00 01 10 - Table of Contents.pdf
PDF 320 KB Posted
- Attached to
- Biosolids Project 011139.0465
- Solicitation number
- US.260443
- Issued by
- Lancaster County, Pennsylvania
About this file
This file is a table of contents for a Biosolids Project construction contract issued by Ephrata Borough Authority in Pennsylvania. The project encompasses two separate bid contracts: Contract No. EBA26-2 for General Construction and Contract No. EBA26-3 for Electrical Construction. The work scope includes coordination and interconnection of two new owner-procured biodryers, demolition and replacement of dewatered solids conveyor systems, selective wall demolition and replacement, indoor utility replacements, site piping replacement and relocation, construction of a dumpster loading canopy, and associated electrical improvements. Bids are due December 8, 2026 at 10:00 AM local time through PennBid, with public bid opening following submission. A pre-bid open house is scheduled for November 18, 2026 from 8:00 AM to 10:00 AM to allow bidders to view the facility. Bidding documents are available through the designated PennBid website, with all official notifications and addenda distributed exclusively through this platform.
The table of contents details comprehensive specifications organized by construction divisions, including General Requirements, Existing Conditions, Concrete, Metals, Finishes, Electrical Systems, Earthwork, Exterior Improvements, Utilities, Process Integration, and Material Processing Equipment. The document structure indicates standard procurement and contracting requirements applicable to public works projects in Pennsylvania, including provisions for bid bonds, performance bonds, payment bonds, non-collusion affidavits, employment verification, and equal employment opportunity compliance. Specific technical sections address electrical systems, control panels, variable frequency drives, process piping systems, and biosolids equipment integration, reflecting the specialized industrial nature of the wastewater treatment facility upgrades.
View the file
Other files
Show 40 more
Latest 50 of 125 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Herbert, Rowland & Grubic, Inc. 00 01 10 - 1 011139.0465
BIOSOLIDS PROJECT
CONTRACT NO. EBA26-2 – GENERAL CONSTRUCTION
CONTRACT NO. EBA26-3 – ELECTRICAL CONSTRUCTION
EPHRATA BOROUGH AUTHORITY
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION: PAGES
SEALS PAGE ....................................................................................................................................... 00 01 07: 1
Procurement Requirements ADVERTISEMENT FOR BIDS ............................................................................................................... 00 11 13: 2 INSTRUCTIONS TO BIDDERS .............................................................................................................. 00 21 13: 11 AVAILABLE PROJECT INFORMATION ................................................................................................. 00 31 00: 130 PERMITS ............................................................................................................................................ 00 31 46: 1 BID BOND .......................................................................................................................................... 00 43 13: 2 NON-COLLUSION AFFIDAVIT ............................................................................................................. 00 45 19: 1
CERTIFICATION OF NON-SEGREGATED FACILITIES AND NON-EMPLOYMENT OF ILLEGAL
ALIEN LABOR ................................................................................................................................ 00 45 33: 1 EEO CERTIFICATE .............................................................................................................................. 00 45 36: 1 PUBLIC WORKS EMPLOYMENT VERIFICATION FORM ....................................................................... 00 45 46: 1
Contracting Requirements AGREEMENT BETWEEN OWNER and CONTRACTOR for CONSTRUCTION CONTRACT: GENERAL .... 00 52 00a: 7 AGREEMENT BETWEEN OWNER and CONTRACTOR for CONSTRUCTION CONTRACT: ELECTRICAL . 00 52 00b: 7 NOTICE TO PROCEED ........................................................................................................................ 00 55 00: 1 PROJECT FORMS ............................................................................................................................... 00 60 00: 1 PERFORMANCE BOND ...................................................................................................................... 00 61 13.13: 4 PAYMENT BOND ............................................................................................................................... 00 61 13.16: 4 CONTRACTORS APPLICATION FOR PAYMENT ................................................................................... 00 62 76: 4 REQUEST FOR INFORMATION FORM ................................................................................................ 00 63 13: 1 SUBSTITUTION REQUEST FORM ........................................................................................................ 00 63 25: 2 FIELD ORDER FORM .......................................................................................................................... 