Attachment 2_Appendix A Scope of Work.pdf

PDF 43 KB Posted

Attached to
WEG ADMIN 1801 Federal contract opportunity
Solicitation number
FA481920R0018
Issued by
Department of the Air Force Air Combat Command

About this file

This scope of work document outlines repair and restoration requirements for the WEG Administration Building 1801 at an Air Force base. Key tasks include replacing the raised flooring and supporting framework in several server rooms, upgrading lighting throughout the facility to LED, extending the VESDA fire detection system, assessing and optimizing the fire sprinkler system, balancing the HVAC system, and performing mold remediation and wall repairs in room 140. The solicitation seeks bids for the labor and materials to complete the tasks described in the scope of work by a specified deadline to support the Department of the Air Force Air Combat Command.

View the file

Other files for this federal contract opportunity

Other files attached to WEG ADMIN 1801, newest first.
File Type Posted
QuestionForm_08182020 Signed.pdf PDF
Solicitation Amendment FA481920R00180003 SF 30.pdf PDF
Solicitation Amendment FA481920R00180002 SF 30.pdf PDF
Appendix C Compressor House Photos.pdf PDF
Appendix A Scope of Work Updated.pdf PDF
Solicitation Amendment FA481920R00180001 SF 30.pdf PDF
Attachment 09_Sample RFI.PDF PDF
Attachment 06_AF Form 3000.pdf PDF
Solicitation - FA481920R0018.pdf PDF
Site Visit Document.xlsx XLSX spreadsheet
C02BB650.PDF PDF
Attachment 1_Statment of Work.pdf PDF
Attachment 08_AF3065.pdf PDF
82906804.PDF PDF
B477B440.PDF PDF
Attachment 04_Wage Determination.pdf PDF
Attachment 07_AF 3064.pdf PDF
Attachment 05_AF Form 66.xls XLS spreadsheet
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A – SCOPE OF WORK

XLWU208138 REPAIR (RESTORE) WEG ADMIN, BLDG 1801

Interior

Task 1 - Replace raised floor and supporting framework ~1610 sf

• Replace raised floor in room 114 (contractor will need to determine a way to replace the floor without removing or turning off all of the comm equipment – equipment is mission essential). ~ 1125 sf

• Replace raised floor and supporting framework in room 116 adjacent to room 114. ~ 110 sf

• Replace raised floor and supporting framework in room 117 adjacent to room 114. ~ 250 sf

• Replace raised floor and supporting framework in room 125 adjacent to room 114. ~ 125 sf

• Replace the supporting framework in room 114 holding up the floor (check UFC for floor certification requirements and load rating).

• Install wall-mounted placard stating flooring load rating in room 114 and room 117.

• Assess drywall for mold from A/C leak and replace as needed. Replace damaged baseboards in room 140.

Lighting

Task 2 - Replace lights in all server rooms with LED lighting. ~ (23) 1 by 4 without battery backup and (6) with battery backup. ~ (1) 2 by 4 with battery backup

• Replace 1 by 4 lights in room 114 with LED lighting. ~ 17 without battery backup and 3 with battery backup as required

• Replace 1 by 4 lights in room 116 with LED lighting. ~ 1 without battery backup and 1 with battery backup as required

• Replace 1 by 4 lights in room 117 with LED lighting. ~ 3 without battery backup and 2 with battery backup as required

• Replace 1 by 4 lights in room 125 with LED lighting. ~ 2 without battery backup and 0 with battery backup as required

• Replace 2 by 4 lights in room 140 with LED lighting. ~ 0 without battery backup and 1 with battery backup as required

Task 3 - Consider replacing lighting throughout the facility with LED lighting ~ 200 plus. ~200K

Fire Protection

Task 4 - Extend VESDA system to under the floor into room 114 from the master panel in room 124.

Task 5 - Assess and optimize fire sprinkler system in room 114. Equipment appears to be blocking the effectiveness of the sprinkler heads.

HVAC

Task 6 - Balance air conditioning system in room 114, 116, 117, 125 to effectively cool and dehumidify the rooms.

Wall Repair RM 140

Task 7 – Ensure drain from HVAC properly routed

Task 8 – Mold remediate Rm 140

Task 9 - Repair wall where HVAC has leaked

Task – Prep and paint wall repair