Attachment 2 AF Form 66.xlsx

Air Force Form XLSX spreadsheet 39 KB Posted

Attached to
AMENDMENT 01* Replace Overhead Doors
Solicitation number
FA461325R0005
Issued by

About this file

The file is an Air Force Form 66 Schedule of Material Submittals for a contract to replace overhead doors at Building 930. The solicitation (FA461325R0005) requires replacing 6 shop doors, which involves demolishing existing overhead doors, operators, and controls, and installing new coil-up doors with associated components. Key submission and response dates include: site visit requests due by 11:00 am MT on 26 March 2025, questions due by 11:00 am MT on 27 March 2025, and proposals due by 11:00 am MT on 4 April 2025. The form includes detailed tracking sections for material submittals, requiring documentation such as site safety plans, hazardous materials authorization forms, shop drawings, technical data, and manufacturer's warranties for insulated coiling doors and electrical wires and accessories. The solicitation notes that funds are not currently available, and the government reserves the right to cancel the solicitation, with no obligation to reimburse offerors for any costs.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 01

SCHEDULE OF MATERIAL SUBMITTALSPROJECT: Repair Bay Doors Bldg 930SOLICITATION/CONTRACT NO.
AF FORM 66Page 1 of 1Tririga # GHLN 25-0180
TO BE COMPLETED BY ARCHITECT-ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NUMBER ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION SCHEDULE OF MATERIALS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATING INSTRUCTIONS MSDS SHEETS TEST REPORTS MANUFACTURER'S WARRANTY REQUIRED SUBMISSION DATE fergusog: Enter the due date from the Contractor (DD/MMM/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (DD/MMM/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (DD/MMM/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(DD/MMM/YY)

SUBMITTAL NUMBER

fergusog: Enter the Submittal Number

CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(DD/MMM/YY)

REMARKS

fergusog: Enter any comments pertaining to the sumittal

App'd fergusog: Enter date the Contractor was notified of submittal approval

(DD/MMM/YY)

fergusog: Enter any comments pertaining to the sumittal Disapp'd fergusog: Enter date the Contractor was notified of submittal disapproval

(DD/MMM/YY)

Site Safety Planx
Hazardous Materials Authorization Request Formx
Insulated Coiling Doorsxxxxxxxxx
Electrial Wires and Accessoriesxxxxxx

Section 02 SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONSCHEDULES, LISTINGS,REPORTS, PLANSMANUFACTURER'S RECOMMENDATIONTECHNICAL DATAOPERATING INSTRUCTIONSTEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERCONTR NOTIACTOR FIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
AD
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Resubmittals SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONSCHEDULES, LISTINGS,REPORTS, PLANSMANUFACTURER'S RECOMMENDATIONTECHNICAL DATAOPERATING INSTRUCTIONSTEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERCONTR NOTIACTOR FIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
AD