00 63 36: 1 WORK CHANGE DIRECTIVE FORM .................................................................................................... 00 63 49: 1 CHANGE ORDER FORM ..................................................................................................................... 00 63 63: 1 CERTIFICATE OF SUBSTANTIAL COMPLETION FORM ........................................................................ 00 65 16: 1 AFFIDAVIT OF RELEASE OF LIENS FORM ........................................................................................... 00 65 19.16: 1 CONSENT OF SURETY FOR FINAL PAYMENT FORM .......................................................................... 00 65 19.19: 1 NOTICE OF ACCEPTABILITY OF WORK ............................................................................................... 00 65 19.23: 1 GENERAL CONDITIONS ...................................................................................................................... 00 72 00: 94 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.................................................................... 00 73 36: 4 WAGE RATE REQUIREMENTS ............................................................................................................ 00 73 43: 4 WAGE DETERMINATION SCHEDULE ................................................................................................. 00 73 46: 7 ANTI-POLLUTION MEASURES ............................................................................................................ 00 73 53: 1 STATUTORY REQUIREMENTS ............................................................................................................ 00 73 73: 8
Specifications
DIVISION 01 – GENERAL REQUIREMENTS PAGES
01 10 00 PROJECT SUMMARY
01 12 00 MULTIPLE CONTRACT SUMMARY
01 12 16 WORK SEQUENCE
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 26 13 REQUESTS FOR INTERPRETATION
01 29 00 PAYMENT PROCEDURES
01 31 13 PROJECT COORDINATION
01 31 19 PROJECT MEETINGS
TABLE OF CONTENTS
Herbert, Rowland & Grubic, Inc. 00 01 10 - 2 011139.0465
01 32 16 CONSTRUCTION PROGRESS SCHEULE
01 32 26 CONSTRUCTION PROGRESS REPORTING
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 57 28 TEMPORARY FLOW CONTROL
01 61 00 PRODUCT REQUIREMENTS
01 64 00 OWNER FURNISHED PRODUCTS
01 73 00 EXECUTION REQUIREMENTS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 77 00 CLOSEOUT PROCEDURES
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 36 WARRANTIES
01 78 39 PROJECT RECORD DOCUMENTS
01 78 44 SPARE PARTS AND MAINTENANCE MATERIALS
01 91 13 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS PAGES
02 41 19.13 SELECTIVE BUILDING DEMOLITION
DIVISION 03 – CONCRETE PAGES
03 10 00 CONCRETE FORMING AND ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 35 00 CONCRETE FINISHING
03 39 00 CONCRETE CURING
03 60 00 GROUTING
DIVISION 05 – METALS PAGES
05 12 00 STRUCTURAL STEEL FRAMING
05 31 23 STEEL ROOF DECKING
05 50 00 METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
05 53 00 METAL GRATINGS
DIVISION 09 – FINISHES PAGES
09 90 00 PAINTING AND COATING
DIVISION 26 – ELECTRICAL PAGES
26 05 00 ELECTRICAL GENERAL
26 05 10 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19 CONDUCTORS
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY
26 05 53 ELECTRICAL SYSTEM IDENTIFICATION
26 05 73 POWER SYSTEM STUDY AND TESTING
26 08 00 ELECTRICAL FIELD ACCEPTANCE TESTS
26 09 16 AUXILIARY CONTROLS & RELAYS
26 24 19 MOTOR CONTROL CENTERS
26 27 16 CONTROL PANELS AND ENCLOSURES
26 28 16.13 OVERCURRENT PROTECTIVE DEVICES
26 28 16.16 DISCONNECT AND SAFETY SWITCHES
Herbert, Rowland & Grubic, Inc. 00 01 10 - 3 011139.0465
26 29 13 CONTACTORS AND MOTOR STARTING EQUIPMENT
26 29 23 VARIABLE FREQUENCY DRIVES
DIVISION 31 – EARTHWORK PAGES
31 05 13 SOILS FOR EARTHWORK
31 05 16 AGGREGATES FOR EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK
31 22 13 ROUGH GRADING
31 23 16.13 TRENCHING
31 23 16.26 ROCK REMOVAL
31 23 19 DEWATERING
31 23 23 FILL
31 23 33 TRENCHING AND BACKFILLING FOR UTILITIES
31 25 00 EROSION AND SEDIMENTATION CONTROLS
DIVISION 32 – EXTERIOR IMPROVEMENTS PAGES
32 91 13 SOIL PREPARATION
32 91 19 LANDSCAPE GRADING
32 92 19 SEEDING
DIVISION 33 – UTILITIES PAGES
33 05 05.31 HYDROSTATIC TESTING
33 05 09.33 THRUST RESTRAINT FOR UTILITY PIPING
33 31 23 SANITARY SEWERAGE FORCE MAIN PIPING
DIVISION 40 – PROCESS INTEGRATION PAGES
40 05 06 COUPLINGS, ADAPTERS, AND SPECIALS FOR PROCESS PIPING
40 05 07 HANGERS AND SUPPORTS FOR PROCESS PIPING .............................................................................. X
40 05 19 DUCTILE IRON PROCESS PIPE
40 05 23 STAINLESS STEEL PROCESS PIPE AND TUBING
40 05 31 THERMOPLASTIC PROCESS PIPE
40 05 36 FIBERGLASS-REINFORCED PLASTIC Process Pipe
40 05 51 COMMON REQUIREMENTS FOR PROCESS VALVES
40 05 53 IDENTIFICATION FOR PROCESS PIPING
40 05 62 PLUG VALVES
40 05 63 BALL VALVES
40 05 65.23 SWING CHECK VALVES
40 23 19 NON-POTABLE PLANT WATER PROCESS PIPING
40 23 40 SANITARY WASTEWATER PROCESS PIPING
40 42 13 PROCESS PIPING INSULATION
40 95 13 PROCESS CONTROL PANELS AND HARDWARE
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT PAGES
41 12 13.36 SCREW BULK MATERIAL CONVEYORS
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT PAGES
46 05 53 IDENTIFICATION FOR WATER AND WASTEWATER EQUIPMENT
DRAWINGS 44
File details come from the government source that posted it. Updated .