This is a specification document for Fiberglass-Reinforced Plastic (FRP) Process Pipe prepared by Herbert, Rowland & Grubic, Inc. for the Biosolids Project 011139.0465 at Ephrata Borough Authority in Pennsylvania. The specification covers FRP pressure pipe and fittings, expansion joints, and FRP dampers for process piping applications. The project involves coordination and interconnection of two new owner-procured biodryers, demolition and replacement of dewatered solids conveyor systems, wall demolition and replacement, indoor utility replacements, site piping replacement and relocation, a dumpster loading canopy, and associated electrical improvements. Separate bids are being requested for General Construction (Contract No. EBA26-2) and Electrical Construction (Contract No. EBA26-3). A pre-bid open house is scheduled for November 18, 2026, from 8:00 AM to 10:00 AM, with bids due through PennBid on December 8, 2026, at 10:00 AM local time. The specification requires FRP pressure pipe and fittings to comply with ASTM D2310, ASTM D2992, and ASME B31.3, with Pressure Class E rating and FSK liner compliant with UL 181, Class 1. Flexible connections shall be provided by manufacturers such as General Rubber (PPI) or equal, with materials including elastomer inner tubes, exterior covers suitable for media and temperature conditions, and ductile iron retaining rings.
The specification mandates that manufacturers and installers have a minimum of three years' documented experience in their respective fields. Products must be delivered in manufacturer's original packaging compliant with ASTM D3892 and stored in clean, dry locations protected from puncture, abrasion, moisture, dust, and UV exposure. Installation must comply with ASME B31.3 with proper slope for venting and drainage, and field quality control includes a low-pressure 5 PSI air test to locate and repair leaks. Fiberglass adhesive must have a VOC content of 80 g/L or less per 40 CFR 59, Subpart D. Submittals required include manufacturer's catalog information, shop drawings with critical dimensions and materials lists, manufacturer's certificates, quality-control test results, and qualifications statements for the manufacturer, installer, and licensed professional. No specific set-asides, pricing terms, or funding sources are identified in this specification document, which serves as the technical requirements portion of the bidding documents available through the PennBid designated website.
View the file
Other files
Show 40 more
Latest 50 of 125 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40 05 36 - FIBERGLASS-REINFORCED PLASTIC PROCESS PIPE
Herbert, Rowland & Grubic, Inc. 40 05 36 - 1 011139.0465
SECTION 40 05 36 - FIBERGLASS-REINFORCED PLASTIC PROCESS PIPE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Fiberglass-reinforced (thermosetting) plastic pipe and fittings. Section also includes expansion joints and FRP damps.
B. Related Requirements:
1. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping: Pipe penetrations, restrained joints, flexible connections, expansion joints and loops, and sleeve-type couplings.
2. Section 40 05 07 - Hangers and Supports for Process Piping: Hangers, anchors, sleeves, and sealing of piping to adjacent structures.
3. Section 40 05 51 - Common Requirements for Process Valves: Common product requirements for valves for placement by this Section.
1.2 DEFINITIONS
A. Fiberglass-Reinforced (Thermosetting) Plastic (FRP) Pipe: Piping that contains glass-fiber reinforcement embedded in cured thermosetting resin. The glass-fiber reinforcement within the material system provides the mechanical strength and the thermosetting resin cures to an irreversible hard matrix designed to be compatible with the fluid medium.
1.3 REFERENCE STANDARDS
A. American Water Works Association:
1. AWWA C950 - Fiberglass Pressure Pipe.
B. ASME International:
1. ASME B31.3 - Process Piping.
C. ASTM International:
1. ASTM A193/A193M - Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications.
2. ASTM A194/A194M - Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both.
3. ASTM D2310 - Standard Classification for Machine-Made "Fiberglass" (Glass- Fiber-Reinforced Thermosetting-Resin) Pipe.
4. ASTM D2992 - Standard Practice for Obtaining Hydrostatic or Pressure Design Basis for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe and Fittings.
