40 05 31 - Thermoplastic Process Pipe.pdf
PDF 275 KB Posted
- Attached to
- Biosolids Project 011139.0465
- Solicitation number
- US.260443
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a technical specification document for thermoplastic process pipe, prepared by Herbert, Rowland & Grubic, Inc., for the Biosolids Project 011139.0465 administered by Ephrata Borough Authority in Pennsylvania. The specification covers polyvinyl chloride (PVC) pipe, fittings, and related accessories for process piping applications. The document establishes material requirements including Schedule 80 PVC pipe complying with ASTM D1785, Schedule 80 fittings per ASTM D2467, and socket solvent-welded, flanged, or threaded joints in accordance with ASTM D2855. The specification mandates a minimum cell classification of 12545-C for PVC materials and requires accessories including stainless steel flange bolting (ASTM A193/Grade), stainless steel hex-head nuts (ASTM A194/Grade), full-faced EPDM gaskets complying with ASME B16.21, and solvent cement meeting ASTM D2564 with primers per ASTM F656. Installation must comply with ASME B31.3 process piping standards with verification of field dimensions prior to fabrication, proper cleaning of surfaces, progressive bolt tightening using torque wrenches, and adequate slopes for venting and drainage. The specification includes comprehensive reference standards from the American Water Works Association (AWWA), ASME International, and ASTM International, encompassing forty standards addressing various plastic pipe materials, joining methods, and installation practices.
The document requires manufacturers to have a minimum of three years' documented experience in producing specified products and mandates permanent marking of each pipe length with the manufacturer's name and standards conformance. Pipe installation temperature limits are restricted to between 40 degrees Fahrenheit and 90 degrees Fahrenheit for exposed piping in direct sunlight, with UV protection required for all above-ground or outdoor installations. Materials must be delivered in original manufacturer packaging, inspected for damage, and stored in clean, dry locations remote from construction areas, with additional off-ground storage and protection per manufacturer instructions. Field quality control includes inspection for defects, repair or replacement of damaged piping, verification of proper supports and interferences, and pressure testing as specified in Section 33 05 05. Laying tolerances are specified at ±1/8 inch in 10 feet, and the specification requires project record documents identifying actual piping locations, valve placements, appurtenances, connections, and centerline elevations, along with documentation of any unexpected subsurface conditions or uncharted utilities discovered during installation.
View the file
Other files
Show 40 more
Latest 50 of 125 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40 05 31 - THERMOPLASTIC PROCESS PIPE
Herbert, Rowland & Grubic, Inc. 40 05 31 - 1 011139.0465
SECTION 40 05 31 - THERMOPLASTIC PROCESS PIPE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. PVC pipe.
2. Fittings.
3. Accessories for plastic piping.
B. Related Requirements:
1. Section 33 05 05 – Hydrostatic Testing.
2. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping.
3. Section 40 05 07 - Hangers and Supports for Process Piping.
4. Section 40 05 51 - Common Requirements for Process Valves.
1.2 REFERENCE STANDARDS
A. American Water Works Association:
1. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings.
2. AWWA C900 - Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In.
through 12 In., for Water Transmission and Distribution.
3. AWWA C901 - Polyethylene (PE) Pressure Pipe and Tubing, 1/2 In. (13 mm) through 3 In. (76 mm), for Water Service.
4. AWWA C906 - Polyethylene (PE) Pressure Pipe and Fittings, 4 In. (100 mm) through 63 In. (1,600 mm), for Water Distribution and Transmission.
B. ASME International:
1. ASME B1.1 - Unified Inch Screw Threads (UN and UNR Thread Form).
2. ASME B1.20.1 - Pipe Threads, General Purpose (Inch).
3. ASME B1.20.2M - Pipe Threads, 60 deg., General Purpose.
4. ASME B16.1 - Cast Iron Pipe Flanges and Flanged Fittings, Classes 25, 125, 250 and
800.
