This is a technical specification document for grouting work associated with the Biosolids Project 011139.0465 being undertaken by Ephrata Borough Authority in Pennsylvania. The specification details two primary grouting products: Portland cement grout and nonshrink cementitious grout, along with comprehensive requirements for their materials, mixing, installation, and quality control. The document references related concrete forming and cast-in-place concrete sections and establishes compliance requirements with American Concrete Institute standards (ACI 301) and ASTM International specifications (C33, C40, C150, C307, C531, C579, and C827). Bidding for the overall project, which includes general construction (Contract No. EBA26-2) and electrical construction (Contract No. EBA26-3), closes on December 8, 2026 at 10:00 AM through PennBid. A pre-bid open house is scheduled for November 18, 2026 from 8:00 AM to 10:00 AM. The project encompasses biodryer coordination and interconnection, conveyor system replacement, wall demolition and replacement, utility replacements, site piping work, a dumpster loading canopy, and associated electrical improvements.

The grouting specification requires Portland cement compliant with ASTM C150 Type I and II, washed natural sand meeting ASTM C33 gradation, and potable water free of impurities. Nonshrink cementitious grout must be pre-mixed, ready-for-use formulations meeting minimum compressive strength requirements of 4,000 psi at one day, 7,000 psi at seven days, and 10,000 psi at 28 days, with testing performed according to ASTM C1107. The document specifies ambient temperature conditions, prohibiting grouting when temperatures exceed 90 degrees Fahrenheit and requiring minimum 40-degree Fahrenheit conditions throughout installation and curing. Manufacturers must demonstrate minimum three years of documented experience. Contractors are required to submit product data, manufacturer certificates, mixing and handling instructions, and field quality control test results. Curing requirements mandate prevention of rapid water loss during the first 48 hours using membrane curing compound or wet burlap methods, with grout kept damp for a minimum of three days after initial set. No additional information regarding pricing, set-asides, incumbents, or funding sources is provided in this technical specification document.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03 60 00 --GROUTING

Herbert, Rowland & Grubic, Inc. 03 60 00 - 1 011139.0465

SECTION 03 60 00 - GROUTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Portland cement grout.

2. Nonshrink cementitious grout.

B. Related Requirements:

1. Section 03 10 00 - Concrete Forming and Accessories: Form materials, waterstops, and accessories as required to form cast-in-place concrete and maintain structural integrity until stripping.

2. Section 03 30 00 - Cast-in-Place Concrete: Cast-in-place or in-situ concrete for structural building frames, slabs on fill or grade, and other concrete components.

1.2 REFERENCE STANDARDS

A. American Concrete Institute:

1. ACI 301 - Specifications for Concrete Construction.

B. ASTM International:

1. ASTM C33 - Standard Specification for Concrete Aggregates.

2. ASTM C40 - Standard Test Method for Organic Impurities in Fine Aggregates for

Concrete.

3. ASTM C150 - Standard Specification for Portland Cement.

4. ASTM C307 - Standard Test Method for Tensile Strength of Chemical-Resistant

Mortar, Grouts, and Monolithic Surfacings.

5. ASTM C531 - Standard Test Method for Linear Shrinkage and Coefficient of

Thermal Expansion of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes.

6. ASTM C579 - Standard Test Methods for Compressive Strength of Chemical- Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes.

7. ASTM C827 - Standard Test Method for Change in Height at Early Ages of Cylindrical Specimens of Cementitious Mixtures.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer information regarding grout.

C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

D. Manufacturer Instructions: Submit instructions for mixing, handling, surface preparation, and placing grouts.

Herbert, Rowland & Grubic, Inc. 03 60 00 - 2 011139.0465

E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

1.4 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

1.6 AMBIENT CONDITIONS

A. Section 01 50 00 - Temporary Facilities and Controls: Requirements for ambient condition control facilities for product storage and installation.

B. Maximum Conditions: Do not perform grouting if temperatures exceed 90 degrees F.

C. Minimum Conditions: Maintain minimum temperature of 40 degrees F before, during, and after grouting, until grout has set.

PART 2 - PRODUCTS

2.1 PORTLAND CEMENT GROUT

A. Portland Cement: Comply with ASTM C150, Type I and II.

B. Water:

1. Potable.

2. No impurities, suspended particles, algae, or dissolved natural salts in quantities capable of causing:

a. Corrosion of steel.

b. Volume change increasing shrinkage cracking.

c. Efflorescence.

d. Excess air entraining.

C. Fine Aggregate:

Herbert, Rowland & Grubic, Inc. 03 60 00 - 3 011139.0465

1. Washed natural sand.

2. Gradation:

a. Comply with ASTM C33.

b. Represented by smooth granulometric curve within required limits.

3. Free from injurious amounts of organic impurities according to ASTM C40.

D. Mix:

1. Portland cement, sand, and water.

2. Do not use ferrous aggregate or staining ingredients in grout mixes.

2.2 NONSHRINK CEMENTITIOUS GROUT

A. Description:

1. Pre-mixed and ready-for-use formulation requiring only addition of water.

2. Nonshrink, non-corrosive, nonmetallic, non-gas forming, and no chlorides.

B. Performance and Design Criteria:

1. Certified to maintain initial placement volume or expand after set, and to meet following minimum properties when tested according to ASTM C1107 for nonshrink grout:

a. Setting Time:

1) Comply with ASTM C1107.

b. Maximum Expansion:

1) Comply with ASTM C1107.

c. Compressive Strength:

1) One-Day: 4,000 psi.

2) Seven-Day: 7,000 psi.

3) 28-Day: 10,000 psi.

4) Comply with ASTM C1107.

2.3 FORMWORK

A. As specified in Section 03 10 00 - Concrete Forming and Accessories.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify areas to receive grout.

3.2 PREPARATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.

B. Remove defective concrete, laitance, dirt, oil, grease, and other foreign material from concrete surfaces by brushing, hammering, chipping, or other similar means until sound and clean concrete surface is achieved.

Herbert, Rowland & Grubic, Inc. 03 60 00 - 4 011139.0465

C. Roughen concrete lightly, but not to interfere with placement of grout.

D. Remove foreign materials from metal surfaces in contact with grout.

E. Align, level, and maintain final positioning of components to be grouted.

F. Saturate concrete surfaces with clean water, and then remove excess water.

3.3 INSTALLATION

A. Formwork:

1. Construct leakproof forms anchored and shored to withstand grout pressures.

2. Install formwork with clearances to permit proper placement of grout.

3. As specified in Section 03 10 00 - Concrete Forming and Accessories.

B. Mixing:

1. Portland Cement Grout:

a. Use proportions of two parts sand and one part cement, measured by volume.

b. Prepare grout with water to obtain consistency to permit placing and packing.

c. Mix water and grout in two steps:

1) Premix using approximately 2/3 of water.

2) After partial mixing, add remaining water to bring mix to desired placement consistency and continue mixing two to three minutes.

d. Mix only quantities of grout capable of being placed within 30 minutes after mixing.

e. Do not add additional water after grout has been mixed.

2. Nonshrink Cementitious Grout:

a. Mix and prepare according to manufacturer instructions.

3. Mix grout components in proximity to Work area and transport mixture quickly and in manner not permitting segregation of materials.

C. Placing of Grout:

1. Place grout material quickly and continuously.

2. Do not use pneumatic-pressure or dry-packing methods.

3. Apply grout from one side only to avoid entrapping air.

4. Do not vibrate placed grout mixture or permit placement if area is being vibrated by nearby equipment.

5. Thoroughly compact final installation and eliminate air pockets.

6. Do not remove leveling shims for at least 48 hours after grout has been placed unless otherwise recommended by manufacturer.

D. Curing:

1. Prevent rapid loss of water from grout during first 48 hours by use of approved membrane curing compound or by using wet burlap method.

2. Immediately after placement, protect grout from premature drying, excessively hot or cold temperatures, and mechanical injury.

Herbert, Rowland & Grubic, Inc. 03 60 00 - 5 011139.0465

3. After grout has attained its initial set, keep damp for minimum three days.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Inspection and Testing:

1. Comply with ACI 301 and as specified in Section 014000 - Quality Requirements.

2. Submit proposed mix designs for field-mixed cement grout and product data for proprietary nonshrink grout products.

3. Tests of grout components may be performed to ensure compliance with specified requirements.

END OF SECTION

PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Portland cement grout.
2. Nonshrink cementitious grout.
B. Related Requirements:
1. Section 03 10 00 - Concrete Forming and Accessories: Form materials, waterstops, and accessories as required to form cast-in-place concrete and maintain structural integrity until stripping.
2. Section 03 30 00 - Cast-in-Place Concrete: Cast-in-place or in-situ concrete for structural building frames, slabs on fill or grade, and other concrete components.
1.2 REFERENCE STANDARDS
A. American Concrete Institute:
1. ACI 301 - Specifications for Concrete Construction.
B. ASTM International:
1. ASTM C33 - Standard Specification for Concrete Aggregates.
2. ASTM C40 - Standard Test Method for Organic Impurities in Fine Aggregates for Concrete.
3. ASTM C150 - Standard Specification for Portland Cement.
4. ASTM C307 - Standard Test Method for Tensile Strength of Chemical-Resistant Mortar, Grouts, and Monolithic Surfacings.
5. ASTM C531 - Standard Test Method for Linear Shrinkage and Coefficient of Thermal Expansion of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes.
6. ASTM C579 - Standard Test Methods for Compressive Strength of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes.
7. ASTM C827 - Standard Test Method for Change in Height at Early Ages of Cylindrical Specimens of Cementitious Mixtures.
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer information regarding grout.
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
D. Manufacturer Instructions: Submit instructions for mixing, handling, surface preparation, and placing grouts.
E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
1.4 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
1.6 AMBIENT CONDITIONS
A. Section 01 50 00 - Temporary Facilities and Controls: Requirements for ambient condition control facilities for product storage and installation.
B. Maximum Conditions: Do not perform grouting if temperatures exceed 90 degrees F.
C. Minimum Conditions: Maintain minimum temperature of 40 degrees F before, during, and after grouting, until grout has set.
PART 2 - PRODUCTS
2.1 PORTLAND CEMENT GROUT
A. Portland Cement: Comply with ASTM C150, Type I and II.
B. Water:
1. Potable.
2. No impurities, suspended particles, algae, or dissolved natural salts in quantities capable of causing:
a. Corrosion of steel.
b. Volume change increasing shrinkage cracking.
c. Efflorescence.
d. Excess air entraining.
C. Fine Aggregate:
1. Washed natural sand.
2. Gradation:
a. Comply with ASTM C33.
b. Represented by smooth granulometric curve within required limits.

3. Free from injurious amounts of organic impurities according to ASTM C40.

D. Mix:
1. Portland cement, sand, and water.
2. Do not use ferrous aggregate or staining ingredients in grout mixes.
2.2 NONSHRINK CEMENTITIOUS GROUT
A. Description:
1. Pre-mixed and ready-for-use formulation requiring only addition of water.
2. Nonshrink, non-corrosive, nonmetallic, non-gas forming, and no chlorides.
B. Performance and Design Criteria:
1. Certified to maintain initial placement volume or expand after set, and to meet following minimum properties when tested according to ASTM C1107 for nonshrink grout:
a. Setting Time:
1) Comply with ASTM C1107.
b. Maximum Expansion:
1) Comply with ASTM C1107.
c. Compressive Strength:
1) One-Day: 4,000 psi.
2) Seven-Day: 7,000 psi.
3) 28-Day: 10,000 psi.
4) Comply with ASTM C1107.
2.3 FORMWORK
A. As specified in Section 03 10 00 - Concrete Forming and Accessories.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify areas to receive grout.
3.2 PREPARATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.
B. Remove defective concrete, laitance, dirt, oil, grease, and other foreign material from concrete surfaces by brushing, hammering, chipping, or other similar means until sound and clean concrete surface is achieved.
C. Roughen concrete lightly, but not to interfere with placement of grout.
D. Remove foreign materials from metal surfaces in contact with grout.
E. Align, level, and maintain final positioning of components to be grouted.
F. Saturate concrete surfaces with clean water, and then remove excess water.
3.3 INSTALLATION
A. Formwork:
1. Construct leakproof forms anchored and shored to withstand grout pressures.
2. Install formwork with clearances to permit proper placement of grout.
3. As specified in Section 03 10 00 - Concrete Forming and Accessories.
B. Mixing:
1. Portland Cement Grout:
a. Use proportions of two parts sand and one part cement, measured by volume.
b. Prepare grout with water to obtain consistency to permit placing and packing.
c. Mix water and grout in two steps:
1) Premix using approximately 2/3 of water.
2) After partial mixing, add remaining water to bring mix to desired placement consistency and continue mixing two to three minutes.
d. Mix only quantities of grout capable of being placed within 30 minutes after mixing.
e. Do not add additional water after grout has been mixed.
2. Nonshrink Cementitious Grout:
a. Mix and prepare according to manufacturer instructions.

3. Mix grout components in proximity to Work area and transport mixture quickly and in manner not permitting segregation of materials.

C. Placing of Grout:
1. Place grout material quickly and continuously.
2. Do not use pneumatic-pressure or dry-packing methods.
3. Apply grout from one side only to avoid entrapping air.
4. Do not vibrate placed grout mixture or permit placement if area is being vibrated by nearby equipment.
5. Thoroughly compact final installation and eliminate air pockets.
6. Do not remove leveling shims for at least 48 hours after grout has been placed unless otherwise recommended by manufacturer.
D. Curing:
1. Prevent rapid loss of water from grout during first 48 hours by use of approved membrane curing compound or by using wet burlap method.
2. Immediately after placement, protect grout from premature drying, excessively hot or cold temperatures, and mechanical injury.
3. After grout has attained its initial set, keep damp for minimum three days.
3.4 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
B. Inspection and Testing:
1. Comply with ACI 301 and as specified in Section 014000 - Quality Requirements.
2. Submit proposed mix designs for field-mixed cement grout and product data for proprietary nonshrink grout products.
3. Tests of grout components may be performed to ensure compliance with specified requirements.

File details come from the government source that posted it. Updated .