This is a technical specification document (Section 32 91 19 - Landscape Grading) prepared by Herbert, Rowland & Grubic, Inc. for the Biosolids Project 011139.0465 managed by Ephrata Borough Authority in Pennsylvania. The specification details final grading and topsoil placement requirements for finish landscaping as part of a larger biosolids facility project. The work includes substrate preparation, topsoil placement to a nominal depth of 4 inches in seeding areas, fine grading to maintain specified profiles and contours, and temporary surfacing provisions when weather conditions prevent permanent surface placement. Key execution requirements mandate verification of existing conditions before work begins, removal of debris and stones exceeding 1/4 inch, scarification of surfaces to 3 inches depth where topsoil is scheduled, manual spreading of topsoil near utilities and structures to prevent damage, and light compaction of placed topsoil. Tolerances for the top of topsoil are specified at plus or minus 1/2 inch. The contractor must submit the name of imported materials sources and manufacturer's certificates confirming products meet specified requirements, with all topsoil materials sourced from a single supplier throughout the work.
The specification establishes contractor responsibility for maintenance and protection of temporary surfacing, with permanent surfacing required within thirty days of temporary placement or as soon as environmental conditions allow. Prior to final surfacing placement, the contractor and Authority Representative must inspect all restoration areas, with the contractor bearing responsibility for any necessary material replacement, regrading, or additional material placement deemed unacceptable by the Authority Representative or Engineer. The contractor must also manage grade adjustments for utilities, manholes, frames, covers, and other facilities before final surfacing, and remove and dispose of temporary surfacing to achieve the specified grades for final sub-base, base, and surface layers. Construction traffic over topsoil is prohibited to protect the installed work. The specification references related sections covering soils for exterior improvements, trenching and backfilling for utilities, and seeding for finish ground cover.
View the file
Other files
Show 40 more
Latest 50 of 125 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32 91 19 - LANDSCAPE GRADING
Herbert, Rowland & Grubic, Inc. 32 91 19 - 1 011139.0465
SECTION 32 91 19 - LANDSCAPE GRADING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Final grade topsoil for finish landscaping.
B. Related Sections:
1. Section 31 05 13 - Soils for Exterior Improvements.
2. Section 31 23 33 – Trenching and Backfilling for Utilities: Backfilling trenches.
3. Section 32 92 19 - Seeding: Finish ground cover.
1.2 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Submittal procedures.
B. Materials Source: Submit name of imported materials source.
C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
1.3 QUALITY ASSURANCE
A. Furnish each topsoil material from single source throughout the Work.
PART 2 - PRODUCTS
2.1 MATERIAL
A. Topsoil: As specified in Section 31 05 13 – Soils for Earthwork.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.
B. Verify building and trench backfilling have been inspected.
C. Verify substrate base has been contoured and compacted.
3.2 TEMPORARY SURFACING:
A. In the event the permanent surfacing cannot be placed due to the weather limitations set forth herein, provide a temporary surface in lieu thereof.
Herbert, Rowland & Grubic, Inc. 32 91 19 - 2 011139.0465
B. The Contractor shall be responsible for the maintenance and protection of all temporary surfacing until such time as that the permanent pavement or surface can be placed.
Permanent surfacing must be placed no later than thirty days following the placement of temporary surfacing. In the event that environmental conditions do not allow for placement of permanent surfacing within the thirty days specified, permanent surfacing must be placed as soon as conditions allow.
C. Prior to placement of final surfacing, the Contractor and Authority Representative shall inspect all areas to be restored. The Contractor shall be responsible for any replacement of material, regarding, or addition of material deemed necessary by the Authority Representative or Engineer in any areas found to be unacceptable for receipt of final surfacing.
D. Contractor shall be responsible for the removal and disposal of the temporary surfacing to the grade required for the placement of the final sub-base, base, and surface at the specified depths.
E. The Contractor shall be responsible for any necessary adjustments to grade for manholes, frame and covers, and other facilities or structures prior to final surfacing.
F. Temporary surfacing shall be placed where directed by the Authority Representative or Engineer.
3.3 PREPARATION
A. Protect landscaping and other features remaining as final Work.
B. Protect existing structures, fences, sidewalks, utilities, paving, and curbs.
3.4 SUBSTRATE PREPARATION
A. Eliminate uneven areas and low spots.
B. Remove debris, roots, branches, stones, in excess of 1/4 inch in size. Remove contaminated subsoil.
C. Scarify surface to depth of 3 inches where topsoil is scheduled. Scarify in areas where equipment used for hauling and spreading topsoil has compacted subsoil.
