32 92 19 - Seeding.pdf

PDF 249 KB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This is a technical specification document for Section 32 92 19 - Seeding, prepared by Herbert, Rowland & Grubic, Inc. for the Biosolids Project 011139.0465 at Ephrata Borough Authority in Pennsylvania. The specification details the requirements for seeding work, including fertilizing, hydroseeding, mulching, and maintenance activities. The project encompasses two seed mixture types: permanent seed consisting of Kentucky Blue Grass (50%), Red Fescue or Chewings Fescue (30%), and Perennial Rye (20%), and temporary seed of Annual Rye (100%). Seeding must occur during specified planting seasons: temporary seed between March 15 and October 15, and permanent seed between March 15 and June 1 or September 1 and October 15. The specification requires contractors to apply seed at designated rates, maintain mulch thickness of 1/8 inches, saturate soil to 4 inches depth, and establish vigorous grass growth through two cutting cycles. Bid submission is due December 8, 2026, at 10:00 AM through PennBid, with a pre-bid open house scheduled for November 18, 2026, from 8:00 AM to 10:00 AM.

The specification establishes detailed product requirements for fertilizer (10% nitrogen, 20% phosphoric acid, 20% soluble potash), lime meeting Pennsylvania Agricultural Liming Materials Act standards, and mulching material limited to oat or wheat straw free from weeds. Contractors must maintain seeded areas immediately after placement until grass is well established and exhibits vigorous growing conditions for two cuttings. Maintenance requirements include mowing at regular intervals to maintain maximum grass height of 2.5 inches, removing clippings, controlling weeds with herbicides, reseeding bare spots, repairing washouts, and protecting seeded areas with warning signs. Soil analysis testing is required to determine appropriate fertilizer and lime application rates unless recent test certificates are available for imported topsoil. All seed materials must be delivered in sealed containers with documentation showing germination percentages, purity levels, and weed content, and all accessories must meet specified quality standards.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32 92 19 - SEEDING

Herbert, Rowland & Grubic, Inc. 32 92 19 - 1 011139.0465

SECTION 32 92 19 - SEEDING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Fertilizing.

2. Seeding.

3. Hydroseeding.

4. Mulching.

5. Maintenance.

B. Related Sections:

1. Section 31 05 13 - Soils for Exterior Improvements: Topsoil material.

2. Section 31 23 33 – Trenching and Backfilling for Utilities: Rough grading over cut.

3. Section 32 91 13 - Soil Preparation.

4. Section 32 91 19 - Landscape Grading: Preparation of subsoil and placement of topsoil in preparation for the Work of this section.

1.2 REFERENCES

A. ASTM International:

1. ASTM C602 - Standard Specification for Agricultural Liming Materials.

1.3 DEFINITIONS

A. Weeds: Vegetative species other than specified species to be established in given area.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data for seed mix, fertilizer, mulch, and other accessories.

C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Procedures: Procedures for submittals.

B. Operation and Maintenance Data: Include maintenance instructions, cutting method and maximum grass height and types, application frequency, and recommended coverage of fertilizer.

1.6 QUALITY ASSURANCE

A. Provide seed mixture in containers showing percentage of seed mix, germination percentage, inert matter percentage, weed percentage, year of production, net weight, Herbert, Rowland & Grubic, Inc. 32 92 19 - 2 011139.0465 date of packaging, and location of packaging.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Product storage and handling requirements.

B. Deliver grass seed mixture in sealed containers. Seed in damaged packaging is not acceptable.

C. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer.

1.8 MAINTENANCE SERVICE

A. Section 01 73 00 - Execution Requirements: Requirements for maintenance service.

B. Maintain seeded areas immediately after placement until grass is well established and exhibits vigorous growing condition for two cuttings.

PART 2 - PRODUCTS

2.1 SEED MIXTURE

A. Permanent Seed Description:

Species % by Weight Min. % Purity Min. %

Germination Max. % Weed

Seeding Rate (lb/1000 yd2)

Kentucky Blue Grass mixture

50 97 80 0.15 21.0

Red Fesue or Chewings Fescue Grass

30 97 85 0.10 12.5

Perennial Rye mixture

20 97 90 0.15 8.5

B. Temporary Seed Description:

Species % by Weight Min. % Purity Min. %

Germination Max. % Weed

Seeding Rate (lb/1000 yd2)

Annual Rye mixture

100 95 90 0.1 10

2.2 ACCESSORIES

A. Mulching Material: Oat or wheat straw, free from weeds, foreign matter detrimental to plant life, and dry. Hay or chopped cornstalks are [not] acceptable.

B. Fertilizer: Commercial grade; recommended for grass; of proportion necessary to eliminate deficiencies of topsoil, as indicated in analysis or in absence of analysis, to the following proportions: Nitrogen 10 percent, phosphoric acid 20 percent, soluble potash 20 percent.

Herbert, Rowland & Grubic, Inc. 32 92 19 - 3 011139.0465

C. Lime: PA Agricultural Liming Materials Act of 1978, P.L. 15, No. 9, as amended agricultural limestone containing a minimum 89 percent calcium carbonate equivalent.

D. Water: Clean, fresh and free of substances or matter capable of inhibiting vigorous growth of grass.

E. Stakes: Softwood lumber, chisel pointed.

F. String: Inorganic fiber.

2.3 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Testing, inspection and analysis requirements.

B. Analyze to ascertain percentage of nitrogen, phosphorus, potash, soluble salt content, organic matter content, and pH value.

C. Provide recommendation for fertilizer and lime application rates for specified seed mix as result of testing.

D. Testing is not required when recent tests and certificates are available for imported topsoil. Submit these test results to testing laboratory. Indicate, by test results, information necessary to determine suitability.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.

B. Verify prepared soil base is ready to receive the Work of this section.

3.2 FERTILIZING

A. Apply lime at application rate recommended by soil analysis. Work lime into top 6 inches of soil.

B. Apply fertilizer at application rate recommended by soil analysis.

C. Apply after smooth raking of topsoil.

D. Do not apply fertilizer at same time or with same machine used to apply seed.

E. Mix fertilizer thoroughly into upper 2 inches of topsoil.

F. Lightly water soil to aid dissipation of fertilizer. Irrigate top level of soil uniformly.

Herbert, Rowland & Grubic, Inc. 32 92 19 - 4 011139.0465

3.3 SEEDING

A. Apply seed at rate indicated evenly in two intersecting directions. Rake in lightly.

B. Do not seed areas in excess of that which can be mulched on same day.

C. Planting Season:

1. Temporary Seed – March 15 to October 15.

2. Permanent Seed – March 15 to June 1 and September 1 to October 15.

D. Do not sow immediately following rain, when ground is too dry, or when winds are over 12 mph.

E. Roll seeded area with roller not exceeding 112 lbs/linear foot.

F. Immediately following seeding and compacting, apply mulch to thickness of 1/8 inches.

Maintain clear of shrubs and trees.

G. Apply water with fine spray immediately after each area has been mulched. Saturate to 4 inches of soil.

3.4 HYDROSEEDING

A. Apply fertilizer, mulch and seeded slurry with hydraulic seeder at rate indicated evenly in one pass.

B. After application, apply water with fine spray immediately after each area has been hydroseeded. Saturate to 4 inches of soil and maintain moisture levels two to four inches.

3.5 SEED PROTECTION

A. Lay fabric smoothly on surface, bury top end of each section in 6 inch deep excavated topsoil trench. Overlap edges and ends of adjacent rolls minimum 12 inches. Backfill trench and rake smooth, level with adjacent soil.

B. Secure outside edges and overlaps at 36 inch intervals with stakes.

C. Lightly dress slopes with topsoil to ensure close contact between fabric and soil.

D. At sides of ditches, lay fabric laps in direction of water flow. Lap ends and edges minimum 6 inches.

3.6 MAINTENANCE

A. Mow grass at regular intervals to maintain at maximum height of 2-1/2 inches. Do not cut more than 1/3 of grass blade at each mowing. Perform first mowing when seedlings are 40 percent higher than desired height.

