40 05 19 - Ductile Iron Process Pipe.pdf
PDF 261 KB Posted
- Attached to
- Biosolids Project 011139.0465
- Solicitation number
- US.260443
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a specification document for ductile iron process pipe prepared by Herbert, Rowland & Grubic, Inc. for the Biosolids Project 011139.0465 in Ephrata Borough, Pennsylvania. The document specifies materials, products, and installation requirements for ductile iron pipe and fittings to be used in the project, which involves the coordination and interconnection of two new biodryers, demolition and replacement of dewatered solids conveyor systems, wall demolition and replacement, indoor utility replacements, site piping replacement and relocation, a dumpster loading canopy, and electrical improvements. The specification requires Class 53 ductile iron pipe with a 250 psig pressure rating, ductile iron fittings compliant with AWWA standards, ceramic epoxy lining for sewage conveyance applications, and 316 stainless steel bolts and nuts. Materials must comply with AWWA C115, C150, and C151 standards for piping and AWWA C153 for compact fittings. Buried service piping requires asphaltic coating at 0.04 inch thickness. Bids for the project are due December 8, 2026 at 10:00 AM through PennBid, with a pre-bid open house scheduled for November 18, 2026 from 8:00 AM to 10:00 AM. The project is divided into two separate bid contracts: Contract No. EBA26-2 for General Construction and Contract No. EBA26-3 for Electrical Construction.
The specification establishes quality assurance requirements including manufacturer certification, shop inspection and testing, field quality control, and pressure testing according to Section 33 05 05.31 Hydrostatic Testing. Contractors must submit product data, shop drawings with critical dimensions and materials lists, manufacturer's certificates, and source and field quality-control submittals. Installation must follow ASME B31.3 standards for exposed service piping and include proper surface preparation using commercial sand blasting to SSPC SP 6 standards. Materials must be stored off ground in clean, dry locations protected from moisture and dust. Pipe interiors must be kept clean during installation and cleaned of soil, grit, and debris after installation. The specification includes laying tolerances of 1/8 inch in 10 feet and requires dielectric fittings between dissimilar metals. Gaskets must be suitable for sewage applications, and ceramic epoxy lining must be applied with 40 mils nominal dry film thickness to all pipe and fittings conveying raw sewage, screened sewage, and sludge.
View the file
Other files
Show 40 more
Latest 50 of 125 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40 05 19 - DUCTILE IRON PROCESS PIPE
Herbert, Rowland & Grubic, Inc. 40 05 19 - 1 011139.0465
SECTION 40 05 19 - DUCTILE IRON PROCESS PIPE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Ductile-iron pipe.
2. Ductile-iron, malleable-iron, and cast-iron fittings.
3. Accessories.
B. Related Requirements:
1. Section 09 90 00 - Painting and Coating: Product and execution requirements for painting specified by this Section.
2. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping: Piping appurtenances.
3. Section 40 05 07 - Hangers and Supports for Process Piping: Hangers, anchors, sleeves, and sealing of piping to adjacent structures.
4. Section 40 05 51 - Common Requirements for Process Valves: Common product requirements for valves for placement by this Section.
1.2 REFERENCE STANDARDS
A. American Water Works Association:
1. AWWA C104 - Cement-Mortar Lining for Ductile-Iron Pipe and Fittings.
2. AWWA C105 - Polyethylene Encasement for Ductile-Iron Pipe Systems.
3. AWWA C110 - Ductile-Iron and Gray-Iron Fittings.
4. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings.
5. AWWA C115 - Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded
Flanges.
6. AWWA C150 - Thickness Design of Ductile-Iron Pipe.
7. AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast.
8. AWWA C153 - Ductile-Iron Compact Fittings.
B. ASME International:
1. ASME B16.1 - Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and
250.
2. ASME B31.3 - Process Piping.
C. ASTM International:
1. ASTM A48/A48M - Standard Specification for Gray Iron Castings.
D. NSF International:
1. NSF 61 - Drinking Water System Components - Health Effects.
2. NSF 372 - Drinking Water System Components - Lead Content.
E. Society for Protective Coatings:
1. SSPC SP 6 - Commercial Blast Cleaning.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 2 011139.0465
1.3 COORDINATION
A. Section 01 31 13 – Project Coordination: Requirements for coordination.
B. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings.