Herbert, Rowland & Grubic, Inc. 40 05 36 - 2 011139.0465
5. ASTM D3754 - Standard Specification for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Sewer and Industrial Pressure Pipe.
6. ASTM D3892 - Standard Practice for Packaging/Packing of Plastics.
7. ASTM D4024 - Standard Specification for Machine Made "Fiberglass" (Glass-Fiber- Reinforced Thermosetting Resin) Flanges.
8. ASTM D4161 - Standard Specification for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe Joints Using Flexible Elastomeric Seals.
9. ASTM D5421 - Standard Specification for Contact Molded "Fiberglass" (Glass- Fiber-Reinforced Thermosetting-Resin) Flanges.
10. ASTM D5685 - Standard Specification for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pressure Pipe Fittings.
11. ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe.
1.4 COORDINATION
A. Section 01 31 13 – Project Coordination: Requirements for coordination.
B. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings.
1.5 PREINSTALLATION MEETINGS
A. Section 01 31 19 – Project Meetings: Requirements for preinstallation meeting.
B. Convene minimum one week prior to commencing Work of this Section.
1.6 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer's catalog information regarding pipe and fittings.
C. Shop Drawings: Indicate layout of piping systems, including equipment, critical dimensions, sizes, and materials lists.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Source Quality-Control Submittals: Indicate results of shop or factory tests and inspections.
F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
G. Qualifications Statements:
1. Submit qualifications for manufacturer, installer, and licensed professional.
2. Submit manufacturer's approval of installer.
Herbert, Rowland & Grubic, Inc. 40 05 36 - 3 011139.0465
1.7 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and centerline elevations.
C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.8 QUALITY ASSURANCE
A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards.
1.9 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience.
1.10 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection:
1. Accept materials on Site in manufacturer's original packaging and inspect for damage.
2. Manufacturer's Packaging: Comply with ASTM D3892.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from puncture, abrasion, moisture, dust, and UV by storing in clean, dry location remote from construction operations areas.
2. Protect piping and appurtenances by storing off ground.
3. Provide additional protection according to manufacturer instructions.
1.11 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
2. Indicate field measurements on Shop Drawings.
Herbert, Rowland & Grubic, Inc. 40 05 36 - 4 011139.0465
PART 2 - PRODUCTS
2.1 FRP PIPE
A. FRP Pressure Pipe and Fittings:
1. Materials:
a. Comply with ASTM D2996.
b. Type: 1.
c. Grade: 2.
d. Liner: FSK liner rated by an NRTL to comply with UL 181, Class 1.
2. Pressure Rating:
a. Pressure Class: E.
b. Comply with ASTM D2310 and D2992.
3. Round Fittings: Compression or spray-up/contact, molded of same material, pressure class, and joining method as duct
4. Rectangular Fittings - Minimum 0.125-inch thick flat sheet with fiberglass roving and resin-reinforced joints and seams.
5. Joints: Butt, ASTM D3754 or Flanged, ASTM D4024.
B. Joining Materials
1. Roving and polyester resin.
2. Fiberglass adhesive shall have a VOC content of 80 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
C. Fabrication:
1. Fabricate joints, seams, transitions, reinforcement, elbows, branch connections, and access doors and panels according to SMACNA's "Thermoset FRP Duct Construction Manual," Chapter 7, "Requirements."
2. Fabricate 90-degree rectangular mitered elbows to include turning vanes, 90-degree round elbows with a minimum of three segments for 12 inches and smaller and a minimum of five segments for 14 inches and larger.
2.2 FRP DAMPERS
A. Size and location: As indicated on Drawings.
B. Description
1. Dampers shall be suitable for temperature and chemical composition of air. Body and blade shall be constructed of a fiberglass reinforced plastic (FRP) material compatible with the piping system.
C. Materials
1. Body: FRP.
2. Blade: FRP.
3. Shaft, external hardware, and attaching hardware: Shall be 316 SS.
4. Seal to be EPDM, PTFE, or compatible material with service air.
Herbert, Rowland & Grubic, Inc. 40 05 36 - 5 011139.0465
D. Manual operating handles.
2.3 FLEXIBLE CONNECTIONS
A. Manufacturers: General Rubber (PPI), or equal.
B. Description: Rubber expansion joints to relieve thermal stress or axial movements in FRP piping system. Flanged Connection.
