Attachment 2 AF Form 66.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- AMENDMENT 01* Replace Overhead Doors Federal contract opportunity
- Solicitation number
- FA461325R0005
About this file
The file is an Air Force Form 66 Schedule of Material Submittals for a contract to replace overhead doors at Building 930. The solicitation (FA461325R0005) requires replacing 6 shop doors, which involves demolishing existing overhead doors, operators, and controls, and installing new coil-up doors with associated components. Key submission and response dates include: site visit requests due by 11:00 am MT on 26 March 2025, questions due by 11:00 am MT on 27 March 2025, and proposals due by 11:00 am MT on 4 April 2025. The form includes detailed tracking sections for material submittals, requiring documentation such as site safety plans, hazardous materials authorization forms, shop drawings, technical data, and manufacturer's warranties for insulated coiling doors and electrical wires and accessories. The solicitation notes that funds are not currently available, and the government reserves the right to cancel the solicitation, with no obligation to reimburse offerors for any costs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 01 SF 30.pdf | ||
| Attachment 7 Site Visit Q_A Responses.pdf | ||
| Solicitation - FA461325R00050001.pdf | ||
| Solicitation - FA461325R0005.pdf | ||
| Attachment 1 Statement of Work 17March2025.pdf | ||
| Attachment 6 HazMat Authorization Request.pdf | ||
| Request for Proposal.pdf | ||
| Attachment 5 Cost Estimate Breakdown.xlsx | XLSX spreadsheet | |
| Attachment 4 SF 24 Bid Bond Form.pdf | ||
| Attachment 3 Wage Determination.pdf | ||
| Attachment 1a 130005_Environmental_Specifications_ Jan 2023.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT: Repair Bay Doors Bldg 930 | SOLICITATION/CONTRACT NO. | ||
| AF FORM 66 | Page 1 of 1 | Tririga # GHLN 25-0180 | ||
| TO BE COMPLETED BY ARCHITECT-ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
LINE NUMBER ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION SCHEDULE OF MATERIALS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATING INSTRUCTIONS MSDS SHEETS TEST REPORTS MANUFACTURER'S WARRANTY REQUIRED SUBMISSION DATE fergusog: Enter the due date from the Contractor (DD/MMM/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (DD/MMM/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (DD/MMM/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(DD/MMM/YY)
SUBMITTAL NUMBER
fergusog: Enter the Submittal Number
CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(DD/MMM/YY)
REMARKS
fergusog: Enter any comments pertaining to the sumittal
App'd fergusog: Enter date the Contractor was notified of submittal approval
(DD/MMM/YY)
fergusog: Enter any comments pertaining to the sumittal Disapp'd fergusog: Enter date the Contractor was notified of submittal disapproval
(DD/MMM/YY)
| Site Safety Plan | x | |||||||||
| Hazardous Materials Authorization Request Form | x | |||||||||
| Insulated Coiling Doors | x | x | x | x | x | x | x | x | x | |
| Electrial Wires and Accessories | x | x | x | x | x | x |
Section 02 SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | SCHEDULES, LISTINGS,REPORTS, PLANS | MANUFACTURER'S RECOMMENDATION | TECHNICAL DATA | OPERATING INSTRUCTIONS | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | CONTR NOTI | ACTOR FIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS |
| A | D |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
| 26 |
| 27 |
| 28 |
| 29 |
| 30 |
| 31 |
| 32 |
| 33 |
| 34 |
| 35 |
Resubmittals SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | SCHEDULES, LISTINGS,REPORTS, PLANS | MANUFACTURER'S RECOMMENDATION | TECHNICAL DATA | OPERATING INSTRUCTIONS | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | CONTR NOTI | ACTOR FIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS |
| A | D |