Attachment 7 Site Visit Q_A Responses.pdf

PDF 161 KB Posted

Attached to
AMENDMENT 01* Replace Overhead Doors Federal contract opportunity
Solicitation number
FA461325R0005
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a memorandum containing pre-proposal questions and answers for a Department of Air Force contract to replace overhead doors at Building 930. The solicitation (FA461325R0005) involves replacing 6 existing overhead doors with new coil-up doors, including demolition and installation of new operators, pushbutton controls, and associated components. Key questions addressed include electrical requirements (480 Volt 3 Phase power, breaker configurations), door specifications (galvanized grey finish, with one wash rack rated door), and equipment details (Raynor Control Optima Hoist NEMA 1 jackshaft operators). The contracting officer, 1Lt Andrew Graef, provides clarifications on conduit preservation, power configurations, and color approvals, indicating that the final product selection is dependent on the contractor's manufacturer choice.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 01* Replace Overhead Doors, newest first.
File Type Posted
Amendment 01 SF 30.pdf PDF
Solicitation - FA461325R00050001.pdf PDF
Solicitation - FA461325R0005.pdf PDF
Attachment 1 Statement of Work 17March2025.pdf PDF
Attachment 6 HazMat Authorization Request.pdf PDF
Request for Proposal.pdf PDF
Attachment 5 Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 4 SF 24 Bid Bond Form.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 2 AF Form 66.xlsx XLSX spreadsheet
Attachment 1a 130005_Environmental_Specifications_ Jan 2023.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

90TH MISSILE WING (AFGSC)

28 March 25

MEMORANDUM FOR 90 CES/CEM

FROM: 90 CONS/PKAB

SUBJECT: Pre-Proposal Questions for Replace Overhead Doors at Bldg. 930; Notice ID

FA461325R0005

Q1: The conduit for the existing garage doors is used to power receptacles on the outside of the garage doors. The scope calls for removal.

A1: Do not remove conduit used to power receptacles.

Q2: The new door opener requires 480 Volt 3 Phase, can one breaker be used to power more than one door opener? Each opener will have a disconnect for maintenance.

A2: Yes. One breaker can be used to power more than one door opener if there is a separate disconnect for each door opener.

Q3: Requesting motor information for wiring and breaker size.

A3: Basis of design is Provide 5 ea door operators to be Raynor Control Optima Hoist NEMA 1 jackshaft operator and 1 ea NEMA 4 jackshaft operator for carwash or approved equal. However, final product is dependent on manufacturer selection by the contractor.

Q4: Please confirm colors and that all 6 doors need to be galvanized.

A4: Color of all doors to be Grey Finish. Contractors to submit colors for approval prior to ordering. All doors to be galvanized with one door to be wash rack rated per Statement of Work.

Q5: I didn’t see spare 3 phase 480V breakers during the site walk, please confirm that spare breakers are available.

A5: There is space in two panels for breakers to be installed. Contractor to provide breakers.

ANDREW GRAEF, 1Lt, USAF