5. ASME B16.5 - Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24
Metric/Inch Standard.
6. ASME B16.20 - Metallic Gaskets for Pipe Flanges: Ring-Joint, Spiral-Wound, and
Jacketed.
7. ASME B16.21 - Nonmetallic Flat Gaskets for Pipe Flanges.
8. ASME B31.3 - Process Piping.
C. ASTM International:
1. ASTM A193/A193M - Standard Specification for Alloy-Steel and Stainless Steel
Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications.
2. ASTM A194/A194M -Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both.
Herbert, Rowland & Grubic, Inc. 40 05 31 - 2 011139.0465
3. ASTM D1527 - Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe, Schedules 40 and 80.
4. ASTM D1784 - Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds.
5. ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.
6. ASTM D2235 - Standard Specification for Solvent Cement for Acrylonitrile- Butadiene-Styrene (ABS) Plastic Pipe and Fittings.
7. ASTM D2241 - Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure- Rated Pipe (SDR Series).
8. ASTM D2447 - Standard Specification for Polyethylene (PE) Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter.
9. ASTM D2464 - Standard Specification for Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80.
10. ASTM D2466 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40.
11. ASTM D2467 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80.
12. ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems.
13. ASTM D2609 - Standard Specification for Plastic Insert Fittings for Polyethylene (PE) Plastic Pipe.
14. ASTM D2657 - Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings.
15. ASTM D2661 - Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain, Waste, and Vent Pipe and Fittings.
16. ASTM D2683 - Standard Specification for Socket-Type Polyethylene Fittings for Outside Diameter-Controlled Polyethylene Pipe and Tubing.
17. ASTM D2737 - Standard Specification for Polyethylene (PE) Plastic Tubing.
18. ASTM D2837 - Standard Test Method for Obtaining Hydrostatic Design Basis for
Thermoplastic Pipe Materials or Pressure Design Basis for Thermoplastic Pipe Products.
19. ASTM D2855 - Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings.
20. ASTM D3035 - Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Controlled Outside Diameter.
21. ASTM D3139 - Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals.
22. ASTM D3222 - Standard Specification for Unmodified Poly(Vinylidene Fluoride) (PVDF) Molding Extrusion and Coating Materials.
23. ASTM D3261 - Standard Specification for Butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing.
24. ASTM D3350 - Standard Specification for Polyethylene Plastics Pipe and Fittings Materials.
25. ASTM D3892 - Standard Practice for Packaging/Packing of Plastics.
26. ASTM D3965 - Standard Classification System and Basis for Specifications for Rigid
Acrylonitrile-Butadiene-Styrene (ABS) Materials for Pipe and Fittings.
Herbert, Rowland & Grubic, Inc. 40 05 31 - 3 011139.0465
27. ASTM F402 - Standard Practice for Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings.
28. ASTM F437 - Standard Specification for Threaded Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80.
29. ASTM F438 - Standard Specification for Socket-Type Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 40.
30. ASTM F439 - Standard Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80.
31. ASTM F441/F441M - Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe, Schedules 40 and 80.
32. ASTM F442/F442M - Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe (SDR-PR).
33. ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe.
34. ASTM F493 - Standard Specification for Solvent Cements for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe and Fittings.
35. ASTM F656 - Standard Specification for Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings.
36. ASTM F714 - Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Outside Diameter.
37. ASTM F876 - Standard Specification for Crosslinked Polyethylene (PEX) Tubing.
38. ASTM F1055 - Standard Specification for Electrofusion Type Polyethylene Fittings for Outside Diameter Controlled Polyethylene and Crosslinked Polyethylene (PEX) Pipe and Tubing.
39. ASTM F1056 - Standard Specification for Socket Fusion Tools for Use in Socket Fusion Joining Polyethylene Pipe or Tubing and Fittings.
