document
Attachment 1 - Statement of Work.pdf PDF
Attachment 3 - Drawings and Pictures.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 01400 – Page 1 of 12

ATTACHMENT 1

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01400 - ENVIRONMENTAL PROTECTION

1.0 APPLICABLE ENVIRONMENTAL REGULATIONS, LAWS, AND PUBLICATIONS:

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. All publications shall be the latest version / edition / revision of the documents listed below, in effect on the date of this solicitation, except where a date is given.

1.1 Code of Federal Regulations (CFR):

29 CFR, Part 1910 Hazardous Waste Operation and Emergency Response

40 CFR 61, Subpart M National Emissions Standard for Hazardous Air Pollutants

40 CFR, Part 82 Protection of Stratospheric Ozone

40 CFR, Part 117 Determination of Reportable Quantities for Hazardous

Substances

40 CFR, Part 122 National Pollutant Discharge Elimination System (NPDES)

Regulations *NOT APPLICABLE*

40 CFR, Parts 260 - 282 Solid Waste Regulations

40 CFR, Part 302 Designation, Reportable Quantities, and Notification

49 CFR, Parts 171-176 Hazardous Materials Regulations, Department of

Transportation, (DOT) Rules

1.2 Environmental Protection Agency Publication (EPA):

EPA Publication No. SW-846 Test Methods for Evaluating Solid Waste

1.3 Environmental Laws:

Clean Air Act (CAA) and all amendments

Clean Water Act (CWA) as amended

Endangered Species Act (ESA) *NOT APPLICABLE*

Emergency Planning and Community Right-To-Know Act (EPCRA)

Section 01400 – Page 2 of 12

Federal Water Pollution Control Act (FWPCA)

National Oil and Hazardous Substances Contingency Plan (NCP)

Occupational Health and Safety Act (OSHA)

Oil Pollution Act (OPA)

Pollution Prevention Act (PPA)

Resources Conservation and Recovery Act (RCRA)

Safe Drinking Water Act (SDWA), as amended

1.4 State Regulations (Texas Administrative Code):

25 TAC 295 Occupational Health 30 TAC 205 General Permit to Discharge Waste 30 TAC 290 Public Drinking Water 30 TAC 335 Industrial Solid Waste and Municipal Hazardous Waste

1.5 Air Force Instruction (AFI): 32-7001 Environmental Management

1.6 Air Force Manual (AFMAN): 32-7002 Environmental Compliance and Pollution Prevention

2.0 ENVIRONMENTAL ISSUES

2.1 Activities which are implemented, in whole or in part with approved funding, must comply with applicable legislation and regulations established to protect the human or physical environment. The Contractor will remain in compliance with Federal statutes during the performance of the contract, including but not limited to the Clean Air Act (CAA), Clean Water Act (CWA), Resource Conservation and Recovery Act (RCRA), and other applicable laws, regulations, and requirements.

2.2 In order to comply with all Environmental Laws and Regulations as set forth by Federal, State, Department of Defense, Air Force and any other mandated requirements for Federal installations, Goodfellow AFB (GAFB) must comply with and are required to identify, manage and track all chemicals (hazardous materials), air emissions, stormwater, and construction and debris (C&D) that are transported, managed, used, and disposed of from any part of this installation. This requirement is for all installation organizations, workplaces, work centers, shops, and for all Contractors doing any work on the installation.

Contractors shall investigate, comprehend, and comply with all environmental rules and regulations applicable to their chosen method of accomplishment of the work under this contract.

2.3 The Contractor will be responsible for and will indemnify and hold the Government harmless for any and all spills, releases, emissions, and discharges of any toxic or hazardous substance, any pollutant, or any waste, whether sudden or gradual, caused by or arising under the performance of this contract or any substance, material, equipment, or facility utilized therefore for the purposes of any environmental statute

Section 01400 – Page 3 of 12 or regulation. The Contractor will be considered the "operator" for any facility utilized in the performance of the contract and will indemnify and hold the Government harmless for the failure to adhere to any applicable law or regulation established to protect the human or physical environment. The Contractor will be responsible in the same manner as above regardless of whether activities leading to or causing a spill, release, emission, or discharge is performed by the contractor, its agent or designee, an offender, visitor, or any third party.

3.0 PROTECTION OF RESOURCES

3.1 Construction activities are NOT exempt from air emission, stormwater, hazardous waste, and other environmental compliance rules and regulations. Contractor shall investigate, comprehend, and comply with all environmental rules and regulations applicable to his/her chosen method of accomplishment of the work under this contract.