3.5 PLACING TOPSOIL
A. Place topsoil in areas where seeding is required to nominal depth of 4 inches. Place topsoil during dry weather.
B. Fine grade topsoil to eliminate rough or low areas. Maintain profiles and contour of subgrade.
C. Remove roots, weeds, rocks, and foreign material while spreading.
Herbert, Rowland & Grubic, Inc. 32 91 19 - 3 011139.0465
D. Manually spread topsoil close to utilities, building, and pavement to prevent damage.
E. Lightly compact placed topsoil.
F. Remove surplus subsoil and topsoil from site.
3.6 TOLERANCES
A. Section 01 40 00 - Quality Requirements: Tolerances.
B. Top of Topsoil: Plus or minus 1/2 inch.
3.7 PROTECTION OF INSTALLED WORK
A. Section 01 73 00 - Execution Requirements: Requirements for protecting finished Work.
B. Prohibit construction traffic over topsoil.
END OF SECTION
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Final grade topsoil for finish landscaping. |
| B. Related Sections: |
| 1. Section 31 05 13 - Soils for Exterior Improvements. |
| 2. Section 31 23 33 – Trenching and Backfilling for Utilities: Backfilling trenches. |
| 3. Section 32 92 19 - Seeding: Finish ground cover. |
| 1.2 SUBMITTALS |
| A. Section 01 33 00 - Submittal Procedures: Submittal procedures. |
| B. Materials Source: Submit name of imported materials source. |
| C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements. |
| 1.3 QUALITY ASSURANCE |
| A. Furnish each topsoil material from single source throughout the Work. |
| PART 2 - PRODUCTS |
| 2.1 MATERIAL |
| A. Topsoil: As specified in Section 31 05 13 – Soils for Earthwork. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work. |
| B. Verify building and trench backfilling have been inspected. |
| C. Verify substrate base has been contoured and compacted. |
| 3.2 TEMPORARY SURFACING: |
| A. In the event the permanent surfacing cannot be placed due to the weather limitations set forth herein, provide a temporary surface in lieu thereof. |
| B. The Contractor shall be responsible for the maintenance and protection of all temporary surfacing until such time as that the permanent pavement or surface can be placed. Permanent surfacing must be placed no later than thirty days following the pl... |
| C. Prior to placement of final surfacing, the Contractor and Authority Representative shall inspect all areas to be restored. The Contractor shall be responsible for any replacement of material, regarding, or addition of material deemed necessary by t... |
| D. Contractor shall be responsible for the removal and disposal of the temporary surfacing to the grade required for the placement of the final sub-base, base, and surface at the specified depths. |
| E. The Contractor shall be responsible for any necessary adjustments to grade for manholes, frame and covers, and other facilities or structures prior to final surfacing. |
| F. Temporary surfacing shall be placed where directed by the Authority Representative or Engineer. |
| 3.3 PREPARATION |
| A. Protect landscaping and other features remaining as final Work. |
| B. Protect existing structures, fences, sidewalks, utilities, paving, and curbs. |
| 3.4 SUBSTRATE PREPARATION |
| A. Eliminate uneven areas and low spots. |
| B. Remove debris, roots, branches, stones, in excess of 1/4 inch in size. Remove contaminated subsoil. |
| C. Scarify surface to depth of 3 inches where topsoil is scheduled. Scarify in areas where equipment used for hauling and spreading topsoil has compacted subsoil. |
| 3.5 PLACING TOPSOIL |
| A. Place topsoil in areas where seeding is required to nominal depth of 4 inches. Place topsoil during dry weather. |
| B. Fine grade topsoil to eliminate rough or low areas. Maintain profiles and contour of subgrade. |
| C. Remove roots, weeds, rocks, and foreign material while spreading. |
| D. Manually spread topsoil close to utilities, building, and pavement to prevent damage. |
| E. Lightly compact placed topsoil. |
| F. Remove surplus subsoil and topsoil from site. |
| 3.6 TOLERANCES |
| A. Section 01 40 00 - Quality Requirements: Tolerances. |
| B. Top of Topsoil: Plus or minus 1/2 inch. |
| 3.7 PROTECTION OF INSTALLED WORK |
| A. Section 01 73 00 - Execution Requirements: Requirements for protecting finished Work. |
| B. Prohibit construction traffic over topsoil. |