40. ASTM F1290 - Standard Practice for Electrofusion Joining Polyolefin Pipe and Fittings.
1.3 COORDINATION
A. Section 01 31 13 – Project Coordination: Requirements for coordination.
B. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings.
1.4 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer's catalog information regarding pipe and fittings.
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
1.5 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.
Herbert, Rowland & Grubic, Inc. 40 05 31 - 4 011139.0465
B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and centerline elevations.
C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.6 QUALITY ASSURANCE
A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards.
1.7 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection:
1. Accept materials on Site in manufacturer's original packaging and inspect for damage.
2. Manufacturer's Packaging: Comply with ASTM D3892.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from puncture, abrasion, moisture, dust, and UV by storing in clean, dry location remote from construction operations areas.
2. Protect piping and appurtenances by storing off ground.
3. Provide additional protection according to manufacturer instructions.
1.9 AMBIENT CONDITIONS
A. Section 01 50 00 - Temporary Facilities and Controls: Requirements for ambient condition control facilities for product storage and installation.
B. Minimum and Maximum Temperatures: Do not install pipe when temperature is below 40 degrees F or above 90 degrees F if pipe is exposed to direct sunlight.
C. UV Protection: Provide pipe installed above ground or outside with UV protection.
1.10 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
Herbert, Rowland & Grubic, Inc. 40 05 31 - 5 011139.0465
PART 2 - PRODUCTS
2.1 PVC PIPE, TUBE, AND FITTINGS
A. PVC Pipe and Fittings:
1. Pipe:
a. Comply with ASTM D1785.
b. Schedule: 80.
2. Fittings: ASTM D2467, Schedule 80.
3. Joints: ASTM D2855, socket, solvent welded, Flanged, or Threaded.
4. Materials:
a. Comply with ASTM D1784.
b. Minimum Cell Classification: 12545-C.
2.2 FINISHES
A. Coat machined faces of metallic flanges with temporary rust-inhibitive coating.
2.3 ACCESSORIES
A. PVC Piping:
1. Flange Bolting:
a. Hex-Head Bolts: Stainless steel; ASTM A193/Grade.
b. Hex-Head Nuts: Stainless steel; ASTM A194/Grade.
2. Flange Gaskets:
a. Type: Full faced.
b. Material: EPDM.
c. Comply with ASME B16.21.
3. Solvent Cement:
a. Comply with ASTM D2564.
b. Primers: Comply with ASTM F656.
2.4 SOURCE QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.
B. Provide shop inspection and testing of completed pipe sections and tubes.
C. Certificate of Compliance:
1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved manufacturer.
Herbert, Rowland & Grubic, Inc. 40 05 31 - 6 011139.0465
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify that field dimensions are as indicated on Drawings.
C. Inspect existing flanges for nonstandard bolt hole configurations or design and verify that new pipe and flange mate properly.
3.2 PREPARATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.
B. Ream pipe and tube ends, remove burrs.
C. Thoroughly clean pipe and fittings before installation.
D. Cleaning: Clean surfaces to remove foreign substances.
3.3 INSTALLATION
A. Comply with ASME B31.3.
B. Run piping straight along alignment as indicated on Drawings, with minimum number of joints.
C. Fittings:
1. According to manufacturer instructions.
2. Gaskets:
a. Clean seats thoroughly.
b. Wipe gaskets clean prior to installation.
3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions.
D. Provide required upstream and downstream clearances from devices as indicated.
E. Install piping with sufficient slopes for venting or drainage of liquids and condensate to low points.
F. Support exposed piping as specified in Section 40 05 07 - Hangers and Supports for Process Piping.
G. Provide expansion joints as specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping.
H. Field Cuts: According to pipe manufacturer instructions.
Herbert, Rowland & Grubic, Inc. 40 05 31 - 7 011139.0465
I. Joining:
1. Primers and Cleaners: Comply with ASTM F402.
2. PVC Solvent-Cemented Joints: Comply with ASTM D2855.
3.4 TOLERANCES
A. Section 01 40 00 - Quality Requirements: Requirements for tolerances.
B. Laying Tolerances: ¼ inch in 10 feet.
3.5 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
B. Inspection:
1. Inspect for piping defects that may be detrimental as determined by the
Architect/Engineer.
2. Repair damaged piping, or provide new, undamaged pipe.
3. After installation, inspect for proper supports and interferences.
C. Pressure Testing:
1. As indicated in Section 33 05 05.31.
3.6 CLEANING
A. Section 01 73 00 - Execution Requirements: Requirements for cleaning.
B. Keep pipe interior clean as installation progresses.
C. Clean pipe interior of soil, grit, shavings, and other debris after pipe installation.
END OF SECTION
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. PVC pipe. |
| 2. Fittings. |
| 3. Accessories for plastic piping. |
| B. Related Requirements: |
| 1. Section 33 05 05 – Hydrostatic Testing. |
| 2. Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping. |
| 3. Section 40 05 07 - Hangers and Supports for Process Piping. |
| 4. Section 40 05 51 - Common Requirements for Process Valves. |
| 1.2 REFERENCE STANDARDS |
| A. American Water Works Association: |
| 1. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. |
| 2. AWWA C900 - Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In. through 12 In., for Water Transmission and Distribution. |
| 3. AWWA C901 - Polyethylene (PE) Pressure Pipe and Tubing, 1/2 In. (13 mm) through 3 In. (76 mm), for Water Service. |
| 4. AWWA C906 - Polyethylene (PE) Pressure Pipe and Fittings, 4 In. (100 mm) through 63 In. (1,600 mm), for Water Distribution and Transmission. |
| B. ASME International: |
| 1. ASME B1.1 - Unified Inch Screw Threads (UN and UNR Thread Form). |
| 2. ASME B1.20.1 - Pipe Threads, General Purpose (Inch). |
| 3. ASME B1.20.2M - Pipe Threads, 60 deg., General Purpose. |
| 4. ASME B16.1 - Cast Iron Pipe Flanges and Flanged Fittings, Classes 25, 125, 250 and 800. |
| 5. ASME B16.5 - Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard. |
| 6. ASME B16.20 - Metallic Gaskets for Pipe Flanges: Ring-Joint, Spiral-Wound, and Jacketed. |
| 7. ASME B16.21 - Nonmetallic Flat Gaskets for Pipe Flanges. |
| 8. ASME B31.3 - Process Piping. |
| C. ASTM International: |
| 1. ASTM A193/A193M - Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications. |
| 2. ASTM A194/A194M -Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both. |
| 3. ASTM D1527 - Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe, Schedules 40 and 80. |
| 4. ASTM D1784 - Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds. |
| 5. ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120. |
| 6. ASTM D2235 - Standard Specification for Solvent Cement for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe and Fittings. |
| 7. ASTM D2241 - Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series). |
| 8. ASTM D2447 - Standard Specification for Polyethylene (PE) Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter. |
| 9. ASTM D2464 - Standard Specification for Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80. |
| 10. ASTM D2466 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40. |
| 11. ASTM D2467 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80. |
| 12. ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems. |
| 13. ASTM D2609 - Standard Specification for Plastic Insert Fittings for Polyethylene (PE) Plastic Pipe. |
| 14. ASTM D2657 - Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings. |
| 15. ASTM D2661 - Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain, Waste, and Vent Pipe and Fittings. |
| 16. ASTM D2683 - Standard Specification for Socket-Type Polyethylene Fittings for Outside Diameter-Controlled Polyethylene Pipe and Tubing. |
| 17. ASTM D2737 - Standard Specification for Polyethylene (PE) Plastic Tubing. |
| 18. ASTM D2837 - Standard Test Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipe Materials or Pressure Design Basis for Thermoplastic Pipe Products. |
| 19. ASTM D2855 - Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings. |
| 20. ASTM D3035 - Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Controlled Outside Diameter. |
| 21. ASTM D3139 - Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals. |
| 22. ASTM D3222 - Standard Specification for Unmodified Poly(Vinylidene Fluoride) (PVDF) Molding Extrusion and Coating Materials. |
| 23. ASTM D3261 - Standard Specification for Butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing. |
| 24. ASTM D3350 - Standard Specification for Polyethylene Plastics Pipe and Fittings Materials. |
| 25. ASTM D3892 - Standard Practice for Packaging/Packing of Plastics. |
| 26. ASTM D3965 - Standard Classification System and Basis for Specifications for Rigid Acrylonitrile-Butadiene-Styrene (ABS) Materials for Pipe and Fittings. |
| 27. ASTM F402 - Standard Practice for Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings. |
| 28. ASTM F437 - Standard Specification for Threaded Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80. |
| 29. ASTM F438 - Standard Specification for Socket-Type Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 40. |
| 30. ASTM F439 - Standard Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80. |
| 31. ASTM F441/F441M - Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe, Schedules 40 and 80. |
| 32. ASTM F442/F442M - Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe (SDR-PR). |
| 33. ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe. |
| 34. ASTM F493 - Standard Specification for Solvent Cements for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe and Fittings. |
| 35. ASTM F656 - Standard Specification for Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings. |
| 36. ASTM F714 - Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Outside Diameter. |
| 37. ASTM F876 - Standard Specification for Crosslinked Polyethylene (PEX) Tubing. |
| 38. ASTM F1055 - Standard Specification for Electrofusion Type Polyethylene Fittings for Outside Diameter Controlled Polyethylene and Crosslinked Polyethylene (PEX) Pipe and Tubing. |
| 39. ASTM F1056 - Standard Specification for Socket Fusion Tools for Use in Socket Fusion Joining Polyethylene Pipe or Tubing and Fittings. |
| 40. ASTM F1290 - Standard Practice for Electrofusion Joining Polyolefin Pipe and Fittings. |
| 1.3 COORDINATION |
| A. Section 01 31 13 – Project Coordination: Requirements for coordination. |
| B. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings. |
| 1.4 SUBMITTALS |
| A. Section 01 33 00 - Submittal Procedures: Requirements for submittals. |
| B. Product Data: Submit manufacturer's catalog information regarding pipe and fittings. |
| C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. |
| 1.5 CLOSEOUT SUBMITTALS |
| A. Section 01 77 00 - Closeout Requirements: Requirements for submittals. |
| B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and centerline elevations. |
| C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities. |
| 1.6 QUALITY ASSURANCE |
| A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards. |
| 1.7 QUALIFICATIONS |
| A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience. |
| 1.8 DELIVERY, STORAGE, AND HANDLING |
| A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products. |
| B. Inspection: |
| 1. Accept materials on Site in manufacturer's original packaging and inspect for damage. |
| 2. Manufacturer's Packaging: Comply with ASTM D3892. |
| C. Store materials according to manufacturer instructions. |
| D. Protection: |
| 1. Protect materials from puncture, abrasion, moisture, dust, and UV by storing in clean, dry location remote from construction operations areas. |
| 2. Protect piping and appurtenances by storing off ground. |
| 3. Provide additional protection according to manufacturer instructions. |
| 1.9 AMBIENT CONDITIONS |
| A. Section 01 50 00 - Temporary Facilities and Controls: Requirements for ambient condition control facilities for product storage and installation. |
| B. Minimum and Maximum Temperatures: Do not install pipe when temperature is below 40 degrees F or above 90 degrees F if pipe is exposed to direct sunlight. |
| C. UV Protection: Provide pipe installed above ground or outside with UV protection. |
| 1.10 EXISTING CONDITIONS |
| A. Field Measurements: |
| 1. Verify field measurements prior to fabrication. |
| PART 2 - PRODUCTS |
| 2.1 PVC PIPE, TUBE, AND FITTINGS |
| A. PVC Pipe and Fittings: |
| 1. Pipe: |
| a. Comply with ASTM D1785. |
| b. Schedule: 80. |
| 2. Fittings: ASTM D2467, Schedule 80. |
| 3. Joints: ASTM D2855, socket, solvent welded, Flanged, or Threaded. |
| 4. Materials: |
| a. Comply with ASTM D1784. |
| b. Minimum Cell Classification: 12545-C. |
| 2.2 FINISHES |
| A. Coat machined faces of metallic flanges with temporary rust-inhibitive coating. |
| 2.3 ACCESSORIES |
| A. PVC Piping: |
| 1. Flange Bolting: |
| a. Hex-Head Bolts: Stainless steel; ASTM A193/Grade. |
| b. Hex-Head Nuts: Stainless steel; ASTM A194/Grade. |
| 2. Flange Gaskets: |
| a. Type: Full faced. |
| b. Material: EPDM. |
| c. Comply with ASME B16.21. |
| 3. Solvent Cement: |
| a. Comply with ASTM D2564. |
| b. Primers: Comply with ASTM F656. |
| 2.4 SOURCE QUALITY CONTROL |
| A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis. |
| B. Provide shop inspection and testing of completed pipe sections and tubes. |
| C. Certificate of Compliance: |
| 1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents. |
| 2. Specified shop tests are not required for Work performed by approved manufacturer. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Section 01 73 00 - Execution Requirements: Requirements for installation examination. |
| B. Verify that field dimensions are as indicated on Drawings. |
| C. Inspect existing flanges for nonstandard bolt hole configurations or design and verify that new pipe and flange mate properly. |
| 3.2 PREPARATION |
| A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation. |
| B. Ream pipe and tube ends, remove burrs. |
| C. Thoroughly clean pipe and fittings before installation. |
| D. Cleaning: Clean surfaces to remove foreign substances. |
| 3.3 INSTALLATION |
| A. Comply with ASME B31.3. |
| B. Run piping straight along alignment as indicated on Drawings, with minimum number of joints. |
| C. Fittings: |
| 1. According to manufacturer instructions. |
| 2. Gaskets: |
| a. Clean seats thoroughly. |
| b. Wipe gaskets clean prior to installation. |
3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions.
| D. Provide required upstream and downstream clearances from devices as indicated. |
| E. Install piping with sufficient slopes for venting or drainage of liquids and condensate to low points. |
| F. Support exposed piping as specified in Section 40 05 07 - Hangers and Supports for Process Piping. |
| G. Provide expansion joints as specified in Section 40 05 06 - Couplings, Adapters, and Specials for Process Piping. |
| H. Field Cuts: According to pipe manufacturer instructions. |
| I. Joining: |
| 1. Primers and Cleaners: Comply with ASTM F402. |
| 2. PVC Solvent-Cemented Joints: Comply with ASTM D2855. |
| 3.4 TOLERANCES |
| A. Section 01 40 00 - Quality Requirements: Requirements for tolerances. |
| B. Laying Tolerances: ¼ inch in 10 feet. |
| 3.5 FIELD QUALITY CONTROL |
| A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing. |
| B. Inspection: |
| 1. Inspect for piping defects that may be detrimental as determined by the Architect/Engineer. |
| 2. Repair damaged piping, or provide new, undamaged pipe. |
| 3. After installation, inspect for proper supports and interferences. |
| C. Pressure Testing: |
| 1. As indicated in Section 33 05 05.31. |
| 3.6 CLEANING |
| A. Section 01 73 00 - Execution Requirements: Requirements for cleaning. |
| B. Keep pipe interior clean as installation progresses. |
| C. Clean pipe interior of soil, grit, shavings, and other debris after pipe installation. |
File details come from the government source that posted it. Updated .