1.4 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer information regarding pipe and fittings.
C. Shop Drawings: Indicate layout of piping systems, including equipment, critical dimensions, sizes, and materials lists.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Source Quality-Control Submittals: Indicate results of shop or factory tests and inspections.
F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
1.5 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and centerline elevations.
C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.6 QUALITY ASSURANCE
A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 3 011139.0465
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Protect piping and appurtenances by storing off ground.
3. Provide additional protection according to manufacturer instructions.
1.8 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
2. Indicate field measurements on Shop Drawings.
PART 2 - PRODUCTS
2.1 DUCTILE IRON PIPE AND FITTINGS
A. Piping:
1. Comply with AWWA C115, C150, and C151.
2. Class: 53.
3. Pressure Rating: 250 psig.
B. Fittings:
1. Material: AWWA C153, ductile iron.
2. Pressure Rating: Same as that of connected piping.
3. Mechanical Joints:
a. Comply with AWWA C110 and AWWA C111.
b. Glands: Ductile iron with asphaltic coating.
c. Push-on Joints: Comply with AWWA C111.
4. Restrained Joints: Comply with AWWA C111.
5. Flanged Fittings: Comply with AWWA C110/ASME B16.1.
C. Ceramic Epoxy Lining
1. Apply to all ductile iron pipe and fittings conveying raw sewage, screened sewage, and sludge.
2. Amine cured novalac epoxy containing ceramic quartz pigment.
3. Thickness: 40 mils nominal dry film thickness.
D. Cement-Mortar Lining:
1. Comply with AWWA C104.
2. Thickness: Standard.
E. Outside Coating:
1. Buried Service:
a. Type: Asphaltic.
b. Thickness: 0.04 inch.
2. Exposed Service: As specified in Section 09 90 00 - Painting and Coating.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 4 011139.0465
2.2 ACCESSORIES
A. Gaskets: Suitable for use with sewage.
B. Bolts and Nuts: 316 stainless steel.
2.3 SOURCE QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.
B. Provide shop inspection and testing of completed assembly.
C. Certificate of Compliance:
1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify that field dimensions are as indicated on Shop Drawings.
C. Inspect existing flanges for nonstandard bolt hole configurations or design, and verify that new pipe and flange mate properly.
3.2 PREPARATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.
B. Thoroughly clean pipe and fittings before installation.
C. Surface Preparation:
1. Clean surfaces to remove loose rust, mill scale, and other foreign substances by power wire brushing or commercial sand blasting; SSPC SP 6.
2. Touch up shop-primed surfaces with primer as specified in Section 09 90 00 -
Painting and Coating.
3. Solvent-clean surfaces that are not shop primed.
3.3 INSTALLATION
A. Buried Service Piping: As specified in Section 33 31 23 – Sanitary Sewerage Force Main Piping.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 5 011139.0465
B. Exposed Service Piping:
1. According to ASME B31.3.
2. Run piping straight along alignment as indicated on Drawings, with minimum number of joints.
C. Fittings:
1. According to manufacturer instructions.
2. Clean gasket seats thoroughly, and wipe gaskets clean prior to installation.
3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions.
4. Provide required upstream and downstream clearances from devices as indicated on Drawings.
D. Make taps to ductile iron piping only with service saddle, tapping boss of a fitting or valve body, or equipment casting.
E. Install piping with sufficient slopes for venting or draining liquids and condensate to low points.
F. Support exposed piping as specified in Section 40 05 07 - Hangers and Supports for Process Piping.
G. Provide expansion joints as specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping, and pipe guides as specified in Section 40 05 07 - Hangers and Supports for Process Piping, to compensate for pipe expansion due to temperature differences.
H. Dielectric Fittings: Provide between dissimilar metals.
I. Field Cuts: According to pipe manufacturer instructions.
J. Finish primed surfaces according to Section 09 90 00 - Painting and Coating.
3.4 TOLERANCES
A. Section 01 40 00 - Quality Requirements: Requirements for tolerances.
B. Laying Tolerance: ¼ inch in 10 feet.
3.5 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
B. Inspection:
1. Inspect for damage to pipe lining or coating and for other defects that may be detrimental as determined by Architect/Engineer.
