Attachment 2 Amendment 01 Drawings.pdf

PDF 8 MB Posted

Attached to
FXSB 21-1051 MAINTAIN PAINT EXTERIOR B5257 Federal contract opportunity
Solicitation number
FA500021R0047
Issued by
Department of the Air Force Pacific Air Forces

About this file

This solicitation and supporting documents outline requirements for a federal contract to maintain and paint the exterior of Building 5257 at Joint Base Elmendorf-Richardson in Alaska. The scope of work includes removing lead-based paint from metal and concrete surfaces, properly disposing of hazardous waste, surface preparation, and applying one primer coat and two finish coats of paint. Colors will be G11 Rock Tan for field areas and 1236 Sorrel Brown for accents. Drawings provide the location, floor plans, elevations and details to identify areas and components that are included in and excluded from the painting scope. The solicitation is being issued by the Department of the Air Force Pacific Air Forces for general contracting services.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOINT BASE ELMENDORF-RICHARDSON

673RD CIVIL ENGINEER SQUADRON

PROJECT LOCATION

KEY PLAN

(SEE KEY PLAN)

TRUE

NORTH

MAP KEY

LOCATION DESCRIPTION

RICHARDSON VISITORS GATE

ARCTIC VALLEY GATE GLENN HWY SOUTHBOUND EXIT

ELMENDORF VISITORS GATE

654 6TH STREET: FIRE STATION 4

8517 20TH STREET: SECURITY FORCES

730 QUARTERMASTER ROAD: 673D CES CONTRACT MANAGEMENT

10480 SIJAN AVENUE: CONTRACTING

PROJECT NOTES:

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

1. AT NO TIME WILL THE CONTRACTORS WORK, STORAGE OF MATERIALS, PARKING OF VEHICLES OR OTHER ACTIVITIES BE ALLOWED TO INTERFERE WITH THE WORK ACTIVITIES OF

GOVERNMENT PERSONNEL OR TO DAMAGE GOVERNMENT OR PRIVATE PROPERTY.

2. PARKING SHALL BE ALLOWED IN APPROVED PARKING SPACES ONLY. VEHICLES OTHERWISE PARKED SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

3. THE CONTRACTOR'S MATERIALS AND EQUIPMENT SHALL NOT BE STORED WITHIN 20 FEET O F ANY BUILDING, OBSTRUCT FIRE EXITS OR OTHERWISE INTERFERE WITH FIRE FIGHTING

FACILITIES. ANY MATERIALS, EQUIPMENT OR VEHICLES DOING SO WILL BE REMOVED AT THE CONTRACTOR'S EXPENSE.

4. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE WORK AREA FREE FROM ACCUMULATION OF WASTE MATERIALS. DEBRIS SHALL BE REMOVED ON A DAILY BASIS.

5. ALL WELDING AND / OR THE USE OF FLAME PRODUCING DEVICES SHALL BE CLEARED THROUGH THE FIRE DEPARTMENT.

6. ALL CONSTRUCTION PERMITS, FEES AND COORDINATION OF ANCILLARY ITEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

7. THE WORK OF THIS CONTRACT SHALL COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES OR STANDARDS. ALL WORK SHALL COMPLY WITH THE MOST RECENT ADOPTED

EDITION OF THE CODES OR STANDARDS THAT FOLLOW:

EPA STANDARDS INTERNATIONAL BUILDING CODE INTERNATIONAL FUEL GAS CODE INTERNATIONAL MECHANICAL CODE INTERNATIONAL PLUMBING CODE

NATIONAL ELECTRICAL CODE NATIONAL ELECTRICAL SAFETY CODE NATIONAL FIRE PROTECTION ASSOCIATION OSHA STANDARDS

SHEET METAL AND AIR CONDITIONING CONTRACTOR'S NATIONAL ASSOCIATION INC. FIRE CODES

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ARCH

E1

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

J K

G-001

LOCATION PLAN

AND SCHEDULE

OF DRAWINGS

MAINTAIN

PAINT

EXTERIOR

BLDG 5257

FXSB211051G001.dwg

FXSB 21-1051

NONE

HENDLER

COLBURN

TYLER

CAUSEWAY

SCHEDULE OF DRAWINGS

SHEET REFERENCE NUMBER SHEET TITLE

G-001 LOCATION PLAN AND SCHEDULE OF DRAWING

C-100 SITE PLAN

C-101 CAUSEWAY PLAN, SECTION AND ISOMETRIC EXHIBIT DRAWING

S-100 REPAIR DETAILS

A-100 EXTERIOR WALL PLAN

A-200 EXTERIOR ELEVATIONS EXHIBIT DRAWING

A-900 EXTERIOR PHOTOS

FA500021R0047 FXSB- 21-1051 Maintain Paint Exterior B5257 Amendment 01 – Attachment 2 - Drawings