3.2 Protection of Land Resources: The Contractor shall confine his/her construction activities to areas defined by the plans and specifications and/or as approved in his/her Storage Area submittal (refer to paragraph 7). Except in areas to be cleared, the Contractor shall not remove, cut, deface, injure or destroy trees or shrubs without written permission from the Natural Resource Officer/Manager and Contracting Officer. Do not fasten or attach ropes, cables, or guys to existing or nearby trees for anchorage unless authorized by the Natural Resource Officer/Manager and the Contracting Officer. Where such use of ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.

3.3 Protection of the Stratospheric Ozone: The Contractor shall comply with 40 CFR Part 82. To the maximum extent practicable, the Contractor shall utilize safe alternatives and products made with or containing safe alternatives to Class I or II Ozone Depleting Substances (ODS), identified under 42 U.S.C. 7671K. Class I Ozone Depleting Substance is defined in section 602 (a) of the Clean Air Act

(CAA).

3.5.6 Post-Construction Cleanup or Obliteration: The Contractor shall obliterate all evidence of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess materials, or any other vestiges of construction.

3.7 Protection of Air Quality: The Contractor shall investigate, comprehend, and comply with all applicable Federal, State, County and Municipal laws concerning air pollution, particularly the CAA (and all subsequent amendments). All work under this contract shall be performed in such a manner that objectionable or nuisance conditions will not be created in the air, nor will objectionable particulates be released to the air. Material usage of welding rods, welding gases, paints, thinners, solvents, fuels, and asphalt will require reporting to the Contracting Officer (Forward to Environmental Office) monthly throughout the project (VIA form Appendix A and AF Form 3000). No open burning shall be permitted on base.

4.0 HAZARDOUS MATERIALS:

4.1 Contractors using any type of chemicals (hazardous materials) on Goodfellow AFB must comply with the review and approval process and shall provide the Contracting Officer with a list of proposed materials that it plans to use on the installation during the performance of the contract.

Section 01400 – Page 4 of 12

4.2 The Contractor shall provide to the Contracting Officer an AF Form 3000, a Material and Approval Submittal, listing all materials that will be utilized during the contract period. If any of those materials are classified as hazardous and are covered under the Emergency Planning and Community Right-to-Know Act (EPCRA) (42 U.S.C. 11001-11050) or other applicable host Nation, Federal, State, or Local tracking or reporting requirements and also covered under the Occupational Safety and Health Administration (OSHA) Hazard Communication (HAZCOM) Standard (29 CFR 1910.1200) then those materials must be included in the material list submittal.

4.2.1 The Installation HAZMAT Management Program (IHMP) office will determine if any of the proposed materials to be used are hazardous materials (HAZMATs) and will require approval authorizations prior to bringing on or using any of those materials on the installation.

4.3 The Contractor will submit a current Safety Data Sheet (SDS) for each hazardous material to be used under this contract. The Contractor must maintain an on-site file of all SDS during the performance of this contract.

4.4 The Contractor must obtain written authorization from the Contracting Officer and IHMP office prior to bringing or using any hazardous chemicals on the installation. The Contractor shall submit a hazardous chemicals usage report of all hazardous chemicals for Government Approval (via AF Form 3000) to the Contracting Officer on a monthly, quarterly basis, or at the end of the contract, as determined by the Contracting Officer and the IHMP.

4.4.1 The main Contractor is responsible for the hazardous chemical submittals for approval to the Contracting Officer and then to the IHMP office.

4.5 A copy of the DOD INSTALLATIONS OR FACILITIES STANDARD OPERATING PROCEDURE (SOP) - Contractor Tracking Requirement document will be provided to the Contractor at the pre-performance meeting describing the requirement for all Contractors to submit a Contractor Hazardous Materials Usage Tracking Form (to be completed by the Contractor) and copies of the Safety Data Sheets (SDS’s) for all chemicals that will be used under any contract.

4.6 If additional hazardous materials are required during the course of the contract, the Contractor shall complete an authorization worksheet and provide an SDS for each additional hazardous material via AF Form 3000 for Government approval prior to bringing or using any additional hazardous materials onto the installation. The Contractor shall submit the new authorization worksheet no later than 15 days prior to delivery of the hazardous materials onto the installation.

