MAF Radio Tower Maintenance
Closed Solicitation Posted
- Solicitation number
- FA461324Q0001
- Agency
-
Global Strike Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 811210 Electronic and Precision Equipment Repair and Maintenance
- Place of performance
- FE Warren AFB, Wyoming 82005, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks maintenance services for radio tower lighting and concrete foundations at multiple missile alert facilities located in Nebraska, Wyoming, and Colorado. The contractor shall provide all labor and materials necessary to maintain the towers as specified in the attached seventeen-page performance work statement from the Department of the Air Force Global Strike Command. Proposals are due by January 11, 2024 and will be evaluated on a firm fixed price basis. Questions were due by December 21, 2023.
This is a total small business set-aside solicitation with a primary NAICS code of 238210 and PSC code of R499. The potential place of performance includes the missile alert facilities in the three states listed as well as Francis E. Warren Air Force Base in Wyoming. The period of performance is 60 days upon issuance of the notice to proceed. Offerors must register in SAM.gov and complete the NIST SP 800-171 assessment in SPRS to receive controlled unclassified information attachments.
Notice text
3 versions
Update #3 · Latest ·
The Contractor shall provide all labor and materials necessary to maintain radio tower lighting and concrete foundations at the MAFs as specified in the attached Performance Work Statement (PWS) dated 12 Dec 23.
The purpose of Amendment 01 is to extend the proposal due date to 2:00 pm MT, 11 January 2024.
The purpose of Amendment 02 is to include Atch 8 Solicitation Questions and Answers document.
Please see attachments for details.
List of Attachments:
Solicitation - FA461324Q0001
Atch 1 PWS 12 Dec 23
Atch 2 AF-Form 66
Atch 3 AF 3000-Material Approval Submittal
Atch 4 SPRS-Registration
Atch 4a NIST-SP 800-171 Assessment
Atch 4b NIST-SP 800-171 Entry Guide
Atch 5 Wage-Determinaiton
Atch 6 MFR UNCI Control and Receipt
Atch 7 Drawings - to be obtained by submitting completed NIST-SP 800-171 and signed Atch 6
Atch 8 Solicitation Questions and Answers
Update #2 ·
The Contractor shall provide all labor and materials necessary to maintain radio tower lighting and concrete foundations at the MAFs as specified in the attached Performance Work Statement (PWS) dated 12 Dec 23.
The purpose of Amendment 01 is to extend the proposal due date to 2:00 pm MT, 11 January 2024. Amendment 02 is forthcoming with Q&A posting.
Please see attachments for details.
List of Attachments:
Solicitation - FA461324Q0001
Atch 1 PWS 12 Dec 23
Atch 2 AF-Form 66
Atch 3 AF 3000-Material Approval Submittal
Atch 4 SPRS-Registration
Atch 4a NIST-SP 800-171 Assessment
Atch 4b NIST-SP 800-171 Entry Guide
Atch 5 Wage-Determinaiton
Atch 6 MFR UNCI Control and Receipt
Update #1 ·
The Contractor shall provide all labor and materials necessary to maintain radio tower lighting and concrete foundations at the MAFs as specified in the attached Performance Work Statement (PWS) dated 12 Dec 23.
Please see attachments for details.
List of Attachments:
Solicitation - FA461324Q0001
Atch 1 PWS 12 Dec 23
Atch 2 AF-Form 66
Atch 3 AF 3000-Material Approval Submittal
Atch 4 SPRS-Registration
Atch 4a NIST-SP 800-171 Assessment
Atch 4b NIST-SP 800-171 Entry Guide
Atch 5 Wage-Determinaiton
Atch 6 MFR UNCI Control and Receipt
Files
Show all 14
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| USFK C4I Communication Tower and Facility Maintenance CY27 | Army Contracting Command | No set-aside | |
| CO OMAD 300(71) Minuteman Missile Access | Federal Highway Administration | Total Small Business | |
| B-52 APQ-166 Magnetron/Electron Tube | Air Force Sustainment Center | No set-aside | |
| Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID | ENDIST Seattle | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity