40 05 51 - Common Requirements For Process Valves.pdf

PDF 269 KB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This is a specification document for common requirements for process valves prepared by Herbert, Rowland & Grubic, Inc. for the Biosolids Project 011139.0465 being undertaken by Ephrata Borough Authority in Pennsylvania. The specification establishes comprehensive requirements for the supply and installation of valves and valve actuators, including related components such as handwheels, chainwheels, extension stems, and associated accessories. The document references applicable standards including AWWA C541, AWWA C542, AWWA C550, ASTM B62, ASTM B584, MSS SP-25, NEMA 250, NFPA 70, NSF 61, NSF 372, and UL Equipment Directory. Key submittal requirements include manufacturer product data with model numbers, valve cavitation limits, valve-labeling schedules, manufacturer's certificates, hydrostatic test results for valves larger than 12 inches, installation instructions, and shop and field quality-control test results. The specification requires a five-year manufacturer's warranty for all valves and actuators. Installation requirements mandate that valves be installed according to manufacturer instructions with proper support to avoid undue piping stresses, stems positioned upright or horizontal, and clearance provided for insulation installation and maintenance access.

The specification establishes performance and construction standards for valve components, including rated pressure and temperature bodies, properly rated bonnets, bronze valve stems complying with ASTM standards, and stem guides spaced at 10-foot intervals with Type 304 stainless steel required for submerged applications. Valve actuators must include position indicators for shutoff valves 6 inches and larger, comply with AWWA C542, and feature a maximum operating force of 60 pounds-force for gear-assisted manual and handwheel operations. Chain actuators for valves mounted 6 feet above operating floor level must extend to 5-½ feet above floor level using hot-dip galvanized chain. Electric motor actuators require single or double-reduction gearing with sealed lubrication and factory-mounted disconnect switches. All valve markings must comply with MSS SP-25, and finish coatings must comply with AWWA C550. Field quality control testing includes alignment verification and operational testing to demonstrate operation without undue noise, vibration, or overheating, with witnessing by the Architect/Engineer required. The document specifies that the manufacturer must have a minimum of three years' documented experience in manufacturing the specified products.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

40 05 51 - COMMON REQUIREMENTS FOR PROCESS VALVES

Herbert, Rowland & Grubic, Inc. 40 05 51 - 1 011139.0465

SECTION 40 05 51 - COMMON REQUIREMENTS FOR PROCESS VALVES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Valves.

2. Valve actuators.

B. Related Requirements:

1. Section 03 30 00 - Cast-in-Place Concrete: Execution requirements for placement of concrete as required by this Section.

2. Section 05 50 00 - Metal Fabrications: Miscellaneous metalwork and fasteners specified by this Section.

3. Section 09 90 00 - Painting and Coating: Product and execution requirements for painting specified by this Section.

4. Section 40 05 07 - Hangers and Supports for Process Piping: Product and execution requirements for valve supports specified by this Section.

5. Section 40 42 13 - Process Piping Insulation: Valve insulation as required by this Section.

1.2 REFERENCE STANDARDS

A. American Water Works Association:

1. AWWA C541 - Hydraulic and Pneumatic Cylinder and Vane-Type Actuators for Valves and Slide Gates.

2. AWWA C542 - Electric Motor Actuators for Valves and Slide Gates.

3. AWWA C550 - Protective Interior Coatings for Valves and Hydrants.

B. ASTM International:

1. ASTM B62 - Standard Specification for Composition Bronze or Ounce Metal Castings.

2. ASTM B584 - Standard Specification for Copper Alloy Sand Castings for General Applications.

C. Manufacturers Standardization Society:

1. MSS SP-25 - Standard Marking System for Valves, Fittings, Flanges, and Unions.

D. National Electrical Manufacturers Association:

1. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum).

E. NFPA:

1. NFPA 70 - National Electrical Code (NEC).

F. NSF International:

Herbert, Rowland & Grubic, Inc. 40 05 51 - 2 011139.0465

1. NSF 61 - Drinking Water System Components - Health Effects.

2. NSF 372 - Drinking Water System Components - Lead Content.

G. UL:

1. Equipment Directory.

1.3 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

B. Coordinate Work of this Section with piping, equipment, and appurtenances.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data:

1. Submit manufacturer information for actuator with model number and size indicated.

2. Submit valve cavitation limits.

C. Valve-Labeling Schedule: Indicate valve locations and nametag text.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Certification of Valves Larger Than 12 Inches: Furnish certified copies of hydrostatic factory tests, indicating compliance with applicable standards.

F. Manufacturer Instructions: Submit installation instructions and special requirements.

G. Source Quality-Control Submittals: Indicate results of shop tests and inspections.

H. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections, including factory-applied coatings.

I. Manufacturer Reports: Certify that equipment has been installed according to manufacturer instructions.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of valves and actuators.

1.6 QUALITY ASSURANCE

A. Maintain clearances as indicated on Drawings.

Herbert, Rowland & Grubic, Inc. 40 05 51 - 3 011139.0465

B. Ensure that materials of construction of wetted parts are compatible with process liquid.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Protect valve ends from entry of foreign materials by providing temporary covers and plugs.

3. Provide additional protection according to manufacturer instructions.

1.9 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

1.10 WARRANTY

A. Section 01 78 36 - Warranty Requirements: Requirements for warranties.

B. Furnish five-year manufacturer's warranty for valves and actuators.

PART 2 - PRODUCTS

2.1 VALVES

A. Description: Valves, operator, actuator, handwheel, chainwheel, extension stem, floor stand, worm and gear operator, operating nut, chain, wrench, and other accessories as required.

B. Valve Ends: Compatible with adjacent piping system.

C. Operation:

1. Open by turning counterclockwise close by turning clockwise.

Herbert, Rowland & Grubic, Inc. 40 05 51 - 4 011139.0465

2. Cast directional arrow on valve or actuator with OPEN and CLOSE cast on valve in appropriate location.

D. Valve Marking and Labeling:

1. Marking: Comply with MSS SP-25.

2. Labeling: As specified in each Section and Div 09.

3. Provide buried valves with valve boxes, covers, and extensions as specified in in respective sections.

E. Valve Construction:

1. Bodies: Rated for maximum temperature and pressure to which valve will be subjected as specified in valve Sections.

2. Bonnets:

a. Clamped, screwed, or flanged to body and of same material and pressure rating as body.

b. Furnish glands, packing nuts, or yokes as specified in valve Sections.

3. Stems and Stem Guides:

a. Materials and Seals: As specified in valve Sections.

b. Bronze Valve Stems: According to ASTM B62 or B584.

c. Space stem guides 10 feet o.c.

d. Submerged Stem Guides: Type 304 stainless steel.

4. Nuts and Bolts: As specified in Section 05 50 00 - Metal Fabrications.

2.2 VALVE ACTUATORS

A. Provide actuators with position indicators for shutoff valves 6 inches and larger.

B. Comply with AWWA C542.

C. Provide chain actuators for shutoff valves mounted 6 feet above operating floor level.

D. Provide gear and power actuators with position indicators.

E. Gear-Assisted Manual Actuators:

1. Provide totally enclosed gears.

2. Maximum Operating Force: 60 lbf.

3. Bearings: Permanently lubricated bronze.

4. Packing: Accessible for adjustment without requiring removal of actuator from valve.

F. Chain Actuator:

1. Description: Chain guides and hot-dip galvanized operating chain extending to 5- 1/2 feet above operating floor level.

2. Chain Wheels: Sprocket-rim type.

3. Furnish chain storage if chains may interfere with pedestrian traffic.

G. Valve Actuators in NEC Class I, Group D, Division 1 or 2 Hazardous Locations: UL approved.

Herbert, Rowland & Grubic, Inc. 40 05 51 - 5 011139.0465

H. Electric Motor Actuators:

1. As specified in Section 26 05 03 - Equipment Wiring Connections.

2. Controls: According to IO List and Division 26.

3. Disconnect Switch: Factory mounted in control panel.

4. Gearing:

a. Single- or double-reduction unit.

b. Spur or helical gears and worm gearing.

c. Lubrication: Grease or oil in sealed housing.

I. Accessories:

1. Handwheel:

a. Furnish permanently attached handwheel for emergency manual operation.

b. Rotation: None during powered operation.

c. Permanently affix directional arrow and cast OPEN and/or CLOSE on handwheel to indicate appropriate direction to turn handwheel.

d. Maximum Operating Force: 60 lbf.

2.3 INSULATION

A. As specified in Section 40 42 13 - Process Piping Insulation.

2.4 FINISHES

A. Valve Lining and Coating: Comply with AWWA C550.

B. Exposed Valves: As specified in Section 09 90 00 - Painting and Coating.

C. Do not coat flange faces of valves unless otherwise specified.

2.5 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.

B. Testing: Test valves according to manufacturer's standard testing protocol, including hydrostatic, seal, and performance testing.

C. Certificate of Compliance:

1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.

2. Specified shop tests are not required for Work performed by approved manufacturer.

Herbert, Rowland & Grubic, Inc. 40 05 51 - 6 011139.0465

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that piping system is ready for valve installation.

3.2 INSTALLATION

A. Install valves, actuators, extensions, valve boxes, and accessories according to manufacturer instructions.

B. Firmly support valves to avoid undue stresses on piping.

C. Coat studs, bolts and nuts with anti-seizing lubricant.

D. Clean field welds of slag and splatter to provide a smooth surface.

E. Install valves with stems upright or horizontal, not inverted.

F. Install brass male adapters on each side of valves in copper-piped system and solder adapters to pipe.

G. Install 3/4-inch ball valves with cap for drains at main shutoff valves, low points of piping, bases of vertical risers, and equipment.

H. Install valves with clearance for installation of insulation and to allow access.

I. Provide access where valves and fittings are not accessible.

J. Pipe Hangers and Supports: As specified in Section 40 05 07 - Hangers and Supports for Process Piping.

K. Comply with Division 40 - Process Interconnections for piping materials applying to various system types.

L. Install insulation as specified in Section 40 42 13 - Process Piping Insulation.

M. Install insulation as indicated on Drawings and to match existing conditions.

N. Valve Applications:

1. Install valves at locations as indicated on Drawings and as specified in this Section.

2. Install shutoff and isolation valves.

3. Isolate equipment, part of systems, or vertical risers as indicated on Drawings.

4. Install valves for throttling, bypass, or manual flow control services as indicated on Drawings.

5. Install ball, butterfly, and gate valves in water systems for shutoff service.

Herbert, Rowland & Grubic, Inc. 40 05 51 - 7 011139.0465

6. Install ball, butterfly, and gate valves in sanitary systems for shutoff service.

3.3 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Valve Field Testing:

1. Test for proper alignment.

2. If specified by valve Section, field test equipment to demonstrate operation without undue noise, vibration, or overheating.

3. Architect/Engineer will witness field testing.

END OF SECTION

PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Valves.
2. Valve actuators.
B. Related Requirements:
1. Section 03 30 00 - Cast-in-Place Concrete: Execution requirements for placement of concrete as required by this Section.
2. Section 05 50 00 - Metal Fabrications: Miscellaneous metalwork and fasteners specified by this Section.
3. Section 09 90 00 - Painting and Coating: Product and execution requirements for painting specified by this Section.
4. Section 40 05 07 - Hangers and Supports for Process Piping: Product and execution requirements for valve supports specified by this Section.
5. Section 40 42 13 - Process Piping Insulation: Valve insulation as required by this Section.
1.2 REFERENCE STANDARDS
A. American Water Works Association:
1. AWWA C541 - Hydraulic and Pneumatic Cylinder and Vane-Type Actuators for Valves and Slide Gates.
2. AWWA C542 - Electric Motor Actuators for Valves and Slide Gates.
3. AWWA C550 - Protective Interior Coatings for Valves and Hydrants.
B. ASTM International:
1. ASTM B62 - Standard Specification for Composition Bronze or Ounce Metal Castings.
2. ASTM B584 - Standard Specification for Copper Alloy Sand Castings for General Applications.
C. Manufacturers Standardization Society:
1. MSS SP-25 - Standard Marking System for Valves, Fittings, Flanges, and Unions.
D. National Electrical Manufacturers Association:
1. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum).
E. NFPA:
1. NFPA 70 - National Electrical Code (NEC).
F. NSF International:
1. NSF 61 - Drinking Water System Components - Health Effects.
2. NSF 372 - Drinking Water System Components - Lead Content.
G. UL:
1. Equipment Directory.
1.3 COORDINATION
A. Section 01 31 13 – Project Coordination: Requirements for coordination.
B. Coordinate Work of this Section with piping, equipment, and appurtenances.
1.4 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data:
1. Submit manufacturer information for actuator with model number and size indicated.
2. Submit valve cavitation limits.
C. Valve-Labeling Schedule: Indicate valve locations and nametag text.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Certification of Valves Larger Than 12 Inches: Furnish certified copies of hydrostatic factory tests, indicating compliance with applicable standards.
F. Manufacturer Instructions: Submit installation instructions and special requirements.
G. Source Quality-Control Submittals: Indicate results of shop tests and inspections.
H. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections, including factory-applied coatings.
I. Manufacturer Reports: Certify that equipment has been installed according to manufacturer instructions.
1.5 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record actual locations of valves and actuators.
1.6 QUALITY ASSURANCE
A. Maintain clearances as indicated on Drawings.
B. Ensure that materials of construction of wetted parts are compatible with process liquid.
1.7 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Protect valve ends from entry of foreign materials by providing temporary covers and plugs.
3. Provide additional protection according to manufacturer instructions.
1.9 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
2. Indicate field measurements on Shop Drawings.
1.10 WARRANTY
A. Section 01 78 36 - Warranty Requirements: Requirements for warranties.
B. Furnish five-year manufacturer's warranty for valves and actuators.
PART 2 - PRODUCTS
2.1 VALVES
A. Description: Valves, operator, actuator, handwheel, chainwheel, extension stem, floor stand, worm and gear operator, operating nut, chain, wrench, and other accessories as required.
B. Valve Ends: Compatible with adjacent piping system.
C. Operation:
1. Open by turning counterclockwise close by turning clockwise.
2. Cast directional arrow on valve or actuator with OPEN and CLOSE cast on valve in appropriate location.
D. Valve Marking and Labeling:
1. Marking: Comply with MSS SP-25.
2. Labeling: As specified in each Section and Div 09.
3. Provide buried valves with valve boxes, covers, and extensions as specified in in respective sections.
E. Valve Construction:
1. Bodies: Rated for maximum temperature and pressure to which valve will be subjected as specified in valve Sections.
2. Bonnets:
a. Clamped, screwed, or flanged to body and of same material and pressure rating as body.
b. Furnish glands, packing nuts, or yokes as specified in valve Sections.
3. Stems and Stem Guides:
a. Materials and Seals: As specified in valve Sections.
b. Bronze Valve Stems: According to ASTM B62 or B584.
c. Space stem guides 10 feet o.c.
d. Submerged Stem Guides: Type 304 stainless steel.