TRUE

NORTH

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ARCH

E1

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

J K

C-100

SITE PLAN

MAINTAIN

PAINT

EXTERIOR

BLDG 5257

FXSB211051C100.dwg

FXSB 21-1051

NONE

HENDLER

COLBURN

TYLER

CAUSEWAY

A900

A900

A900

A900

A900

A900

A900

EQUIPMENT

YARD

9TH STREET

F I N

L E

T T

E R

A

V E

SHEET NOTES:

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

THE FOLLOWING ARE NOT TO BE CLEANED AND RE-PAINTED IN ANY MANNER:

1. ELECTRICAL PANELS, ELECTRIC METER AND ASSOCIATED CONDUIT.

2. ALL WINDOWS WITH SECURITY BARS / SCREENS COVERING THEM.

3. HVAC UNIT, SUPPORTING STANDS AND WORK PLATFORMS / LADDERS.

4. ALL EXTERIOR LIGHT FIXTURES.

5. ALL SIGNS SHALL BE REMOVED PRIOR TO SURFACE PREPARATION AND

CLEANED AND RE-INSTALLED AFTER CURE OF FINAL FINISH COAT.

6. COIL / ROLL-UP BAY DOORS.

FA500021R0047 FXSB- 21-1051 Maintain Paint Exterior B5257

1025779599C Callout The Causeway from BLDG 5257 to 5250 will be demolished and a new Causeway will be constructed under an existing project and painting Causeway is not part of this project.

1025779599C Callout Ramp

1025779599C Callout Ramp

1025779599C Callout Ramp

1025779599C Line

1025779599C Line

1025779599C Line

1025779599C Line

1025779599C Line

1025779599C Line

1025779599C Callout Equipment Yard Retaining wall

1025779599C Callout Equipment Yard Retaining wall

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ARCH

E1

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

J K

C-101

CAUSEWAY

PLAN, SECTION

AND ISOMETRIC

MAINTAIN

PAINT

EXTERIOR

BLDG 5257

FXSB211051C101.dwg

FXSB 21-1051

NOT TO SCALE

HENDLER

COLBURN

TYLER

A

S

B

U

I

L

T

X

H

I

B

I

C

O

N

T

R

A

C

T

S

H

A

F

E

D

R

I

Y

M

E

N

S

I

O

N

S

SCALE: NOT TO SCALE

CAUSEWAY PLAN

SCALE: NOT TO SCALE

CAUSEWAY PLAN ENLARGED

SCALE: NOT TO SCALE

CAUSEWAY PLAN @ BENDS

SCALE: NOT TO SCALE

CAUSEWAY ISOMETRIC

SCALE: NOT TO SCALE

CAUSEWAY SECTION TYPICAL

SHEET NOTES:

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

THE FOLLOWING ARE NOT TO BE CLEANED AND RE-PAINTED IN ANY MANNER:

1. ELECTRICAL PANELS, ELECTRIC METER AND ASSOCIATED CONDUIT.

2. ALL WINDOWS WITH SECURITY BARS / SCREENS COVERING THEM.

3. HVAC UNIT, SUPPORTING STANDS AND WORK PLATFORMS / LADDERS.

4. ALL EXTERIOR LIGHT FIXTURES.

5. ALL SIGNS SHALL BE REMOVED PRIOR TO SURFACE PREPARATION AND

CLEANED AND RE-INSTALLED AFTER CURE OF FINAL FINISH COAT.

6. COIL / ROLL-UP BAY DOORS.

SHEET NOTES:

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

SCALE: NONE

CONCRETE REPAIR - SEVERE CRACKS

D-1

NOTES:

A. ROUTE A V-GROOVE AT CRACK SURFACE UNTIL SOUND MATERIAL IS REACHED. CLEAN

CRACKS.

B. FOR EPOXY INJECTION, APPLY SURFACE SEAL OVER ALL EXTERIOR FACES OF CRACK.

INSTALL INJECTION AND VENTING PORTS PER MANUFACTURER'S INSTRUCTIONS.