4.7 The Contractor shall report hazardous material usage data via AF Form 3000 to the Contracting Officer (forward to the Environmental Office) on a monthly, quarterly, or end of project basis, as determined by the Contracting Officer. The report will show the product name and part number (stock number if already assigned to each material), any amount received during this period, unit of issue, amount used during this period, and any balance left to still be used by the Contractor.

4.8 Safety Data Sheets (SDS) are required as specified in the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract) for any material designated by a Government representative as potentially hazardous and requiring safety controls. SDSs must be submitted by the

Section 01400 – Page 5 of 12

Contractor upon contract award. Failure to provide SDSs or certificate when requested could result in the Contractor being considered non-responsive and result in termination of the contract.

4.8.1 While there is no single definition that encompasses every type of hazardous chemical, these items generally have a Safety Data Sheet (SDS) prepared by the manufacturer. It is important to note that not every material with an SDS is automatically considered a hazardous material. When there is a question regarding whether or not a material is hazardous, additional guidance should be sought from the CO/COR where they can then forward questions about those materials to the installations Environmental, Safety and Occupational Health (ESOH) team thru the Environmental Office.

4.8.2 Globally Harmonized System (GHS) of Classification and Labeling of Chemicals, per 29 CFR 1910.1200(g) requires that the chemical manufacturer, distributor, or importer provide Safety Data Sheets (SDSs) for each hazardous chemical to downstream users to communicate information on these hazards.

It also mandates that all workplaces shall not have any SDSs older than five (5) years old and meet the new GHS requirements.

4.9 The Contractor shall not use products that are, or contain any Toxic 17 chemicals, Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), CFC’s, or Persistent Bio-accumulative and Toxic (PBT) chemicals. Any Hazardous Material (HM) containing any of these banned substances will not be allowed on the installation.

4.11 For each Contractor-identified chemical that the IHMP determines does not meet the definition of a hazardous material, then the IHMP requirements do not apply. The IHMP will notify the Contracting Officer that the Contractor has authorization to bring and use that material on the installation without reporting usage unless required under the Green Procurement Program or specifications require data submittals.

5.0 DISPOSAL OF NON-HAZARDOUS AND SPECIAL WASTES:

5.1 Non-Hazardous Wastes: Non-hazardous solid waste is regulated under 42 U.S. Code Chapter 82 – Solid Waste Disposal - Resource Conservation and Recovery Act (RCRA) Subtitle D, 40 CFR Part 239- 259 and under State of Texas 30 TAC §330 - Municipal Solid Waste Rules. Regulations established under Subtitle D ban open dumping of waste and set minimum federal criteria for the operation of municipal waste and industrial waste landfills. The Contractor shall transport and dispose of all non-hazardous wastes to and in a State of Texas permitted facility or other disposal facility permitted by the state in which the disposal facility is located.

5.2 Special Wastes: Special Wastes are any wastes that are non-hazardous, yet have to be stored, transported, and/or disposed of in a special manner; for example, asbestos containing wastes or petroleum contaminated soil. The Contractor shall store, transport and dispose of all Special Wastes in accordance with all Federal, State, and Local laws, rules and regulations as applicable. The disposal facility must also be approved by the Installations Environmental Office prior to transportation. The Contractor shall make all necessary arrangements with the disposal facility for disposal of Special Wastes.

5.3 The Contractor shall submit all transportation and disposal documentation to the Contracting Officer (forward to the Environmental Office), including but not limited to, waste profiles, bills of lading, manifests, etc. at no additional cost to the Government.

Section 01400 – Page 6 of 12

6.0 HAZARDOUS WASTE:

6.1 The Contractor shall accumulate, transport, and dispose of all hazardous waste in accordance with Federal hazardous waste regulations 40 CFR 260-279 and the Texas hazardous waste regulations described in 30 TAC Chapter 335, and Federal transportation regulations 49 CFR 171-176. The Contractor shall prepare and maintain all records, shipping documents, training certificates, plans, and other documents required by regulation. The Contractor shall submit copies of records, shipping documents, training certificates, plans, manifests, land disposal restrictions and other documents pertaining to this contract and required by 30 TAC, Chapter 335 to the Contracting Officer (forward to Environmental Office). All manifests and land disposal restrictions must be signed by the Installations Environmental Office.

6.2 The Contractor shall remove all hazardous waste pertaining to this contract from Goodfellow AFB on a daily basis unless the accumulation and storage is specifically approved in writing by the Contracting Officer and the Installations Environmental Office. Such approval must be given prior to the generation of any hazardous waste. Approval for accumulation or storage of hazardous wastes in excess of 55 gallons or greater than 1 quart of acutely hazardous waste, for greater than three (3) calendar days will require a minimum lead time of forty-five (45) calendar days from the date of the receipt of the request.

The Contractor shall transport hazardous wastes from Goodfellow AFB to a Treatment, Storage, or Disposal Facility (TSDF) permitted by the State of Texas, the EPA, and approved by the Base Environmental Coordinator. Under no circumstances shall disposal or treatment of hazardous wastes be allowed on Goodfellow AFB by the Contractor.

6.3 Reasonable and appropriate measures shall be taken by the Contractor to prevent chemicals, fuels, oils, greases, bituminous materials, waste washings, herbicides and insecticides, and construction materials or debris from polluting the construction site and surrounding area.

6.3.1 The Contractor will be responsible for any and all spills, releases, emissions, and discharges of any toxic or hazardous substance, any pollutant, or any waste, whether sudden or gradual, caused by or arising under the performance of the contract or any substance, material, equipment, or facility utilized therefore for the purposes of any environmental statute or regulation to protect the human or physical environment.

6.3.2 The Contractor will be responsible in the same manner as above, regardless of whether activities leading to or causing a spill, release, emission, or discharge is performed by the contractor, its agent or designee, an offender, visitor, or any third party. If the contractor spills or releases any substance into the environment, the Contractor will immediately report the incident to the Contracting Officer, the Installation Environmental Office and the Installation Fire Department.

6.3.3 The liability for the spill or release of such substance’s rests solely with the contractor and its agent and at no time will the contractor dispose of hazardous, toxic or caustic substances by unsafe methods. Unsafe methods include spreading or pouring it onto the ground, dumping in a lake, river or stream, and flushing into sewers.

6.3.4 Any materials to be disposed including wastes, effluents, trash, garbage, oil, grease, chemicals, and similar hazardous substances shall be transported to a suitable disposal site by the Contractor subject to the approval of the Contracting Officer and the Environmental Office.

Section 01400 – Page 7 of 12

6.3.5 Aerosol Cans: Aerosol cans, after use, must be punctured and drained of product and propellant via approved equipment manufactured for that purpose. The empty cans may then be recycled as scrap metal. Disposal of the internal aerosol can contents shall be accomplished according to its waste classification.

6.3.6 Other Containers: Refer to 30 TAC 335.41(f) for criteria regarding management and disposal of other containers.

6.3.7 The Contractor shall submit all transportation and disposal documentation to the Contracting Officer (forward to the Environmental Office), including but not limited to, waste profiles, bills of lading, manifests, etc. at no additional cost to the Government prior to the Final Inspection.

6.3.8 The Government will, as is deemed necessary, inspect the Contractor’s operations and records for compliance with Air Force, State and Federal regulations. The Contractor shall cooperate fully with the TCEQ, US EPA and/or Government representatives during these inspections, if any. The Contractor shall be fully and completely responsible for payment of all fines and/or penalties imposed by the TCEQ or US EPA for violation of regulations governing Environmental Management during performance of this contract.

6.3.9 NOTICE: No hazardous materials, lubricants, oils, liquids, general refuse or related materials shall be deposited in the refuse containers on base. The contractor will adhere to all other Federal, State, and Local guidelines regarding environmental practices.

7.0 MAINTENANCE OF POLLUTION CONTROL FACILITIES DURING CONSTRUCTION

7.1 During the life of this contract the Contractor shall maintain all facilities constructed for pollution control under this contract for as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created. During the construction period, the Contractor shall conduct frequent training courses for his/her maintenance personnel. The curricula shall include methods of detection of pollution, familiarity with pollution standards, and installation and care of vegetation covers, plants, and other facilities to prevent and correct environmental pollution.

9.0 SPILLS

9.1 Goodfellow AFB maintains, follows, and enforces the following spill plans for regulated substances.

a. Hazardous Materials Emergency Response Plan

b. Spill Prevention Control and Counter Measures Plan

9.2 These plans are maintained by the Installation Management Flight of Civil Engineering at 460 E.

Kearney Blvd, Goodfellow AFB. The Contractor shall take preventive measures (secondary containment for fuel storage, avoid overfilling of trucks, etc.) to avoid spills. If a spill does occur, the Contractor shall immediately notify the Goodfellow AFB Fire Department at phone number 325-654-3532 or 325-654- 7000. The Installation Fire Department is the first responder who will take charge to secure/neutralize the event, if required and will coordinate cleanup/remedial actions. Notification shall be made even if the spill is within the cleanup capabilities of the Contractor.

Section 01400 – Page 8 of 12

9.3 If the Contractor spills or releases any substance into the environment, the contractor shall immediately report the incident to the Installation Environmental Office at 325-654-5946. The Contractor shall be liable for containment and environmental clean-up of the spill or release.

9.4 The Contractor may be held liable for all expenses incurred by the Government during the spill response and any cleanup operations including, but not limited to a hazardous materials/waste cleanup Contractor, supplies and equipment rental, waste transportation, laboratory analysis, and disposal costs.

10.0 DEMOLITION

10.1 Demolition Notification: When a project involves demolition, a written notification on the form specified by the Texas Department of State Health Services (DSHS), shall be submitted to the DSHS at least twenty (20) calendar days prior to Contractor’s proposed demolition start date. The notification shall be signed by the Base Environmental Coordinator. The Contractor shall be responsible for completing the notification and timely mailing to the DSHS. Contractor shall submit a copy of the signed notification to the Contracting Officer annotated with the date of mailing to the DSHS. The Contractor shall be responsible for timely payment of all fees associated with the work and permit.

11.0 ASBESTOS: Report provided upon request

11.1 Abatement: Not Applicable

11.2 Asbestos Containing Building Materials: Under no circumstances, under the provisions of this contract, shall the Contractor be allowed to provide asbestos containing building materials, or products containing encapsulated asbestos or mineral fibers as defined in the 40 CFR 61, National Emission Standards for Hazardous Air Pollutants of 1990, to Goodfellow AFB.

11.3 Asbestos – Free Certification: Prior to final acceptance, the Contractor shall submit a signed statement, accompanied by SDS sheets for project materials, from a licensed asbestos inspector or the project architect or engineer, or officer of the company, proclaiming that no asbestos-containing building materials were used in the construction via Form 3000 for Government Approval.

12.0 LEAD:

Under no circumstances, under the provisions of this contract, shall the Contractor be allowed to provide Lead Based Paint (LBP), paint products or lead building materials. The definition of Lead Based Paint is paint or other surface coating that contains lead to or in excess of 1.0 milligrams per square centimeter or more than .5% by weight (5000ppm).

13.0 RELEASE OF FLUIDS TO THE SANITARY SEWER SYSTEM:

13.1 Goodfellow AFB’s sanitary sewer system discharges into the Publicly Owned Treatment Works (POTW) operated by the City of San Angelo, Texas. This POTW has established testing requirements for certain constituents as well as discharge limits of those same constituents. Accordingly, any Contractor performing work at Goodfellow AFB and contemplating a release of non-hazardous water into the sanitary sewer system shall comply with the testing/release requirements established by the City of San

Section 01400 – Page 9 of 12

Angelo. The Contractor is also responsible for any and all testing, monitoring, measuring, documenting, etc. to prove compliance with same.

14.0 GREEN PROCUREMENT PROGRAM (GPP)

14.1 Green Procurement is defined as "The purchase of environmentally preferable products and services In accordance with Federally-mandated 'green" procurement preference programs.

14.2 Priority should be given to products that emphasize the source reduction aspect of the Air Force's Pollution Prevention hierarchy and those that incorporate one, or all, of the following mandatory GPP elements: Recovered Materials, Energy and Water Efficient, Alternate Fuels and Fuel Efficiency, Bio-based, Ozone Depleting Substances, Priority Chemicals, and Environmentally Preferable Products (EPP).

15.0 AIR EMISSION SOURCE REPORTING

15.1 The Contractor shall comprehend and comply with all applicable Federal, State, County and Municipal laws concerning air pollution, particularly the Clean Air Act (CAA) and all subsequent amendments. All work under this contract shall be performed in such a manner that objectionable or nuisance conditions will not be created in the air, nor will objectionable particulates be released into the air. Material usage of welding rods, welding gases, paints, thinners, solvents, and asphalt will require reporting to (through the Contracting Officer) the Environmental Office monthly throughout the project (VIA Appendix A and AF Form 3000). No open burning shall be permitted on base.