4. Nuts and Bolts: As specified in Section 05 50 00 - Metal Fabrications.

2.2 VALVE ACTUATORS
A. Provide actuators with position indicators for shutoff valves 6 inches and larger.
B. Comply with AWWA C542.
C. Provide chain actuators for shutoff valves mounted 6 feet above operating floor level.
D. Provide gear and power actuators with position indicators.
E. Gear-Assisted Manual Actuators:
1. Provide totally enclosed gears.
2. Maximum Operating Force: 60 lbf.
3. Bearings: Permanently lubricated bronze.
4. Packing: Accessible for adjustment without requiring removal of actuator from valve.
F. Chain Actuator:
1. Description: Chain guides and hot-dip galvanized operating chain extending to 5-1/2 feet above operating floor level.
2. Chain Wheels: Sprocket-rim type.
3. Furnish chain storage if chains may interfere with pedestrian traffic.
G. Valve Actuators in NEC Class I, Group D, Division 1 or 2 Hazardous Locations: UL approved.
H. Electric Motor Actuators:
1. As specified in Section 26 05 03 - Equipment Wiring Connections.
2. Controls: According to IO List and Division 26.
3. Disconnect Switch: Factory mounted in control panel.
4. Gearing:
a. Single- or double-reduction unit.
b. Spur or helical gears and worm gearing.
c. Lubrication: Grease or oil in sealed housing.
I. Accessories:
1. Handwheel:
a. Furnish permanently attached handwheel for emergency manual operation.
b. Rotation: None during powered operation.
c. Permanently affix directional arrow and cast OPEN and/or CLOSE on handwheel to indicate appropriate direction to turn handwheel.
d. Maximum Operating Force: 60 lbf.
2.3 INSULATION
A. As specified in Section 40 42 13 - Process Piping Insulation.
2.4 FINISHES
A. Valve Lining and Coating: Comply with AWWA C550.
B. Exposed Valves: As specified in Section 09 90 00 - Painting and Coating.
C. Do not coat flange faces of valves unless otherwise specified.
2.5 SOURCE QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.
B. Testing: Test valves according to manufacturer's standard testing protocol, including hydrostatic, seal, and performance testing.
C. Certificate of Compliance:
1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify that piping system is ready for valve installation.
3.2 INSTALLATION
A. Install valves, actuators, extensions, valve boxes, and accessories according to manufacturer instructions.
B. Firmly support valves to avoid undue stresses on piping.
C. Coat studs, bolts and nuts with anti-seizing lubricant.
D. Clean field welds of slag and splatter to provide a smooth surface.
E. Install valves with stems upright or horizontal, not inverted.
F. Install brass male adapters on each side of valves in copper-piped system and solder adapters to pipe.
G. Install 3/4-inch ball valves with cap for drains at main shutoff valves, low points of piping, bases of vertical risers, and equipment.
H. Install valves with clearance for installation of insulation and to allow access.
I. Provide access where valves and fittings are not accessible.
J. Pipe Hangers and Supports: As specified in Section 40 05 07 - Hangers and Supports for Process Piping.
K. Comply with Division 40 - Process Interconnections for piping materials applying to various system types.
L. Install insulation as specified in Section 40 42 13 - Process Piping Insulation.
M. Install insulation as indicated on Drawings and to match existing conditions.
N. Valve Applications:
1. Install valves at locations as indicated on Drawings and as specified in this Section.
2. Install shutoff and isolation valves.
3. Isolate equipment, part of systems, or vertical risers as indicated on Drawings.
4. Install valves for throttling, bypass, or manual flow control services as indicated on Drawings.
5. Install ball, butterfly, and gate valves in water systems for shutoff service.
6. Install ball, butterfly, and gate valves in sanitary systems for shutoff service.
3.3 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
B. Valve Field Testing:
1. Test for proper alignment.
2. If specified by valve Section, field test equipment to demonstrate operation without undue noise, vibration, or overheating.
3. Architect/Engineer will witness field testing.

File details come from the government source that posted it. Updated .