B. Neatly trim edges and hand clip where necessary.

Herbert, Rowland & Grubic, Inc. 32 92 19 - 5 011139.0465

C. Immediately remove clippings after mowing and trimming. Do not let clippings lay in clumps.

D. Water to prevent grass and soil from drying out.

E. Roll surface to remove minor depressions or irregularities.

F. Control growth of weeds. Apply herbicides. Remedy damage resulting from improper use of herbicides.

G. Immediately reseed areas showing bare spots.

H. Repair washouts or gullies.

I. Protect seeded areas with warning signs during maintenance period.

END OF SECTION

PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Fertilizing.
2. Seeding.
3. Hydroseeding.
4. Mulching.
5. Maintenance.
B. Related Sections:
1. Section 31 05 13 - Soils for Exterior Improvements: Topsoil material.
2. Section 31 23 33 – Trenching and Backfilling for Utilities: Rough grading over cut.
3. Section 32 91 13 - Soil Preparation.
4. Section 32 91 19 - Landscape Grading: Preparation of subsoil and placement of topsoil in preparation for the Work of this section.
1.2 REFERENCES
A. ASTM International:
1. ASTM C602 - Standard Specification for Agricultural Liming Materials.
1.3 DEFINITIONS
A. Weeds: Vegetative species other than specified species to be established in given area.
1.4 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit data for seed mix, fertilizer, mulch, and other accessories.
C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
1.5 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Procedures: Procedures for submittals.
B. Operation and Maintenance Data: Include maintenance instructions, cutting method and maximum grass height and types, application frequency, and recommended coverage of fertilizer.
1.6 QUALITY ASSURANCE
A. Provide seed mixture in containers showing percentage of seed mix, germination percentage, inert matter percentage, weed percentage, year of production, net weight, date of packaging, and location of packaging.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Product storage and handling requirements.
B. Deliver grass seed mixture in sealed containers. Seed in damaged packaging is not acceptable.
C. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer.
1.8 MAINTENANCE SERVICE
A. Section 01 73 00 - Execution Requirements: Requirements for maintenance service.
B. Maintain seeded areas immediately after placement until grass is well established and exhibits vigorous growing condition for two cuttings.
PART 2 - PRODUCTS
2.1 SEED MIXTURE
A. Permanent Seed Description:
B. Temporary Seed Description:
2.2 ACCESSORIES
A. Mulching Material: Oat or wheat straw, free from weeds, foreign matter detrimental to plant life, and dry. Hay or chopped cornstalks are [not] acceptable.
B. Fertilizer: Commercial grade; recommended for grass; of proportion necessary to eliminate deficiencies of topsoil, as indicated in analysis or in absence of analysis, to the following proportions: Nitrogen 10 percent, phosphoric acid 20 percent, so...
C. Lime: PA Agricultural Liming Materials Act of 1978, P.L. 15, No. 9, as amended agricultural limestone containing a minimum 89 percent calcium carbonate equivalent.
D. Water: Clean, fresh and free of substances or matter capable of inhibiting vigorous growth of grass.
E. Stakes: Softwood lumber, chisel pointed.
F. String: Inorganic fiber.
2.3 SOURCE QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Testing, inspection and analysis requirements.
B. Analyze to ascertain percentage of nitrogen, phosphorus, potash, soluble salt content, organic matter content, and pH value.
C. Provide recommendation for fertilizer and lime application rates for specified seed mix as result of testing.
D. Testing is not required when recent tests and certificates are available for imported topsoil. Submit these test results to testing laboratory. Indicate, by test results, information necessary to determine suitability.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.
B. Verify prepared soil base is ready to receive the Work of this section.
3.2 FERTILIZING
A. Apply lime at application rate recommended by soil analysis. Work lime into top 6 inches of soil.
B. Apply fertilizer at application rate recommended by soil analysis.
C. Apply after smooth raking of topsoil.
D. Do not apply fertilizer at same time or with same machine used to apply seed.
E. Mix fertilizer thoroughly into upper 2 inches of topsoil.
F. Lightly water soil to aid dissipation of fertilizer. Irrigate top level of soil uniformly.
3.3 SEEDING
A. Apply seed at rate indicated evenly in two intersecting directions. Rake in lightly.
B. Do not seed areas in excess of that which can be mulched on same day.
C. Planting Season:
1. Temporary Seed – March 15 to October 15.
2. Permanent Seed – March 15 to June 1 and September 1 to October 15.
D. Do not sow immediately following rain, when ground is too dry, or when winds are over 12 mph.
E. Roll seeded area with roller not exceeding 112 lbs/linear foot.
F. Immediately following seeding and compacting, apply mulch to thickness of 1/8 inches. Maintain clear of shrubs and trees.
G. Apply water with fine spray immediately after each area has been mulched. Saturate to 4 inches of soil.
3.4 HYDROSEEDING
A. Apply fertilizer, mulch and seeded slurry with hydraulic seeder at rate indicated evenly in one pass.
B. After application, apply water with fine spray immediately after each area has been hydroseeded. Saturate to 4 inches of soil and maintain moisture levels two to four inches.
3.5 SEED PROTECTION
A. Lay fabric smoothly on surface, bury top end of each section in 6 inch deep excavated topsoil trench. Overlap edges and ends of adjacent rolls minimum 12 inches. Backfill trench and rake smooth, level with adjacent soil.
B. Secure outside edges and overlaps at 36 inch intervals with stakes.
C. Lightly dress slopes with topsoil to ensure close contact between fabric and soil.
D. At sides of ditches, lay fabric laps in direction of water flow. Lap ends and edges minimum 6 inches.
3.6 MAINTENANCE
A. Mow grass at regular intervals to maintain at maximum height of 2-1/2 inches. Do not cut more than 1/3 of grass blade at each mowing. Perform first mowing when seedlings are 40 percent higher than desired height.
B. Neatly trim edges and hand clip where necessary.
C. Immediately remove clippings after mowing and trimming. Do not let clippings lay in clumps.
D. Water to prevent grass and soil from drying out.
E. Roll surface to remove minor depressions or irregularities.
F. Control growth of weeds. Apply herbicides. Remedy damage resulting from improper use of herbicides.
G. Immediately reseed areas showing bare spots.
H. Repair washouts or gullies.
I. Protect seeded areas with warning signs during maintenance period.

File details come from the government source that posted it. Updated .