This document appears to be an Appendix C - AF 66 Submittal Register related to a Request for Proposal (RFP) for the construction of an anti-terrorism force protection (ATFP) fence at Tyndall AFB in Florida. The RFP, solicitation number FA481924R0017, is for the Construct AFTP Fence, Louisiana Avenue Bridge project.
The submittal register lists the required documents and materials that the contractor must submit for approval, including the Integrated Master Schedule, Quality Control Plan, Health and Safety Plan, Environmental Protection Plan, and various test reports and technical specifications for the fence components. It specifies the required submission dates and the approval status for each submittal item. The project is being managed by the Department of the Air Force Air Combat Command.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XLWU 23-4039
March 26, 2024
APPENDIX - C
AF 66 Submittal Register
For
REQUEST FOR PROPOSAL
CONSTRUCT ATFP FENCE,
LOUISIANA BRIDGE
TYNDALL AFB FLORIDA
FOR PROJECT XLWU 23-4039
APPROVED DISAPPROVED
Integrated Master Schedule
(IMS) X 15 Days following award
2 FORM AF103
(Work Clearance Request) X Prior to
Construction See SOW
3 Quality Control Plan X Prior to Construction
See SOW
4 Health and Safety Plan X Prior to Construction
See SOW
5 Environmental Protection Plan X Prior to Construction
See SOW
6 HAZMAT Forms 81 and 82 X X Prior to Construction
See SOW
7 All Permits X See SOW
8 Draft DD Form 1354 X See SOW
9 Final DD Form 1354 X See SOW
10 Grounding System Test Reports X X X 5 Days following testing
11 Field Change Documentation X Maintain in construction trailer, provide to Govt. upon request
12 Red-Lined Drawings and Documentation X See SOW, 13 Warranty Documentation X Final Inspection
14 Fence Fabric X Prior to Construction
Prior to Construction
15 Brace Rails X Prior to Construction
Prior to Construction
16 Line Posts X Prior to Construction
Prior to Construction
17 Terminal Posts X Prior to Construction
Prior to Construction
18 Reinforceing Cables Assembly X Prior to Construction
Prior to Construction
19 Pipe Bollards X Prior to Construction
Prior to Construction
20 Concrete Mix Design X
Anchorage Turn Buckle Assemby X
DIGITAL SUBMISSIONS WHEREVER POSSIBLE UNLESS OTHERWISED DIRECTED - SUBMITTALS TO BE ACCOMPANIED BY AF FORM 3000
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
TE
S
T R
E P
O R
TS
O
TH
E R
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
C A
TA
LO
G D
A
TA
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
IN
G
R E
TU
R
N S
U S
P E
N S
E D
A
TE
S U
B M
IT
TA
L N
U M
B E
R S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E R
'S R
E C
O M
M E
N D
A
TI
O N
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Name:
CONSTRUCT ATFP FENCE, SITE C
Solicitation/Contract Number
FA4819-XX-XX-XXXXSCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No. XLWU 23-4029
REQUIRED SUBMISSION DATE
AF Form 66 (Computer Generated) Page 1 of 1
Prior to Construction Prior to Construction
Prior to Construction
Prior to Construction
| ADPA29C.tmp |
| Sheet1 |
File details come from the government source that posted it. Updated .