Attachment 2 AF Form 66.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
AMENDMENT 01* Replace Overhead Doors Federal contract opportunity
Solicitation number
FA461325R0005
Issued by
Department of the Air Force Global Strike Command

About this file

The file is an Air Force Form 66 Schedule of Material Submittals for a contract to replace overhead doors at Building 930. The solicitation (FA461325R0005) requires replacing 6 shop doors, which involves demolishing existing overhead doors, operators, and controls, and installing new coil-up doors with associated components. Key submission and response dates include: site visit requests due by 11:00 am MT on 26 March 2025, questions due by 11:00 am MT on 27 March 2025, and proposals due by 11:00 am MT on 4 April 2025. The form includes detailed tracking sections for material submittals, requiring documentation such as site safety plans, hazardous materials authorization forms, shop drawings, technical data, and manufacturer's warranties for insulated coiling doors and electrical wires and accessories. The solicitation notes that funds are not currently available, and the government reserves the right to cancel the solicitation, with no obligation to reimburse offerors for any costs.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 01* Replace Overhead Doors, newest first.
File Type Posted
Amendment 01 SF 30.pdf PDF
Attachment 7 Site Visit Q_A Responses.pdf PDF
Solicitation - FA461325R00050001.pdf PDF
Solicitation - FA461325R0005.pdf PDF
Attachment 1 Statement of Work 17March2025.pdf PDF
Attachment 6 HazMat Authorization Request.pdf PDF
Request for Proposal.pdf PDF
Attachment 5 Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 4 SF 24 Bid Bond Form.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 1a 130005_Environmental_Specifications_ Jan 2023.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 01

SCHEDULE OF MATERIAL SUBMITTALSPROJECT: Repair Bay Doors Bldg 930SOLICITATION/CONTRACT NO.
AF FORM 66Page 1 of 1Tririga # GHLN 25-0180
TO BE COMPLETED BY ARCHITECT-ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NUMBER ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION SCHEDULE OF MATERIALS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATING INSTRUCTIONS MSDS SHEETS TEST REPORTS MANUFACTURER'S WARRANTY REQUIRED SUBMISSION DATE fergusog: Enter the due date from the Contractor (DD/MMM/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (DD/MMM/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (DD/MMM/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(DD/MMM/YY)

SUBMITTAL NUMBER

fergusog: Enter the Submittal Number

CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(DD/MMM/YY)

REMARKS

fergusog: Enter any comments pertaining to the sumittal

App'd fergusog: Enter date the Contractor was notified of submittal approval

(DD/MMM/YY)

fergusog: Enter any comments pertaining to the sumittal Disapp'd fergusog: Enter date the Contractor was notified of submittal disapproval

(DD/MMM/YY)

Site Safety Planx
Hazardous Materials Authorization Request Formx
Insulated Coiling Doorsxxxxxxxxx
Electrial Wires and Accessoriesxxxxxx

Section 02 SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONSCHEDULES, LISTINGS,REPORTS, PLANSMANUFACTURER'S RECOMMENDATIONTECHNICAL DATAOPERATING INSTRUCTIONSTEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERCONTR NOTIACTOR FIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
AD
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Resubmittals SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONSCHEDULES, LISTINGS,REPORTS, PLANSMANUFACTURER'S RECOMMENDATIONTECHNICAL DATAOPERATING INSTRUCTIONSTEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERCONTR NOTIACTOR FIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
AD