C. Materials:
1. Inner tube minimum ¼” thick elastomer compatible for media and temperature.
2. Exterior cover shall be minimum 1/16” thickness compatible for media and temperature.
3. Provide external cover as recommended by manufacturers for outside installations (weather and UV protection).
4. Ductile iron retaining rings a minimum of 3/8” thickness.
2.4 SOURCE QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.
B. Provide shop inspection and testing of completed pipe sections.
C. Certificate of Compliance:
1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify that field dimensions are as indicated on Shop Drawings.
C. Inspect existing flanges for nonstandard bolt hole configurations or design, and verify that new pipe and flange mate properly.
3.2 PREPARATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.
B. Thoroughly clean pipe and fittings before installation.
Herbert, Rowland & Grubic, Inc. 40 05 36 - 6 011139.0465
C. Cleaning: Clean surfaces to remove foreign substances.
3.3 INSTALLATION
A. Comply with ASME B31.3.
B. Run piping straight along alignment as indicated on Shop Drawings, with minimum number of joints.
C. Fittings:
1. According to manufacturer instructions.
2. Gaskets:
a. Clean seats thoroughly.
b. Wipe gaskets clean prior to installation.
3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions.
D. Provide required upstream and downstream clearances from devices as indicated.
E. Install piping with sufficient slopes for venting or drainage of liquids and condensate to low points.
F. Support exposed piping as specified in Section 40 05 07 - Hangers and Supports for Process Piping. And as shown on Contract Drawings.
G. Provide expansion joints as specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping, and provide pipe guides as specified in Section 40 05 07 - Hangers and Supports for Process Piping, to compensate for pipe expansion due to temperature differences.
H. Field Cuts: According to pipe manufacturer instructions.
3.4 TOLERANCES
A. Section 01 40 00 - Quality Requirements: Requirements for tolerances.
3.5 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
B. Inspection:
1. Inspect for piping defects that may be detrimental as determined by the Architect/Engineer.
2. Complete a low pressure 5 PSI air test to locate leaks if any, repair leaks.
3. Repair damaged piping, or provide new, undamaged pipe.
4. After installation, inspect for proper supports and interferences.
Herbert, Rowland & Grubic, Inc. 40 05 36 - 7 011139.0465
3.6 CLEANING
A. Section 01 73 00 - Execution Requirements: Requirements for cleaning.
B. Keep pipe interior clean as installation progresses.
C. Clean pipe interior of soil, grit, and other debris after pipe installation.
END OF SECTION
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: Fiberglass-reinforced (thermosetting) plastic pipe and fittings. Section also includes expansion joints and FRP damps. |
| B. Related Requirements: |
| 1. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping: Pipe penetrations, restrained joints, flexible connections, expansion joints and loops, and sleeve-type couplings. |
| 2. Section 40 05 07 - Hangers and Supports for Process Piping: Hangers, anchors, sleeves, and sealing of piping to adjacent structures. |
| 3. Section 40 05 51 - Common Requirements for Process Valves: Common product requirements for valves for placement by this Section. |
| 1.2 DEFINITIONS |
| A. Fiberglass-Reinforced (Thermosetting) Plastic (FRP) Pipe: Piping that contains glass-fiber reinforcement embedded in cured thermosetting resin. The glass-fiber reinforcement within the material system provides the mechanical strength and the thermo... |
| 1.3 REFERENCE STANDARDS |
| A. American Water Works Association: |
| 1. AWWA C950 - Fiberglass Pressure Pipe. |
| B. ASME International: |
| 1. ASME B31.3 - Process Piping. |
| C. ASTM International: |
| 1. ASTM A193/A193M - Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications. |
| 2. ASTM A194/A194M - Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both. |
| 3. ASTM D2310 - Standard Classification for Machine-Made "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe. |
| 4. ASTM D2992 - Standard Practice for Obtaining Hydrostatic or Pressure Design Basis for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe and Fittings. |
| 5. ASTM D3754 - Standard Specification for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Sewer and Industrial Pressure Pipe. |
| 6. ASTM D3892 - Standard Practice for Packaging/Packing of Plastics. |