2. Repair damaged piping or provide new, undamaged pipe.
3. After installation, inspect for proper supports and interferences.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 6 011139.0465
C. Pressure Testing:
1. According to Section 33 05 05.31 Hydrostatic Testing.
3.6 CLEANING
A. Section 01 73 00 - Execution Requirements specifies requirements for cleaning.
B. Keep pipe interior clean as installation progresses.
C. After installation, clean pipe interior of soil, grit, and other debris.
END OF SECTION
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Ductile-iron pipe. |
| 2. Ductile-iron, malleable-iron, and cast-iron fittings. |
| 3. Accessories. |
| B. Related Requirements: |
| 1. Section 09 90 00 - Painting and Coating: Product and execution requirements for painting specified by this Section. |
| 2. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping: Piping appurtenances. |
| 3. Section 40 05 07 - Hangers and Supports for Process Piping: Hangers, anchors, sleeves, and sealing of piping to adjacent structures. |
| 4. Section 40 05 51 - Common Requirements for Process Valves: Common product requirements for valves for placement by this Section. |
| 1.2 REFERENCE STANDARDS |
| A. American Water Works Association: |
| 1. AWWA C104 - Cement-Mortar Lining for Ductile-Iron Pipe and Fittings. |
| 2. AWWA C105 - Polyethylene Encasement for Ductile-Iron Pipe Systems. |
| 3. AWWA C110 - Ductile-Iron and Gray-Iron Fittings. |
| 4. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. |
| 5. AWWA C115 - Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded Flanges. |
| 6. AWWA C150 - Thickness Design of Ductile-Iron Pipe. |
| 7. AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast. |
| 8. AWWA C153 - Ductile-Iron Compact Fittings. |
| B. ASME International: |
| 1. ASME B16.1 - Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and 250. |
| 2. ASME B31.3 - Process Piping. |
| C. ASTM International: |
| 1. ASTM A48/A48M - Standard Specification for Gray Iron Castings. |
| D. NSF International: |
| 1. NSF 61 - Drinking Water System Components - Health Effects. |
| 2. NSF 372 - Drinking Water System Components - Lead Content. |
| E. Society for Protective Coatings: |
| 1. SSPC SP 6 - Commercial Blast Cleaning. |
| 1.3 COORDINATION |
| A. Section 01 31 13 – Project Coordination: Requirements for coordination. |
| B. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings. |
| 1.4 SUBMITTALS |
| A. Section 01 33 00 - Submittal Procedures: Requirements for submittals. |
| B. Product Data: Submit manufacturer information regarding pipe and fittings. |
| C. Shop Drawings: Indicate layout of piping systems, including equipment, critical dimensions, sizes, and materials lists. |
| D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. |
| E. Source Quality-Control Submittals: Indicate results of shop or factory tests and inspections. |
| F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. |
| 1.5 CLOSEOUT SUBMITTALS |
| A. Section 01 77 00 - Closeout Requirements: Requirements for submittals. |
| B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and centerline elevations. |
| C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities. |
| 1.6 QUALITY ASSURANCE |
| A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards. |
| 1.7 DELIVERY, STORAGE, AND HANDLING |
| A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products. |
| B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage. |
| C. Store materials according to manufacturer instructions. |
| D. Protection: |
| 1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas. |
| 2. Protect piping and appurtenances by storing off ground. |
| 3. Provide additional protection according to manufacturer instructions. |
| 1.8 EXISTING CONDITIONS |
| A. Field Measurements: |
| 1. Verify field measurements prior to fabrication. |
| 2. Indicate field measurements on Shop Drawings. |
| PART 2 - PRODUCTS |
| 2.1 DUCTILE IRON PIPE AND FITTINGS |
| A. Piping: |
| 1. Comply with AWWA C115, C150, and C151. |
| 2. Class: 53. |
| 3. Pressure Rating: 250 psig. |
| B. Fittings: |
| 1. Material: AWWA C153, ductile iron. |
| 2. Pressure Rating: Same as that of connected piping. |
| 3. Mechanical Joints: |
| a. Comply with AWWA C110 and AWWA C111. |
| b. Glands: Ductile iron with asphaltic coating. |
| c. Push-on Joints: Comply with AWWA C111. |
| 4. Restrained Joints: Comply with AWWA C111. |
| 5. Flanged Fittings: Comply with AWWA C110/ASME B16.1. |
| C. Ceramic Epoxy Lining |
| 1. Apply to all ductile iron pipe and fittings conveying raw sewage, screened sewage, and sludge. |
