This document is a schedule of material submittals for a federal contract to maintain radio towers for the Department of the Air Force Global Strike Command. The schedule outlines twelve items requiring submittals from the contractor, including SDS/MSDS sheets, an EAL documentation, safety plan, project schedule, post-service drawings, samples of replacement parts, and an inspection report. Required number of copies and submission deadlines ranging from 10 days after award to upon final completion are specified. The related solicitation is for radio tower maintenance at multiple Air Force bases under solicitation number FA461324Q0001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 8 Solicitation Questions and Answers.pdf | ||
| FA461324Q001 Conformed Sol.pdf | ||
| FA461324Q0001 Amd 02.pdf | ||
| FA461324Q0001 Amd 01.pdf | ||
| FA461324Q0001 Conformed Sol.pdf | ||
| Solicitation - FA461324Q0001.pdf | ||
| Atch 1 PWS 12Dec23.pdf | ||
| Atch 3 AF 3000-Material Approval Submittal.pdf | ||
| Atch 4a NIST SP 800-171 Assessment.pdf | ||
| Atch 4 SPRS Registration.pdf | ||
| Atch 5 Wage Determination.pdf | ||
| Atch 4b NISTSP800-171 Entry Guide.pdf | ||
| Atch 6 MFR UCNI Control and Receipt.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M
P L
IA
N
C E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E 'S
R
C
O M
M E
N D
A T
IO
N
S M
A N
U F
A C
T U
R E
'S
W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
IN
S T
R U
C T
IO
N
S
T E
S T
S
R E
P O
R T
S
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N
D
T
D
T E
R E
C E
IV
E
D I
C
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S
U B
M
IT
T A
L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED DISAPPROVED
SDS/MSDS Sheets (Section 01-General Requirements, Part C, #9)
2 Within 10 days of Award
EAL Documentation (Section: Security Requirements)
1 Within 10 days of Award
Project Schedule (Section 01-General Requirements, Part C, #13)
2 Within 10 days of Award
Safety Plan (Section 01-General Requirements, Part C, #12)
2 Within 10 days of Award
Post-Service Drawings (Section 01-General Requirements, Part C, #15)
4 Upon Final Completion
Non-Shrink Crack Sealant (Section 03- Concrete #B)
4 4 4 Not less than
15 days prior to site work
Replacement Bulb (Section 06-Electrical #A)
4 4 4 Not less than
15 days prior to site work
Replacement Bulb Socket (Section 04- Metals #B)
4 4 4 Not less than
15 days prior to site work
Tower, Acrylic Paint (Section 05-Finishes #B)
4 4 4 Not less than
15 days prior to site work
10 Tower, Bolt (Section 04-Metals #C) 4 4 4 Not less than
15 days prior to site work
Grounding Receptacle (Section 06- Electrical #B)
4 4 4 Not less than
15 days prior to site work
12 Inspection Report (Appendix III) 3 Upon Final Completion
AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency
Maintain Radio Towers B-1, D-1, G-1, L-1, O-1. B3650GHLN 24-1256
PROJECT TITLE