4. AF Form 66 Schedule of Material Submittals.xls

XLS spreadsheet 91 KB Posted

Attached to
Repair BPC Gym Federal contract opportunity
Solicitation number
FA5702-21-R-0005
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a schedule of material submittals for the repair of Al Udeid Air Base's BPC Gym under solicitation number FA5702-21-R-0005 issued by the Department of the Air Force Air Combat Command. The schedule requires the submission of project plans and documentation at various stages, including a 65% design submittal due at acceptance of the non-priced technical proposal plus five days, a 95% design submittal due at acceptance of the priced proposal plus five days, construction schedules due at contract award plus five days, warranty documents due seven days after final completion, and as-built drawings due in AutoCAD and PDF format at final completion. It also requires the submission of material data, test results, operations and maintenance manuals, and DD Form 1354 at various stages of the project.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION / CONTRACT NO.
20-0033Repair BPC Gym B10550FA570221R0005
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIF. OF COMPLIANCESHOP DRAWINGSCOLOR SELECTIONMANUFATURUR'S RECOMMENDATIONCATALOG DATAO&M RECOMMENDATIONSCALCULATIONSWARRANTYDRAWINGSREPORTSTEST RESULTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
GENERALThis document shall be a "live document"
1Project Specific Form 66XANTP + 5
2Construction ScheduleXANTP + 5
3Contractor's Health, Safety, and Environment PlanXANTP + 5
4Contractor's QA/QC PlanXANTP + 5
5Copy of Engineering License(s) of person or consultancy responsible for designXANTP + 5Provide certified translation if not in English.
DESIGN
6All submissions to be provided electronically.XXXXXXXXXXX
765% Design & Form 66XX
895% Design, Form 66, & Draft 1354XX
9Construction ScheduleXCNTP + 5
Material Submittals-Contractor to complete this section with all materials to be used in construction (Ex. Below)
TEST RESULTS
10All submissions to be provided electronically.X
11Hydrostatic Test
12Leakage Test
13Bacteriolocgical TestingXX
14Backflow Preventer Tests
15Electrical Inspections/Testing
CLOSEOUT
16Warranty DocumentsXFinal + 7
17O&M ManualsFinal + 7
18DD 1354Final + 7
19As-Builts (electronic in AutoCAD & PDF)XFinal + 7
Schedule of Material Submittals Template, Apr 18 (SAF/AQCP)

Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal