00 65 19.19 - Consent of Surety to Final Payment.pdf

PDF 227 KB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This is a Consent of Surety to Final Payment form issued by Herbert, Rowland & Grubic, Inc. for the Ephrata Borough Authority in Pennsylvania. The form documents the surety's approval of final payment to the contractor for the Biosolids Project 011139.0465 located at 124 S. State Street, Ephrata, PA 17522. The surety, after careful examination of the contractor's books and records or receipt of an affidavit, certifies that all claims for labor, materials, and equipment have been satisfactorily settled and approves the release of final construction cost invoices to the contractor.

The form confirms that approval of final payment does not relieve the surety of any obligations to the owner as outlined in the surety's bonds. The document requires execution by an authorized representative of the surety company, with the note that if signed by anyone other than the President or Vice President, a certificate of authority must accompany the form. This consent form is a standard requirement in the construction project closeout process to ensure all subcontractor and supplier claims have been resolved before final payment is released.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 65 19.19 - 1 011139.0465

CONSENT OF SURETY TO FINAL PAYMENT

To Owner: Ephrata Borough Authority Contractor:

Address: 124 S. State Street Contract No.:

Ephrata, PA 17522 Contract Name:

Project: Contract Date:

In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the

SURETY:

Address:

, Surety, as surety on the bond of

CONTRACTOR:

Address:

, Contractor, after a careful examination of the books and records of said Contractor or after receipt of an affidavit from the said of said Contractor or after receipt of an affidavit from the said Contractor, which examination or affidavit satisfied this

Surety Company that all claims for labor, materials, and equipment have been satisfactorily settled, hereby approves of the final payment to the said Contractor and by these presents witnesseth that the payment to the Contractor of the final construction cost invoices shall not relieve the Surety of any of its obligations to the Owner set forth in said Surety’s

Bonds.

IN WITNESS WHEREOF the said Surety Company has hereunto set its hand and seal this day of

Attested: (Surety)

(SEAL) (Signature of Authorized Representative)

(Printed Name and Title)

NOTE: This statement, if executed by any person other than the President or Vice President of the Surety Company, must be accompanied by a certificate of same date showing authority conferred upon the person so signing to execute such instruments on behalf of the Surety Company represented.

File details come from the government source that posted it. Updated .