| 2. Amine cured novalac epoxy containing ceramic quartz pigment. |
| 3. Thickness: 40 mils nominal dry film thickness. |
| D. Cement-Mortar Lining: |
| 1. Comply with AWWA C104. |
| 2. Thickness: Standard. |
| E. Outside Coating: |
| 1. Buried Service: |
| a. Type: Asphaltic. |
| b. Thickness: 0.04 inch. |
2. Exposed Service: As specified in Section 09 90 00 - Painting and Coating.
| 2.2 ACCESSORIES |
| A. Gaskets: Suitable for use with sewage. |
| B. Bolts and Nuts: 316 stainless steel. |
| 2.3 SOURCE QUALITY CONTROL |
| A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis. |
| B. Provide shop inspection and testing of completed assembly. |
| C. Certificate of Compliance: |
| 1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents. |
| 2. Specified shop tests are not required for Work performed by approved manufacturer. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Section 01 73 00 - Execution Requirements: Requirements for installation examination. |
| B. Verify that field dimensions are as indicated on Shop Drawings. |
| C. Inspect existing flanges for nonstandard bolt hole configurations or design, and verify that new pipe and flange mate properly. |
| 3.2 PREPARATION |
| A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation. |
| B. Thoroughly clean pipe and fittings before installation. |
| C. Surface Preparation: |
| 1. Clean surfaces to remove loose rust, mill scale, and other foreign substances by power wire brushing or commercial sand blasting; SSPC SP 6. |
| 2. Touch up shop-primed surfaces with primer as specified in Section 09 90 00 - Painting and Coating. |
| 3. Solvent-clean surfaces that are not shop primed. |
| 3.3 INSTALLATION |
| A. Buried Service Piping: As specified in Section 33 31 23 – Sanitary Sewerage Force Main Piping. |
| B. Exposed Service Piping: |
| 1. According to ASME B31.3. |
| 2. Run piping straight along alignment as indicated on Drawings, with minimum number of joints. |
| C. Fittings: |
| 1. According to manufacturer instructions. |
| 2. Clean gasket seats thoroughly, and wipe gaskets clean prior to installation. |
| 3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions. |
| 4. Provide required upstream and downstream clearances from devices as indicated on Drawings. |
| D. Make taps to ductile iron piping only with service saddle, tapping boss of a fitting or valve body, or equipment casting. |
| E. Install piping with sufficient slopes for venting or draining liquids and condensate to low points. |
| F. Support exposed piping as specified in Section 40 05 07 - Hangers and Supports for Process Piping. |
| G. Provide expansion joints as specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping, and pipe guides as specified in Section 40 05 07 - Hangers and Supports for Process Piping, to compensate for pipe expansion due to te... |
| H. Dielectric Fittings: Provide between dissimilar metals. |
| I. Field Cuts: According to pipe manufacturer instructions. |
| J. Finish primed surfaces according to Section 09 90 00 - Painting and Coating. |
| 3.4 TOLERANCES |
| A. Section 01 40 00 - Quality Requirements: Requirements for tolerances. |
| B. Laying Tolerance: ¼ inch in 10 feet. |
| 3.5 FIELD QUALITY CONTROL |
| A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing. |
| B. Inspection: |
| 1. Inspect for damage to pipe lining or coating and for other defects that may be detrimental as determined by Architect/Engineer. |
| 2. Repair damaged piping or provide new, undamaged pipe. |
| 3. After installation, inspect for proper supports and interferences. |
| C. Pressure Testing: |
| 1. According to Section 33 05 05.31 Hydrostatic Testing. |
| 3.6 CLEANING |
| A. Section 01 73 00 - Execution Requirements specifies requirements for cleaning. |
| B. Keep pipe interior clean as installation progresses. |
| C. After installation, clean pipe interior of soil, grit, and other debris. |
File details come from the government source that posted it. Updated .