Atch 05 AF Form 66.pdf

PDF 1 MB Posted

Attached to
FXSB 21-1051 MAINTAIN PAINT EXTERIOR B5257 Federal contract opportunity
Solicitation number
FA500021R0047
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document outlines the submittal requirements and schedule for a federal contract to maintain and paint the exterior of Building 5257 at Joint Base Elmendorf-Richardson in Alaska. Key requirements include removing and disposing of lead-based paint from various exterior surfaces, preparing all surfaces according to coating manufacturer's guidance, and applying one primer coat and two final coats of paint in the specified colors. Submittals such as construction schedules, health and safety plans, lead compliance plans, product data and samples, daily reports, design drawings, and as-built documentation must be provided according to the specified deadlines. The solicitation number is FA500021R0047 and was issued by the Department of the Air Force Pacific Air Forces for the project FXSB 21-1051 to maintain and paint the exterior of Building 5257.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LI

N

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

GENERAL

Project Specific Form 66 X NTP + 30 Construction Schedule X NTP + 30 Contractor's QA/QC Plan X NTP + 30 Contractor's Health, Safety, and Environment Plan X NTP + 30 Written Hazard Communication Program X NTP + 30

LEAD COMPLIANCE WORK PLAN X X NTP + 30

LEAD WASTE MANAGEMENT PLAN X X NTP + 30

Disposal of Lead Containing Material X X NTP + 30 Disposal of Non-Lead Containing Material X NTP + 30 Medical Certification X NTP + 30 Landfill Approval X NTP + 30 Hazardous material Sampling and analysis plan and schedule. X NTP + 30

Hazard Material List X

Prior to bringing any materials on base.

Safety Data Sheets (SDSs) X

Prior to bringing any materials on base.

Accumulation point daily and weekly inspection summary sheets X

Once per week after issue of Starting Work on Order

Name, phone number and experience resume of the Emergency Coordinator X

Once per week after issue of Starting Work on Order

Record of Training for Contractor Employees X NTP + 30

Manufacturer's Certificate of Compliance X X X 30 Days Prior

To Starting Work on Order.

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 21-1051 MAINTAIN PAINT

EXTERIOR B5257

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA500021R0047 FXSB 21-1051 Maintain Paint Exterior B5257 Attachment 5 - AF Form 66

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 21-1051 MAINTAIN PAINT

EXTERIOR B5257

Manufacturers Warranty X X 30 Days Prior

To Starting Work on Order.

Testing Laboratory X 30 Days Prior

To Starting Work on Order.

Product Data Submitals *MANUFACTURERS

DATA X X X X X NTP + 30

Paint COLOR selection *PHYSICAL SAMPLES

*MANUFACTURERS DATA X X X X X NTP + 30

Daily Reports X 30 Days Prior

To Starting Work on Order

Copy of Engineering License(s) of person or consultancy responsible for design X Design

DESIGN

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 35% design, at a minimum, shall be a Scope of Work narrative:

X NTP + 30

(35%)

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 65% Design Drawings to include:

X NTP + 60

(65%)

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 95% Design Drawings to include:

X NTP + 75

(95%)

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA500021R0047 FXSB 21-1051 Maintain Paint Exterior B5257

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 21-1051 MAINTAIN PAINT

EXTERIOR B5257

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 100% Design Drawings, shall be stamped by a Professional registered in the State of Alaska, Design Drawings to include:

X NTP + 90

(100%) Design and Stamped Required

Floor Plan, Elevations, Sections, Schedules, and Details X NTP + 60

Electrical Layout X NTP + 60

DEMOLITION/ASBESTOES

Demolition Plan X NTP + 60

ARCHITECTURAL

Doors and Frames X X X X X NTP + 30 Door Hardware X X NTP + 30 Gypsum Board-All Types Used X NTP + 30 Rubber Base X X NTP + 30 Interior Paint X X NTP + 30 Exterior Paint X X NTP + 30

MECHANICAL

Thermal Insulation X X X X X X NTP + 45

ELECTRICAL

Cables(electrical,comm,fire alarm) X NTP + 45 Swtches X NTP + 45 Receptacles X NTP + 45 Provide Updated Electrical one-line Diagram, x x NTP + 45 Panels X NTP + 45 Provide Updated "Printed" Panel Scheduals x x NTP + 45 Breakers X NTP + 45 Conduits X NTP + 45

CLOSEOUT

DD 1354 X X Before Acceptance

Factory and Field Test Certificates, Logs and Test Results X X Before

Acceptance

As Builts (see REVISED JBER CAD STANDARD) X Install + 7

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA500021R0047 FXSB 21-1051 Maintain Paint Exterior B5257

File details come from the government source that posted it. Updated .