About this file

This document is a schedule of material submittals for a federal contract to maintain radio towers for the Department of the Air Force Global Strike Command. The schedule outlines twelve items requiring submittals from the contractor, including SDS/MSDS sheets, an EAL documentation, safety plan, project schedule, post-service drawings, samples of replacement parts, and an inspection report. Required number of copies and submission deadlines ranging from 10 days after award to upon final completion are specified. The related solicitation is for radio tower maintenance at multiple Air Force bases under solicitation number FA461324Q0001.

View the file

Other files for this federal contract opportunity

Other files attached to MAF Radio Tower Maintenance, newest first.
File Type Posted
Atch 8 Solicitation Questions and Answers.pdf PDF
FA461324Q001 Conformed Sol.pdf PDF
FA461324Q0001 Amd 02.pdf PDF
FA461324Q0001 Amd 01.pdf PDF
FA461324Q0001 Conformed Sol.pdf PDF
Solicitation - FA461324Q0001.pdf PDF
Atch 1 PWS 12Dec23.pdf PDF
Atch 3 AF 3000-Material Approval Submittal.pdf PDF
Atch 4a NIST SP 800-171 Assessment.pdf PDF
Atch 4 SPRS Registration.pdf PDF
Atch 5 Wage Determination.pdf PDF
Atch 4b NISTSP800-171 Entry Guide.pdf PDF
Atch 6 MFR UCNI Control and Receipt.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER SOLICITATION/CONTRACT NUMBER

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C

M

P L

IA

N

C E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E 'S

R

C

O M

M E

N D

A T

IO

N

S M

A N

U F

A C

T U

R E

'S

W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S T

R U

C T

IO

N

S

T E

S T

S

R E

P O

R T

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D

T

D

T E

R E

C E

IV

E

D I

C

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

SDS/MSDS Sheets (Section 01-General Requirements, Part C, #9)

2 Within 10 days of Award

EAL Documentation (Section: Security Requirements)

1 Within 10 days of Award

Project Schedule (Section 01-General Requirements, Part C, #13)

2 Within 10 days of Award

Safety Plan (Section 01-General Requirements, Part C, #12)

2 Within 10 days of Award

Post-Service Drawings (Section 01-General Requirements, Part C, #15)

4 Upon Final Completion

Non-Shrink Crack Sealant (Section 03- Concrete #B)

4 4 4 Not less than

15 days prior to site work

Replacement Bulb (Section 06-Electrical #A)

4 4 4 Not less than

15 days prior to site work

Replacement Bulb Socket (Section 04- Metals #B)

4 4 4 Not less than

15 days prior to site work

Tower, Acrylic Paint (Section 05-Finishes #B)

4 4 4 Not less than

15 days prior to site work

10 Tower, Bolt (Section 04-Metals #C) 4 4 4 Not less than

15 days prior to site work

Grounding Receptacle (Section 06- Electrical #B)

4 4 4 Not less than

15 days prior to site work

12 Inspection Report (Appendix III) 3 Upon Final Completion

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency

Maintain Radio Towers B-1, D-1, G-1, L-1, O-1. B3650GHLN 24-1256

PROJECT TITLE

File details come from the government source that posted it. Updated .