| 7. ASTM D4024 - Standard Specification for Machine Made "Fiberglass" (Glass-Fiber-Reinforced Thermosetting Resin) Flanges. |
| 8. ASTM D4161 - Standard Specification for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe Joints Using Flexible Elastomeric Seals. |
| 9. ASTM D5421 - Standard Specification for Contact Molded "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Flanges. |
| 10. ASTM D5685 - Standard Specification for "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pressure Pipe Fittings. |
| 11. ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe. |
| 1.4 COORDINATION |
| A. Section 01 31 13 – Project Coordination: Requirements for coordination. |
| B. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings. |
| 1.5 PREINSTALLATION MEETINGS |
| A. Section 01 31 19 – Project Meetings: Requirements for preinstallation meeting. |
| B. Convene minimum one week prior to commencing Work of this Section. |
| 1.6 SUBMITTALS |
| A. Section 01 33 00 - Submittal Procedures: Requirements for submittals. |
| B. Product Data: Submit manufacturer's catalog information regarding pipe and fittings. |
| C. Shop Drawings: Indicate layout of piping systems, including equipment, critical dimensions, sizes, and materials lists. |
| D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. |
| E. Source Quality-Control Submittals: Indicate results of shop or factory tests and inspections. |
| F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. |
| G. Qualifications Statements: |
| 1. Submit qualifications for manufacturer, installer, and licensed professional. |
| 2. Submit manufacturer's approval of installer. |
| 1.7 CLOSEOUT SUBMITTALS |
| A. Section 01 77 00 - Closeout Requirements: Requirements for submittals. |
| B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and centerline elevations. |
| C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities. |
| 1.8 QUALITY ASSURANCE |
| A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards. |
| 1.9 QUALIFICATIONS |
| A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience. |
| B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience. |
| 1.10 DELIVERY, STORAGE, AND HANDLING |
| A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products. |
| B. Inspection: |
| 1. Accept materials on Site in manufacturer's original packaging and inspect for damage. |
| 2. Manufacturer's Packaging: Comply with ASTM D3892. |
| C. Store materials according to manufacturer instructions. |
| D. Protection: |
| 1. Protect materials from puncture, abrasion, moisture, dust, and UV by storing in clean, dry location remote from construction operations areas. |
| 2. Protect piping and appurtenances by storing off ground. |
| 3. Provide additional protection according to manufacturer instructions. |
| 1.11 EXISTING CONDITIONS |
| A. Field Measurements: |
| 1. Verify field measurements prior to fabrication. |
| 2. Indicate field measurements on Shop Drawings. |
| PART 2 - PRODUCTS |
| 2.1 FRP PIPE |
| A. FRP Pressure Pipe and Fittings: |
| 1. Materials: |
| a. Comply with ASTM D2996. |
| b. Type: 1. |
| c. Grade: 2. |
| d. Liner: FSK liner rated by an NRTL to comply with UL 181, Class 1. |
| 2. Pressure Rating: |
| a. Pressure Class: E. |
| b. Comply with ASTM D2310 and D2992. |
| 3. Round Fittings: Compression or spray-up/contact, molded of same material, pressure class, and joining method as duct |
| 4. Rectangular Fittings - Minimum 0.125-inch thick flat sheet with fiberglass roving and resin-reinforced joints and seams. |
| 5. Joints: Butt, ASTM D3754 or Flanged, ASTM D4024. |
| B. Joining Materials |
| 1. Roving and polyester resin. |
| 2. Fiberglass adhesive shall have a VOC content of 80 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24). |
| C. Fabrication: |
| 1. Fabricate joints, seams, transitions, reinforcement, elbows, branch connections, and access doors and panels according to SMACNA's "Thermoset FRP Duct Construction Manual," Chapter 7, "Requirements." |
| 2. Fabricate 90-degree rectangular mitered elbows to include turning vanes, 90-degree round elbows with a minimum of three segments for 12 inches and smaller and a minimum of five segments for 14 inches and larger. |
| 2.2 FRP DAMPERS |
| A. Size and location: As indicated on Drawings. |
| B. Description |
| 1. Dampers shall be suitable for temperature and chemical composition of air. Body and blade shall be constructed of a fiberglass reinforced plastic (FRP) material compatible with the piping system. |
| C. Materials |
| 1. Body: FRP. |
| 2. Blade: FRP. |
| 3. Shaft, external hardware, and attaching hardware: Shall be 316 SS. |
| 4. Seal to be EPDM, PTFE, or compatible material with service air. |
D. Manual operating handles.
| 2.3 FLEXIBLE CONNECTIONS |
| A. Manufacturers: General Rubber (PPI), or equal. |
| B. Description: Rubber expansion joints to relieve thermal stress or axial movements in FRP piping system. Flanged Connection. |
| C. Materials: |
| 1. Inner tube minimum ¼” thick elastomer compatible for media and temperature. |
| 2. Exterior cover shall be minimum 1/16” thickness compatible for media and temperature. |
| 3. Provide external cover as recommended by manufacturers for outside installations (weather and UV protection). |
| 4. Ductile iron retaining rings a minimum of 3/8” thickness. |
| 2.4 SOURCE QUALITY CONTROL |
| A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis. |
| B. Provide shop inspection and testing of completed pipe sections. |
| C. Certificate of Compliance: |
| 1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents. |
| 2. Specified shop tests are not required for Work performed by approved manufacturer. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Section 01 73 00 - Execution Requirements: Requirements for installation examination. |
| B. Verify that field dimensions are as indicated on Shop Drawings. |
| C. Inspect existing flanges for nonstandard bolt hole configurations or design, and verify that new pipe and flange mate properly. |
| 3.2 PREPARATION |
| A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation. |
| B. Thoroughly clean pipe and fittings before installation. |
| C. Cleaning: Clean surfaces to remove foreign substances. |
| 3.3 INSTALLATION |
| A. Comply with ASME B31.3. |
| B. Run piping straight along alignment as indicated on Shop Drawings, with minimum number of joints. |
| C. Fittings: |
| 1. According to manufacturer instructions. |
| 2. Gaskets: |
| a. Clean seats thoroughly. |
| b. Wipe gaskets clean prior to installation. |
3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions.
| D. Provide required upstream and downstream clearances from devices as indicated. |
| E. Install piping with sufficient slopes for venting or drainage of liquids and condensate to low points. |
| F. Support exposed piping as specified in Section 40 05 07 - Hangers and Supports for Process Piping. And as shown on Contract Drawings. |
| G. Provide expansion joints as specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping, and provide pipe guides as specified in Section 40 05 07 - Hangers and Supports for Process Piping, to compensate for pipe expansion d... |
| H. Field Cuts: According to pipe manufacturer instructions. |
| 3.4 TOLERANCES |
| A. Section 01 40 00 - Quality Requirements: Requirements for tolerances. |
| 3.5 FIELD QUALITY CONTROL |
| A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing. |
| B. Inspection: |
| 1. Inspect for piping defects that may be detrimental as determined by the Architect/Engineer. |
| 2. Complete a low pressure 5 PSI air test to locate leaks if any, repair leaks. |
| 3. Repair damaged piping, or provide new, undamaged pipe. |
| 4. After installation, inspect for proper supports and interferences. |
| 3.6 CLEANING |
| A. Section 01 73 00 - Execution Requirements: Requirements for cleaning. |
| B. Keep pipe interior clean as installation progresses. |
| C. Clean pipe interior of soil, grit, and other debris after pipe installation. |
File details come from the government source that posted it. Updated .