00 63 25 - Substitution Request Form (During Construction).pdf

PDF 381 KB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This document is a Substitution Request Form for use during the construction phase of the Biosolids Improvements Project (HRG Project No. 011139.0465) managed by Ephrata Borough Authority in Pennsylvania, covering both General Construction (Contract No. EBA26-2) and Electrical Construction (Contract No. EBA26-3). The form serves as the official mechanism for contractors to propose alternative materials, equipment, or products that differ from those specified in the original contract documents. Contractors must complete detailed sections documenting the proposed substitution's manufacturer, model number, installer information, and product history, along with point-by-point comparative data demonstrating equivalence or superiority to the specified item. The form requires documentation of similar installations, cost savings if applicable, and impact assessments on other trades, contract time, and project scheduling.

The substitution request process includes mandatory certifications from the contractor attesting that the proposed product has been fully investigated, maintains equivalent warranty and maintenance service availability, presents no adverse effects to other trades, and includes all necessary cost data. The engineer retains authority to approve the substitution as submitted, approve with conditions, or reject the request, with decisions documented on the form. Approved substitutions require subsequent submittals in compliance with Specification Section 01 33 00. Supporting documentation such as drawings, product data, samples, tests, and reports must accompany requests. The contractor bears responsibility for all coordination, installation, and work modifications necessitated by any accepted substitution, with claims for additional costs related to subsequently apparent issues waived by acceptance of the substitution.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBSTITUTION REQUEST

(After Bidding Phase)

Project:

Biosolids Improvements Project Contract No. EBA26-2 – General Construction Contract No. EBA26-3 – Electrical Construction Sub. Req. No.:

Contractor: Contract:

To: Date:

From: HRG Project No.: 011139.0465

Re:

Specification Section

Paragraph Drawing Detail

Description:

Proposed Substitution:

Manufacturer: Address: Phone:

Trade Name: Model No.:

Installer: Address: Phone:

History: New Product 2-5 years old 5-10 years old More than 10 years old

Difference between specified product and proposed product:

Point-by-point comparative data attached [REQUIRED]

Reason for not providing specified item:

Similar Installation(s):

Project: Engineer:

Address: Owner:

Date

Installed:

Proposed substitution affects other parts of Work: No Yes, Explain:

Savings to Owner for accepting substitution: ($

Proposed substitution changes Contract Time: No Yes [Add] [Deduct]: days

Supporting Data Attached: Drawings Product Data Samples Tests Reports

SUBSTITUTION REQUEST

(Continued)

The Undersigned certifies:

− Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

− Same warranty will be furnished for proposed substitution as for specified product.

− Same maintenance service and source of replacement parts, as applicable, is available.

− Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

− Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.

− Proposed substitution does not affect dimensions and functional clearances.

− Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

− Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.

Submitted by:

Signed by:

Firm:

Address:

Telephone: e-mail:

Attachments:

Substitution approved - Make submittals in accordance with Specification Section 01 33 00.

Substitution approved as noted - Make submittals in accordance with Specification Section 01 33 00.

Substitution rejected - Use specified materials.

Substitution Request received too late - Use specified materials.

Signed by: Date: