This document contains a material submittals schedule template for a federal construction project. The template requires contractors to provide information on required submittals such as shop drawings, samples, color selections, manufacturer recommendations, warranties, catalog data, operating instructions, schedules, lists, reports, plans, technical data, and test reports. Contractors must include the item description, contract reference, type of submittal, number of copies required, and remarks. They must also provide the required submission date, date received by the contracting office, date submitted to civil engineering for review, return suspense date from civil engineering, submittal number, date of notification to the contractor of approval or disapproval, and resubmittal number if needed.
The related federal contract opportunity is solicitation number FA481920R0018 for administrative services at Wright-Patterson Air Force Base. Offerors must submit all names for an upcoming site visit by the deadline in accordance with the solicitation terms. Prime contractors are limited to two personnel for the site visit.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| [ enter here ] | Project Title: | ||
| [ enter here ] | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | ||||||||||||||||||||||
| 2 | ||||||||||||||||||||||
| 3 | ||||||||||||||||||||||
| 4 | ||||||||||||||||||||||
| 5 | ||||||||||||||||||||||
| 6 | ||||||||||||||||||||||
| 7 | ||||||||||||||||||||||
| 8 | ||||||||||||||||||||||
| 9 | ||||||||||||||||||||||
| 10 | ||||||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date