C. INJECT EPOXY MEETING THE REQUIREMENTS OF ACI 584.12 FOLLOWING MANUFACTURER'S

INSTRUCTIONS.

1. (E) CONC. WALL OR COL.

2. PARTIAL DEPTH CRACK.

3. THRU-WALL CRACK.

4. V-GROOVE. NOTE A.

5. SEAL. NOTE B.

NOTES:

A. CONTRACTOR TO PROVIDE TEMPORARY SHORING AS REQUIRED TO SUPPORT WALL

DURING RESHORING.

B. CAREFULLY RAKE OUT EXISTING MORTAR USING NON-IMPACT TOOLS ONLY. CLEAN

JOINTS PRIOR TO PLACING MORTAR.

C. FOR FULL-DEPTH REPOINTING, REPOINT IN STAGES ALLOWING EACH STAGE TO CURE

BEFORE RAKING AND REPOINTING THE NEXT STAGE. PROVIDE TEMPORARY SHIMS AND

SUPPORTS AS NEEDED. REPAIR VOIDS LEFT BY SHIMS AND SUPPORTS WHEN NO

LONGER NEEDED.

1. (E) MASONRY INFILL

2. (E) 1/4" -1/2" MORTAR

JOINT.

3. RAKE JOINT TO

WHICHEVER DEPTH IS

GREATER:

a. 5/8"

b. 2x JOINT WIDTH

c. DEPTH REQUIRED TO

REMOVE PREVIOUSLY

POINTED PORTLAND

CEMENT MORTAR.

SCALE: NONE

MASONRY REPOINTING

D-4

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ARCH

E1

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

J K

S-100

REPAIR DETAILS

MAINTAIN

PAINT

EXTERIOR

BLDG 5257

FXSB211051S100.dwg

FXSB 21-1051

NOT TO SCALE

HENDLER

COLBURN

TYLER

THE FOLLOWING ARE NOT TO BE CLEANED AND RE-PAINTED IN ANY MANNER:

1. ELECTRICAL PANELS, ELECTRIC METER AND ASSOCIATED CONDUIT.

2. ALL WINDOWS WITH SECURITY BARS / SCREENS COVERING THEM.

3. HVAC UNIT, SUPPORTING STANDS AND WORK PLATFORMS / LADDERS.

4. ALL EXTERIOR LIGHT FIXTURES.

5. ALL SIGNS SHALL BE REMOVED PRIOR TO SURFACE PREPARATION AND

CLEANED AND RE-INSTALLED AFTER CURE OF FINAL FINISH COAT.

6. COIL / ROLL-UP BAY DOORS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ARCH

E1

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

J K

A-100

EXTERIOR WALL

PLAN

MAINTAIN

PAINT

EXTERIOR

BLDG 5257

FXSB211051A100.dwg

FXSB 21-1051

NOT TO SCALE

HENDLER

COLBURN

TYLER

SCALE: NOT TO SCALE

EXTERIOR WALL PLAN

TRUE

NORTH

14'-0" WIDE X 16'-0"

TALL OVERHEAD

COILING DOOR

14'-0" WIDE X 14'-0"

TALL OVERHEAD

COILING DOOR

VEHICLE RAMP

14'-0" WIDE X 16'-0" TALL

COMMERCIAL STEEL

INSULATED SECTIONAL

DOOR

SECTIONAL BAY DOOR

3 EACH SECTIONAL BAY

DOORS

SECTIONAL BAY DOOR

SECTIONAL BAY DOOR

COIL / ROLL-UP BAY

DOOR NOT TO BE

PAINTED

VEHICLE RAMP

C

A

U

S

E

W

A

Y

SHEET NOTES:

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

THE FOLLOWING ARE NOT TO BE CLEANED AND RE-PAINTED IN ANY MANNER:

1. ELECTRICAL PANELS, ELECTRIC METER AND ASSOCIATED CONDUIT.

2. ALL WINDOWS WITH SECURITY BARS / SCREENS COVERING THEM.

3. HVAC UNIT, SUPPORTING STANDS AND WORK PLATFORMS / LADDERS.

4. ALL EXTERIOR LIGHT FIXTURES.

5. ALL SIGNS SHALL BE REMOVED PRIOR TO SURFACE PREPARATION AND

CLEANED AND RE-INSTALLED AFTER CURE OF FINAL FINISH COAT.

6. COIL / ROLL-UP BAY DOORS.

DOOR NOT TO BE PAINTED

DOORS NOT TO BE PAINTED

B

U

I

X

H

I

B

C

N

T

R

A

C

T

H

A

E

R

I

Y

M

E

N

S

I

O

N

S

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ARCH

E1

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

J K

A-200

EXTERIOR

ELEVATIONS

MAINTAIN

PAINT

EXTERIOR

BLDG 5257

FXSB211051A200.dwg

FXSB 21-1051

NOT TO SCALE

HENDLER

COLBURN

TYLER

SHEET NOTES:

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

THE FOLLOWING ARE NOT TO BE CLEANED AND RE-PAINTED IN ANY MANNER:

1. ELECTRICAL PANELS, ELECTRIC METER AND ASSOCIATED CONDUIT.

2. ALL WINDOWS WITH SECURITY BARS / SCREENS COVERING THEM.

3. HVAC UNIT, SUPPORTING STANDS AND WORK PLATFORMS / LADDERS.

4. ALL EXTERIOR LIGHT FIXTURES.

5. ALL SIGNS SHALL BE REMOVED PRIOR TO SURFACE PREPARATION AND

CLEANED AND RE-INSTALLED AFTER CURE OF FINAL FINISH COAT.

6. COIL / ROLL-UP BAY DOORS.

A B C D E F G H

F I L

E

N

O

I

SHEET

REFERENCE

NUMBER

ARCH

E1

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

D E

S C

R I P

T I O

N

R E

V I S

I O

N S

RICHARDSON, ALASKA

AF CONTRACT NUMBER:

FACILITY NO:

D A

T E

A P

P R

O V

E R

JOINT BASE ELMENDORF

PROJ. MGR:

DRAFTER:

CHECKER:

PROJ. ENGR:

DATE:

DATE:

DATE:

DATE:

DESIGNER LOGO

AIR FORCE

S Y

M B

O L

D A

T E

J K

A-900

EXTERIOR

PHOTOS

MAINTAIN

PAINT

EXTERIOR

BLDG 5257

FXSB211051A900.dwg

FXSB 21-1051

NOT TO SCALE

HENDLER

COLBURN

TYLER

SCALE: NOT TO SCALE

EXTERIOR ELEVATION SOUTH FACING

SCALE: NOT TO SCALE

EXTERIOR ELEVATION @ WEST FACING CAUSEWAY

SCALE: NOT TO SCALE

EXTERIOR ELEVATION @ EAST FACING CAUSEWAY

SCALE: NOT TO SCALE

EXTERIOR ELEVATION SOUTH FACING

SCALE: NOT TO SCALE

EXTERIOR ELEVATION @ EAST END

SCALE: NOT TO SCALE

EXTERIOR PANORAMIC ELEVATION ALONG 9TH STREET

SCALE: NOT TO SCALE

EXTERIOR ELEVATION & WEST END

SCALE: NOT TO SCALE

TYP. SIDING & FOUNDATION DAMAGE

SCALE: NOT TO SCALE

TYP. EXTERIOR CORRAGATED SIDING

SCALE: NOT TO SCALE

TYPICAL CONCRETE PAINT DAMAGE

FOUNDATION FOUNDATION

SHEET NOTES:

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

THE FOLLOWING ARE NOT TO BE CLEANED AND RE-PAINTED IN ANY MANNER:

1. ELECTRICAL PANELS, ELECTRIC METER AND ASSOCIATED CONDUIT.

2. ALL WINDOWS WITH SECURITY BARS / SCREENS COVERING THEM.

3. HVAC UNIT, SUPPORTING STANDS AND WORK PLATFORMS / LADDERS.

4. ALL EXTERIOR LIGHT FIXTURES.

5. ALL SIGNS SHALL BE REMOVED PRIOR TO SURFACE PREPARATION AND

CLEANED AND RE-INSTALLED AFTER CURE OF FINAL FINISH COAT.

6. COIL / ROLL-UP BAY DOORS.

AS-BUILT EXHIBIT

CONTRACTOR SHALL FIELD

VERIFY ALL DIMENSIONS

VERIFY ALL DIMENSIONS

VERIFY ALL DIMENSIONS

Drawings
G-001
Sheets and Views
Layout1
C-100
Sheets and Views
Layout1
C-101
Sheets and Views
Layout1
S-100
Sheets and Views
Layout1
A-100
Sheets and Views
Layout1
A-200
Sheets and Views
Layout1
A-900
Sheets and Views
Layout1
elm_d038_p1_ef0057
elm_d038_p1_ef0060
Panel F elm_d038_p1_ef0056
C-100.pdf
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .