00 01 07 - Seal Page.pdf

PDF 1 MB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This is a Design Professionals of Record seal page for the Biosolids Project 011139.0465 in Ephrata, Pennsylvania, submitted by Herbert, Rowland & Grubic, Inc. The document identifies four licensed professional engineers responsible for design oversight across various project divisions and drawings. Benjamin Burns, PE (PE093397), serves as Civil Engineer overseeing Divisions 09-46 and associated civil drawings related to design calculations, equipment sizing, and site design. Brenden Miller, PE (PE099572), is designated as Civil Engineer for Division 01 with responsibility for civil drawings, equipment layout, process interconnections, and site design. Vincent Rissler, PE (PE056164), is the Structural Engineer overseeing Divisions 02-05 and all structural drawings. Matthew Moore, PE (PE074935), serves as Electrical Engineer for Division 26, Sections 40 95 13, and all electrical drawings. All professional seals and signatures are dated November 5, 2026.

The related contract opportunity is for construction of a biosolids processing facility project managed by Ephrata Borough Authority. The project scope includes coordination and interconnection of two owner-procured biodryers, demolition and replacement of dewatered solids conveyor systems, selective wall demolition and replacement, indoor utility replacements, site piping replacement and relocation, installation of a dumpster loading canopy, and associated electrical improvements. Separate bids are requested for Contract No. EBA26-2 (General Construction) and Contract No. EBA26-3 (Electrical Construction). Bidding documents are available through PennBid at https://pennbid.bonfirehub.com/ with a bid deadline of December 8, 2026 at 10:00 AM local time. A pre-bid open house is scheduled for November 18, 2026 from 8:00 AM to 10:00 AM for facility inspection.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 01 07 - 1 011139.0465

DESIGN PROFESSIONALS OF RECORD Seal & Signature

CIVIL ENGINEER

The following Sections:

The following Drawings:

Areas of Design Responsibility :

Benjamin Burns, PE

PE093397

Divisions 09 - 46 Sections except where indicated as prepared by other design professionals of record All Drawings except where indicated as prepared by other design professionals of record.

Review of design calculations, equipment sizing, preparation of Civil Drawings, and other items except where indicated as prepared by other design professionals.

CIVIL ENGINEER

Areas of Design Responsibility:

Brenden Miller, PE

PE099572

Division 01.

All Drawings except where indicated as prepared by other design professionals of record.

Preparation of Civil Drawings, layout of equipment, process interconnections, and site design.

STRUCTURAL ENGINEER

Vincent Rissler, PE

PE056164

Divisions 02-05.

All S Drawings

ELECTRICAL ENGINEER

Matthew Moore, PE

PE074935

Division 26, Sections 40 95 13

All E Drawings

11/05/2026

11/05/2026

11/05/26