00 45 36 EEO Certificate.pdf

PDF 199 KB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This is an Equal Employment Opportunity (EEO) Certification of Bidder form submitted by Herbert, Rowland & Grubic, Inc. for the Biosolids Project 011139.0465 in Ephrata Borough Authority, Pennsylvania. The certification is required pursuant to Executive Order 11246 and serves as an initial part of the bid submission for this construction project. The form requires the bidder to disclose whether it has participated in previous contracts subject to the Equal Opportunity clause, whether compliance reports were required, and whether all required compliance reports, including SF-100, have been filed. The form also inquires whether the bidder has ever been or is currently being considered for sanctions due to violations of Executive Order 11246, as amended.

The Biosolids Project involves general construction and electrical construction contracts (Contract Nos. EBA26-2 and EBA26-3) with a bid submission deadline of December 8, 2026, at 10:00 AM local time through PennBid. The project scope includes coordination and interconnection of two new biodryers, demolition and replacement of dewatered solids conveyor systems, wall demolition and replacement, indoor utility replacements, site piping replacement and relocation, a dumpster loading canopy, and electrical improvements. A pre-bid open house is scheduled for November 18, 2026, from 8:00 AM to 10:00 AM, and prospective bidders are required to register with the designated website at https://pennbid.bonfirehub.com/ to access bidding documents and receive official notifications and addenda.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 45 36 - 1 011139.0465

CERTIFICATION OF BIDDER REGARDING EQUAL EMPLOYMENT OPPORTUNITY

INSTRUCTIONS

This certification is required pursuant to Executive Order 11246 (30 CFR 12319-25). The implementing rules and regulations provide that any Bidder or prospective Contractor, or any of their proposed subcontractors, shall state as an initial part of the Bid or negotiations of the Contract whether it has participated in any previous contract or subcontract subject to the Equal Opportunity clause, and, if so, whether it has filed all compliance reports due under applicable instructions.

Where the certification indicates that the Bidder has not filed a compliance report due under applicable instructions, such a Bidder shall be required to submit a compliance report within seven calendar days after Bid opening. No Contract shall be awarded unless such report is submitted.

CERTIFICATION BY BIDDER

(Name of Bidder)

(Address) (City) (State) (Zip Code)

1. Bidder has participated in a previous contract or subcontract subject to the Equal Opportunity clause.

Yes No

2. Compliance reports were required to be filed in connection with such contract or subcontract.

3. Bidder has filed all compliance reports due under applicable instructions, including SF-100.

Yes No None Required (If No, please explain in detail.)

4. Have you ever been or are you being considered for sanction due to violation of Executive

Order 11246, as amended?

Certification: The information above is true and complete to the best of my knowledge and belief.

(Name of Signer) (Title)

(Signature) (Date)

File details come from the government source that posted it. Updated .