Atch 2 AF Form 66.pdf

Air Force Form PDF 461 KB Posted

Attached to
MAF Radio Tower Maintenance
Solicitation number
FA461324Q0001
Issued by

About this file

This document is a schedule of material submittals for a federal contract to maintain radio towers for the Department of the Air Force Global Strike Command. The schedule outlines twelve items requiring submittals from the contractor, including SDS/MSDS sheets, an EAL documentation, safety plan, project schedule, post-service drawings, samples of replacement parts, and an inspection report. Required number of copies and submission deadlines ranging from 10 days after award to upon final completion are specified. The related solicitation is for radio tower maintenance at multiple Air Force bases under solicitation number FA461324Q0001.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER SOLICITATION/CONTRACT NUMBER

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C

M

P L

IA

N

C E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E 'S

R

C

O M

M E

N D

A T

IO

N

S M

A N

U F

A C

T U

R E

'S

W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S T

R U

C T

IO

N

S

T E

S T

S

R E

P O

R T

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D

T

D

T E

R E

C E

IV

E

D I

C

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

F O

L L

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S

U B

M

IT

T A

L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPPROVED

SDS/MSDS Sheets (Section 01-General Requirements, Part C, #9)

2 Within 10 days of Award

EAL Documentation (Section: Security Requirements)

1 Within 10 days of Award

Project Schedule (Section 01-General Requirements, Part C, #13)

2 Within 10 days of Award

Safety Plan (Section 01-General Requirements, Part C, #12)

2 Within 10 days of Award

Post-Service Drawings (Section 01-General Requirements, Part C, #15)

4 Upon Final Completion

Non-Shrink Crack Sealant (Section 03- Concrete #B)

4 4 4 Not less than

15 days prior to site work

Replacement Bulb (Section 06-Electrical #A)

4 4 4 Not less than

15 days prior to site work

Replacement Bulb Socket (Section 04- Metals #B)

4 4 4 Not less than

15 days prior to site work

Tower, Acrylic Paint (Section 05-Finishes #B)

4 4 4 Not less than

15 days prior to site work

10 Tower, Bolt (Section 04-Metals #C) 4 4 4 Not less than

15 days prior to site work

Grounding Receptacle (Section 06- Electrical #B)

4 4 4 Not less than

15 days prior to site work

12 Inspection Report (Appendix III) 3 Upon Final Completion

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency

Maintain Radio Towers B-1, D-1, G-1, L-1, O-1. B3650GHLN 24-1256

PROJECT TITLE

File details come from the government source that posted it. Updated .