Appendix G - AF Form 66.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Construct AFTP Fence, Louisiana Avenue Bridge
- Solicitation number
- FA481924R0017
About this file
This document is an Appendix G - AF Form 66.xlsx, which appears to be a Material Submittals Schedule for a federal contract opportunity. The related federal contract opportunity is for the construction of an anti-terrorism force protection (ATFP) fence on Tyndall AFB, Florida, with Solicitation Number FA481924R0017. The scope of work includes demolition of existing fencing and construction of a new ATFP fence to meet DoD security standards. The document provides a detailed schedule for the contractor to submit various materials, including certificates of compliance, shop drawings, samples, manufacturer's recommendations and warranties, and test reports. The schedule includes fields for tracking the submission, review, and approval process. As this is an appendix, it does not provide additional details about the overall contract requirements or terms.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| XLWU 23-4039 | Project Title: | ||
| Construct ATFP Fence Louisiana Bridge | Solicitation / Contract Number: |
FA481924R0017
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).
&P of &N
File details come from the government source that posted it. Updated .