Attachment 7 - Questions and Answers - Boiler Replacements B520.pdf

PDF 79 KB Posted

Attached to
Boiler Replacements B520 Federal contract opportunity
Solicitation number
FA303023Q0008
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document provides details for a federal contract solicitation to replace boilers at Building 520 on Goodfellow Air Force Base in Texas. The solicitation is for a firm-fixed-price contract to entirely remove and dispose of an existing forced draft gas-fired boiler and install a new carbon monoxide monitor integrated into the new boiler's onboard controls. The project magnitude is between $100,000 and $250,000. The solicitation is a 100% small business set-aside with a NAICS code of 238220. The Government intends to make award without discussions by April 12, 2023. Offerors must register in SAM and actively monitor the site for updates. Site visits must be requested by March 10 and will take place on March 15. Questions are due by March 20 and quotes are due by March 29. The period of performance is 180 days from notice to proceed.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Number Question Answer

Question:

Will GAFB provide the List of Attendees?

Answer:

Yes, Record of Attendance will be provided with Amendment 0002.

Question:

Do you anticipate an extension for Quote due date (Mar. 29)?

Answer:

Yes, an extension is anticipated. Dates changed from 29 March to 5 Apr 2023.

Question:

Sections 52.228-1, 52.228-15 indicates Bid Guarantee, Performance and Payment Bonds Construction, are these items required for this contract?

Answer:

Yes, Bid Guarantee is required and FAR Clause 52.228-1 is included in Solicitaion.

Yes, Performance and Payment Bonds Construction are required and FAR Clause 52.225-15 is included in Solicitaion.

Question:

For the Boiler and filtration equipment concrete bases, what type of work is expected? For example repair and coating paint on the bases?

Answer:

Mechanical housekeeping pad work would only consist of modifications needed for adaptation of the existing boiler pads to fit the footprint of the new boilers, if nessasary. This would include dowed in rebar to secure the new section to the existing pads.

Question:

Is there a plan to combat the thermal expansion problem?

Answer:

Yes, the Governent has confired with the HVAC Shop, and will be updating the SOW to include replacement of the existing Expansion Tank (ET). The location for the ET will be located on the floor in front (West side) of the existing boiler mechanical pads. An updated Attachment 1 - Statework of Work (Revision 3) was provided with Amendment 0002. Changes are in - Section 3, 3.4.7 and 8, Section 4, 4.2 (p, q, r, and s)

Question:

Is there a plan to provide new make up water for the boiler system?

Answer:

Yes, heating water, make-up piping/system replacement will be included as an additional requirement in association with the replacement of the existing expansion tank. An updated Attachment 1 - Statework of Work (Revision 3) was provided with Amendment 0002. Changes are in - Section 3, 3.4.7 and 8, Section 4, 4.2 (p, q, r, and s)

FA303023Q0008 - Questions & Answers Boiler Replacements B520