Atch 2 AF Form 66.pdf
PDF 87 KB Posted
- Attached to
- Vertical Transportation Equipment (VTE) (Elevator) Missile Alert Facilities Maintenance Federal contract opportunity
- Solicitation number
- FA461322R0006
About this file
This document outlines the schedule of material submittals required for the Vertical Transportation Equipment (VTE) (Elevator) Missile Alert Facilities Maintenance solicitation issued by the Department of the Air Force Global Strike Command. The solicitation seeks maintenance, repair, and inspection services for elevators at 15 Missile Alert Facilities and requires submission of documentation including environmental permits, safety data sheets, storage plans, project schedules, testing results, inspection reports, warranties, and maintenance control programs on various deadlines between award and completion. The schedule specifies the number of copies, required submission dates, and spaces to track receipt, review periods, follow ups, resubmittals, and final approval of each item.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA461322R0006 VTE MAFs Amd01.pdf | ||
| FA461322R0006 VTE MAFs Conformed Solicitation.pdf | ||
| Atch 4b NISTSP800-171 Entry Guide.pdf | ||
| Atch 1 PWS 5 May 2022.pdf | ||
| Atch 3 MFR UCNI Control and Receipt.pdf | ||
| Atch 4 SPRS Registration.pdf | ||
| Atch 5 Combined SCA Wage Det.pdf | ||
| Atch 6 Price Proposal Breakdown.xlsx | XLSX spreadsheet | |
| FA461322R0006 VTE MAFs Solicitation.pdf | ||
| Atch 4a NIST SP 800-171 Assessment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
O
N
D
TE
TE
R
EC
EI
VE
IN
C O
N
TR
A C
TI
N
G
D A
TE
T
O C
IV
IL
EN
G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
TO
R
R
ES
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPPROVED
1 EAL Documentation 1 Within 10 Days Award
2 All Permits (Local, State, and Federal) NPDES, ROW, or Other 4 Per MAF
3 Material Safety Data Sheets 4 After Award
4 HAZMAT Authorization Request (If required) 4 After Award
5 Storage Plan (If required) 4 After Award
6 Project Schedule 4 15 Days
After Award & Monthly
7 All Testing Results 4 5 Days After Test
8 Written Reports 4 5 Days After Repair
9 Inspection Reports 4 5 Days After Inspection
10 Elevator Certification 4 4 5 Days After Inspection
11 As-Built Drawings for any modification to a Site (If required) 4 30 Prior to
CO
12 Warranty (For Repair Service and Parts) (If required) 4 4 4 4 30 Prior to
CO
13 Elevator Techician/Inspector Licence or Certification, per State. 4 5 Days After
Inspection
14 Maintenance Control Program 30 days after Initial
VTE
Inspection
AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency
PROJECT TITLE
VTE Maintenance, Repair, and Inspection Services at 15
MAFsGHLN 22-9093
Sheet 1
File details come from the government source that posted it. Updated .