About this file

This is a technical specification document for sanitary wastewater process piping related to the Biosolids Project 011139.0465 being undertaken by Ephrata Borough Authority in Pennsylvania. The specification details the requirements for pipes, tubes, valves, and related components used to convey sanitary wastewater within the project. The work includes the installation of ductile iron process pipe, plug valves, and swing check valves for shutoff, drain, isolation, and bypass services as indicated on project drawings. The specification requires that manufacturers have a minimum of three years of documented experience in manufacturing the specified products and that installers have equivalent experience in performing this type of work. Bidding documents are available through PennBid at https://pennbid.bonfirehub.com/, with bids due by December 8, 2026 at 10:00 AM local time. A pre-bid open house is scheduled for November 18, 2026 from 8:00 AM to 10:00 AM. The project involves two separate contracts: Contract No. EBA26-2 for General Construction and Contract No. EBA26-3 for Electrical Construction.

The specification establishes comprehensive submittal requirements including product data, shop drawings, manufacturer's certificates, welder certifications, and manufacturer instructions for installation, storage, and handling. Installation must comply with ASME B31.3 Process Piping Design standards and AWS D1.1/D1.1M Structural Welding Code standards. The document requires field quality control through inspection for damage to pipe lining and coatings, pressure testing as indicated on pipe schedules, and repair of damaged coatings with materials equal to the original coating. Contractors must demonstrate valve operation and maintenance procedures to the Owner's personnel and maintain clean piping and valve interiors throughout installation. The specification references related sections for couplings, adapters, hangers, supports, and common valve requirements, indicating this is one component of a larger, coordinated project involving demolition and replacement of dewatered solids conveyor systems, wall demolition, utility replacements, and associated improvements.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

40 23 40 - SANITARY WASTEWATER PROCESS PIPING

Herbert, Rowland & Grubic, Inc. 40 23 40 - 1 011139.0465

SECTION 40 23 40 - SANITARY WASTEWATER PROCESS PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pipes and tubes for conveying sanitary wastewater.

2. Valves for conveying sanitary wastewater.

B. Related Requirements:

1. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping: Pipe penetrations, restrained joints, flexible connections, expansion joints and loops, and sleeve-type couplings.

2. Section 40 05 07 - Hangers and Supports for Process Piping: Supports, hangers, anchors, and guides.

3. Section 40 05 51 - Common Requirements for Process Valves: Common product requirements for valves for placement by this Section.

4. Section 40 05 62 - Plug Valves: Valves and accessories.

5. Section 40 05 65.23 - Swing Check Valves: Valves and accessories.

1.2 REFERENCE STANDARDS

A. American Welding Society:

1. AWS D1.1/D1.1M - Structural Welding Code - Steel.

B. ASME International:

1. ASME A13.1 - Scheme for the Identification of Piping Systems.

2. ASME B31.3 - Process Piping Design.

C. ASTM International:

1. ASTM A780/A780M - Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings.

D. SSPC: Society for Protective Coatings:

1. SSPC-Paint 20 - Zinc-Rich Coating (Type I - Inorganic and Type II - Organic).

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data:

1. Piping: Submit manufacturer information on pipe materials, fittings, and accessories.

2. Hangers and Supports: Submit manufacturer catalog information, including load capacity.

Herbert, Rowland & Grubic, Inc. 40 23 40 - 2 011139.0465

3. System Components: Submit manufacturer catalog information including capacity, component sizes, rough-in requirements, and service sizes.

4. Valves: Submit manufacturer information for actuators with model number and size indicated.

C. Shop Drawings:

1. Piping:

a. Indicate piping system schematic with general assembly of components and mounting and installation details.

b. Submit list of wording, symbols, letter size, and color-coding for pipe identification; comply with ASME A13.1.

2. Submit layout drawings showing piece numbers and location.

3. Valves: Submit assembly drawings indicating parts list, materials, sizes, position indicators, limit switches, control system, actuator mounting, wiring diagrams, and control system schematics.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Welder Certificates: Certify welders and welding procedures employed on Work, verifying AWS qualification within previous 12 months.

F. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.

G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

H. Qualifications Statements:

1. Welders: Qualify procedures and personnel according to AWS D1.1/D1.1M.

1.4 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of piping and valves.

C. Operation and Maintenance Data: Submit assembly views and replacement part numbers and availability.

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience.

Herbert, Rowland & Grubic, Inc. 40 23 40 - 3 011139.0465

1.6 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

1.7 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

1.8 WARRANTY

A. Section 01 78 36 - Warranty Requirements: Requirements for warranties.

PART 2 - PRODUCTS

2.1 PIPING AND VALVES FOR CONVEYING SANITARY WASTEWATER

A. Piping: Ductile iron as specified in Section 40 05 19 – Ductile Iron Process Pipe.

B. Valves:

1. Plug as specified in Section 40 05 62 - Plug Valves.

2. Swing check as specified in Section 40 05 65.23 - Swing Check Valves.

C. Valve Service:

1. Shutoff, Drain, and Isolation:

a. As indicated on Drawings.

2. Bypass: As indicated on Drawings.

2.2 PIPE HANGERS AND SUPPORTS

A. As specified in Section 40 05 07 - Hangers and Supports for Process Piping.

Herbert, Rowland & Grubic, Inc. 40 23 40 - 4 011139.0465

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that field dimensions are as indicated on Shop Drawings.

3.2 PREPARATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.

B. Protect materials and equipment from damage and intrusion of water and other materials.

3.3 INSTALLATION

A. As indicated on Shop Drawings, according to manufacturer instructions, and ASME B31.3.

B. Use minimum number of joints.

C. Field Fabrication of Fittings: According to manufacturer instructions.

D. Flexible Couplings:

1. Location: At connections to equipment and where indicated on Shop Drawings.

2. As specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping.

E. Couplings and Anchors: According to manufacturer instructions.

F. Local Indicators:

1. Install direct-reading indicator devices such as thermometers as indicated on Drawings and according to manufacturer instructions.

2. Location: Capable of being read from floor level and accessible for maintenance.

G. Orientate valves to permit operation and maintenance access to valve operator and to avoid interferences with other equipment.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Inspection:

1. Inspect for damage to pipe lining or coating and for other defects that may be detrimental as determined by Engineer.

2. Repair damaged piping, or provide new, undamaged pipe.

3. After installation, inspect for proper supports and interferences.

Herbert, Rowland & Grubic, Inc. 40 23 40 - 5 011139.0465

C. Pressure Testing:

1. As indicated on pipe schedule.

D. Equipment Acceptance: Adjust, repair, modify, or replace components failing to perform as specified and rerun tests.

E. Damaged Coatings:

1. Repair damaged coatings with material equal to original coating.

3.5 ADJUSTING

A. Section 01 73 00 - Execution Requirements: Requirements for starting and adjusting.

B. Field-calibrate local indicators at time of piping installation.

3.6 CLEANING

A. Section 01 73 00 - Execution Requirements: Requirements for cleaning.

B. Keep piping and valve interiors clean as installation progresses.

3.7 DEMONSTRATION

A. Section 01 73 00 - Execution Requirements: Requirements for demonstration and training.

B. Demonstrate valve operation, routine maintenance, and emergency repair procedures to Owner's personnel.

END OF SECTION

PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Pipes and tubes for conveying sanitary wastewater.
2. Valves for conveying sanitary wastewater.
B. Related Requirements:
1. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping: Pipe penetrations, restrained joints, flexible connections, expansion joints and loops, and sleeve-type couplings.
2. Section 40 05 07 - Hangers and Supports for Process Piping: Supports, hangers, anchors, and guides.
3. Section 40 05 51 - Common Requirements for Process Valves: Common product requirements for valves for placement by this Section.
4. Section 40 05 62 - Plug Valves: Valves and accessories.
5. Section 40 05 65.23 - Swing Check Valves: Valves and accessories.
1.2 REFERENCE STANDARDS
A. American Welding Society:
1. AWS D1.1/D1.1M - Structural Welding Code - Steel.
B. ASME International:
1. ASME A13.1 - Scheme for the Identification of Piping Systems.
2. ASME B31.3 - Process Piping Design.
C. ASTM International:
1. ASTM A780/A780M - Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings.
D. SSPC: Society for Protective Coatings:
1. SSPC-Paint 20 - Zinc-Rich Coating (Type I - Inorganic and Type II - Organic).
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data:
1. Piping: Submit manufacturer information on pipe materials, fittings, and accessories.
2. Hangers and Supports: Submit manufacturer catalog information, including load capacity.
3. System Components: Submit manufacturer catalog information including capacity, component sizes, rough-in requirements, and service sizes.
4. Valves: Submit manufacturer information for actuators with model number and size indicated.
C. Shop Drawings:
1. Piping:
a. Indicate piping system schematic with general assembly of components and mounting and installation details.
b. Submit list of wording, symbols, letter size, and color-coding for pipe identification; comply with ASME A13.1.
2. Submit layout drawings showing piece numbers and location.
3. Valves: Submit assembly drawings indicating parts list, materials, sizes, position indicators, limit switches, control system, actuator mounting, wiring diagrams, and control system schematics.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Welder Certificates: Certify welders and welding procedures employed on Work, verifying AWS qualification within previous 12 months.
F. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.
G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
H. Qualifications Statements:
1. Welders: Qualify procedures and personnel according to AWS D1.1/D1.1M.
1.4 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record actual locations of piping and valves.
C. Operation and Maintenance Data: Submit assembly views and replacement part numbers and availability.
1.5 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
1.7 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
2. Indicate field measurements on Shop Drawings.
1.8 WARRANTY
A. Section 01 78 36 - Warranty Requirements: Requirements for warranties.
PART 2 - PRODUCTS
2.1 PIPING AND VALVES FOR CONVEYING SANITARY WASTEWATER
A. Piping: Ductile iron as specified in Section 40 05 19 – Ductile Iron Process Pipe.
B. Valves:
1. Plug as specified in Section 40 05 62 - Plug Valves.
2. Swing check as specified in Section 40 05 65.23 - Swing Check Valves.
C. Valve Service:
1. Shutoff, Drain, and Isolation:
a. As indicated on Drawings.

2. Bypass: As indicated on Drawings.

2.2 PIPE HANGERS AND SUPPORTS
A. As specified in Section 40 05 07 - Hangers and Supports for Process Piping.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify that field dimensions are as indicated on Shop Drawings.
3.2 PREPARATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.
B. Protect materials and equipment from damage and intrusion of water and other materials.
3.3 INSTALLATION
A. As indicated on Shop Drawings, according to manufacturer instructions, and ASME B31.3.
B. Use minimum number of joints.
C. Field Fabrication of Fittings: According to manufacturer instructions.
D. Flexible Couplings:
1. Location: At connections to equipment and where indicated on Shop Drawings.
2. As specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping.
E. Couplings and Anchors: According to manufacturer instructions.
F. Local Indicators:
1. Install direct-reading indicator devices such as thermometers as indicated on Drawings and according to manufacturer instructions.
2. Location: Capable of being read from floor level and accessible for maintenance.

G. Orientate valves to permit operation and maintenance access to valve operator and to avoid interferences with other equipment.

3.4 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
B. Inspection:
1. Inspect for damage to pipe lining or coating and for other defects that may be detrimental as determined by Engineer.
2. Repair damaged piping, or provide new, undamaged pipe.
3. After installation, inspect for proper supports and interferences.
C. Pressure Testing:
1. As indicated on pipe schedule.
D. Equipment Acceptance: Adjust, repair, modify, or replace components failing to perform as specified and rerun tests.
E. Damaged Coatings:
1. Repair damaged coatings with material equal to original coating.
3.5 ADJUSTING
A. Section 01 73 00 - Execution Requirements: Requirements for starting and adjusting.
B. Field-calibrate local indicators at time of piping installation.
3.6 CLEANING
A. Section 01 73 00 - Execution Requirements: Requirements for cleaning.
B. Keep piping and valve interiors clean as installation progresses.
3.7 DEMONSTRATION
A. Section 01 73 00 - Execution Requirements: Requirements for demonstration and training.
B. Demonstrate valve operation, routine maintenance, and emergency repair procedures to Owner's personnel.