16.0 CONSTRUCTION & DEBRIS

16.1 Construction and Demolition (C&D) debris consists of the waste generated during construction, renovation, and demolition projects. Covering a wide array of materials, this waste often contains bulky, heavy materials, including concrete, wood, asphalt (from roads and roofing shingles), gypsum (the main component of drywall), metals, bricks, plastics, and plant materials from site clearing. C&D debris also includes salvaged building components such as doors, windows, and plumbing fixtures.

16.2 When a project involves any type of construction, remodeling, or demolition, the Contractor shall use all means available to divert to the greatest extent practicable and economically feasible, construction and demolition waste from landfills. At the end of the project, and prior to final acceptance, the Contractor shall submit a solid waste diversion report (the form is included in this document) identifying the materials and weights either recycled or diverted from solid waste disposal to other re-use as well as weights of waste disposed in a landfill. The report shall be submitted via AF Form 3000 to the Contracting Officer (forward to Environmental Office).

17.0 TRAINING

17.1 The Contractor shall ensure all employees complete the required Hazardous Communication (HAZCOM), Hazardous Materials and Hazardous Waste training required for this project. If hazardous materials are used and/or hazardous wastes are generated as part of this contract then the Contractor shall appoint a primary and alternate HAZMAT and Hazardous Waste monitor. The Contractor is responsible for training all Contractor personnel regarding environmental aspects associated with the project.

18.0 ENVIRONMENTAL MANAGEMENT SYSTEM (EMS):

Section 01400 – Page 10 of 12

18.1 The Contractor’s on-site supervisory personnel shall complete the EMS Awareness Training (EMS100AFIT00004) program prior to commencement of any activities. The Installation Environmental Office should be contacted at (325) 654-5946 for information about this 7-minute awareness training within 60 days of contract award or a new contract employee supervisor begins work. The training will be accomplished utilizing web-based The Environmental Awareness Course Hub (TEACH) available through any internet access at https://usaf.learningbuilder.com/

18.2 The training above will be tracked by the Environmental System Administrator.

https://usaf.learningbuilder.com/

Section 01400 – Page 11 of 12

Appendix A:

Air Emission Source Reporting

1. From:

2. 17 CES/CEIE

460 E. Kearney Blvd

Bldg. 3511, Rm 130 Goodfellow AFB, Texas 76908

3. Month/Year Ending (mmm/yyyy)

4. PRODUCT 5. AMT RECEIVED 6. U/I 7. AMT USED 8. BALANCE

Fuels - Gasoline

Gallons

Fuels - Diesel Gallons

Propane / LPG Gallons

Natural Gas CU FT

Welding rods/wire Pounds

9. REPORTED BY (Name, Orgn, Phone)

9a. DATE

10. ENTERED BY (Name, Orgn)

10a.

DATE

Form Instructions:

1. Organization and address of organization and/or contractor providing the report

2. Organization and address of office receiving the report

3. Ending month and year for data being reported

4. Name of product being reported, for example JP8, Mogas, Diesel, etc.

5. Total quantity received in the reporting month

6. Unit of issue for the product reported – I.e., gallons, pounds

7. Total quantity issued or used in the reporting month

8. Balance of product – The end balance of unused materials that are still on the installation or transported off-site by a contractor.

9. Name, organization and phone number of person providing report

9a. Date of report

10. Name of person performing data entry 10a. Date of data entry

Section 01400 – Page 12 of 12

END OF SECTION

Material Type Recycled (pounds)

Recycling Company

Landfill (pounds) Landfill Used

Costs / Proceeds

Asphalt

Bricks

Concrete

Dirt/Soil

Dumpster Debris

Freons/Refrigerants

Light Bulbs

Lumber/Wood

Metals

Oil/Petroleum

Plastics

Roofing

Steel

Wastewater

Tress/Brush

Other

San Angelo Area Recycling Haulers and Markets

Ric Abbott Co., 6577 S. US Hwy 277, San Angelo, TX (325) 651-7330 Acme Iron & Metal Co., 720 N. Buchanan, San Angelo, TX (325) 653-1407 Butts Recycling Inc., 615 W 11th St, San Angelo, TX (325) 653-8957

San Angelo Area Landfill

Republic Services Inc., 3002 Old Ballinger Hwy, San Angelo, TX (325) 655-6869 (7:00 AM -5:30 PM Mondays-Fridays / 7:00 AM -12:00 PM Saturdays / Closed Sundays)

SECTION 01400 - ENVIRONMENTAL PROTECTION
Air Emission Source Reporting