About this file

This document outlines the schedule of material submittals required for the Vertical Transportation Equipment (VTE) (Elevator) Missile Alert Facilities Maintenance solicitation issued by the Department of the Air Force Global Strike Command. The solicitation seeks maintenance, repair, and inspection services for elevators at 15 Missile Alert Facilities and requires submission of documentation including environmental permits, safety data sheets, storage plans, project schedules, testing results, inspection reports, warranties, and maintenance control programs on various deadlines between award and completion. The schedule specifies the number of copies, required submission dates, and spaces to track receipt, review periods, follow ups, resubmittals, and final approval of each item.

View the file

Other files for this federal contract opportunity

Other files attached to Vertical Transportation Equipment (VTE) (Elevator) Missile Alert Facilities Maintenance, newest first.
File Type Posted
FA461322R0006 VTE MAFs Amd01.pdf PDF
FA461322R0006 VTE MAFs Conformed Solicitation.pdf PDF
Atch 4b NISTSP800-171 Entry Guide.pdf PDF
Atch 1 PWS 5 May 2022.pdf PDF
Atch 3 MFR UCNI Control and Receipt.pdf PDF
Atch 4 SPRS Registration.pdf PDF
Atch 5 Combined SCA Wage Det.pdf PDF
Atch 6 Price Proposal Breakdown.xlsx XLSX spreadsheet
FA461322R0006 VTE MAFs Solicitation.pdf PDF
Atch 4a NIST SP 800-171 Assessment.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER SOLICITATION/CONTRACT NUMBER

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N

D

TE

TE

R

EC

EI

VE

IN

C O

N

TR

A C

TI

N

G

D A

TE

T

O C

IV

IL

EN

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

R

R

ES

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPPROVED

1 EAL Documentation 1 Within 10 Days Award

2 All Permits (Local, State, and Federal) NPDES, ROW, or Other 4 Per MAF

3 Material Safety Data Sheets 4 After Award

4 HAZMAT Authorization Request (If required) 4 After Award

5 Storage Plan (If required) 4 After Award

6 Project Schedule 4 15 Days

After Award & Monthly

7 All Testing Results 4 5 Days After Test

8 Written Reports 4 5 Days After Repair

9 Inspection Reports 4 5 Days After Inspection

10 Elevator Certification 4 4 5 Days After Inspection

11 As-Built Drawings for any modification to a Site (If required) 4 30 Prior to

CO

12 Warranty (For Repair Service and Parts) (If required) 4 4 4 4 30 Prior to

CO

13 Elevator Techician/Inspector Licence or Certification, per State. 4 5 Days After

Inspection

14 Maintenance Control Program 30 days after Initial

VTE

Inspection

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency

PROJECT TITLE

VTE Maintenance, Repair, and Inspection Services at 15

MAFsGHLN 22-9093

Sheet 1

File details come from the government source that posted it. Updated .