9. Base Access Information.pdf
PDF 124 KB Posted
- Attached to
- Repair BPC Gym Federal contract opportunity
- Solicitation number
- FA5702-21-R-0005
About this file
This document provides base access information and requirements for contractors working at Al Udeid Air Base in Qatar. It outlines the various passes required such as vehicle entry authorization and entry authorization applications. The process takes approximately 60 days and involves submitting applications, scheduling appointments for interviews, fingerprinting, and badge printing. Contractors must arrange military escorts 72 hours in advance of needing access to base and notify the program manager of any changes within 24 hours.
The related federal contract opportunity is a solicitation for repair work at Al Udeid Air Base's BPC Gym. Proposals are due July 8, 2021 at 1:00 PM local time and must follow the instructions in Sections L and M. The solicitation was issued by the Department of the Air Force Air Combat Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question and Answers.pdf | ||
| Solicitation Amendment FA570221R00050002 SF 30.pdf | ||
| Solicitation Amendment FA570221R00050001 SF 30.pdf | ||
| 11. 20-0033 LD Construction (signed).pdf | ||
| 3. AF Form 3000 Material Submittal.pdf | ||
| 6. AF Form 3065 Progress Report.pdf | ||
| 8. Past Performance Questionnaire.docx | DOCX document | |
| 10. 20-0033 LD Design (signed).pdf | ||
| Solicitation - FA570221R0005.pdf | ||
| 1. 20-0033 Repair BPC Gym (B10550) SOW.pdf | ||
| 2. 20-0033 REPAIR BPC GYM (B10550) V6.pdf | ||
| 4. AF Form 66 Schedule of Material Submittals.xls | XLS spreadsheet | |
| 5. AF Form 3064 Progress Schedule.xlsx | XLSX spreadsheet | |
| 7. Construction Cost Estimate Breakdown.xls | XLS spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5702-21-R-0005
Attachment 9
Base Access Overview
1. Different Passes
a. Vehicle Entry Authorization Application (VEAA) - for 6 months, allows vehicles to pass
Qatari gate. Drivers still need access. Submitted to the UPC office and picked up at the Qatar office.
b. Entry Authorization Application (EAA) - for six months. Allows personnel to pass through Qatari gate. Contract must be signed to start EAA process. Submitted to the UPC office and picked up at the Qatar office. Cost 50 Riyals at pick up per person.
c. Unescorted Entry Authorization Application (UEAA) – only use when critical accomplishing project on time in accordance with contract. Personnel must still apply for an EAA and the approved EAA is submitted with UEAA. Submitted to the UPC office and picked up at UPC office.
d. Multi-Media (MM) – allows use of multi-media devices on base (phones, laptops, etc.)
Device must not have built in camera, webcam, and or GPS capabilities. Submitted to the UPC office and picked up at UPC office.
e. Installation Access Application (IAA) – Used to schedule VET and LEPST appointments.
Must have approved EAA or UEAA to submit IAA. Contractor’s POC is sent all scheduled appointments for personnel every Thursday for the following week.
2. Appointments
a. VET - Contractor personnel should have approved EAA, QID, and a valid passport and arrive 15 minutes early. Anyone 15 minutes late to their appointment will have their appointments canceled. If appointments are missed twice, individuals won’t be granted access to the base.
b. LEPTS – Contractor personnel should have approved EAA, QID, a valid passport, and BIDS sheet and arrive 15 minutes early to the DBIDS office. If appointments are missed twice, individuals won’t be granted access to the base.
3. Process (Approximately 60 day process)
a. The base pass process starts after contract award.
b. The Entry Authorization Application (EAA) is submitted to the 379 Expeditionary Civil
Engineering Squadron (ECES) Unit Pass Coordinator (UPC) Office. Maximum length is 6 months.
c. EAA is reviewed by the UPC and sent to the Qatari Office for review/approval.
Contractor picks up EAA from Qatar Office. Cost 50 Riyals per person.
d. The Installation Access Application (IAA) is submitted to the UPC.
e. The UPCE makes contractor appointments with DBIDS and LEPTS offices
f. Contractors are interviewed my LEPTS.
g. Contractors attend finger printing appointment via VET.
h. A Badge is scheduled to be printed.
4. Responsibilities
a. ECONS will provide to the UPC an MFR of all pertinent dates of the contract and the company that shall be submitting base access request to the UPC for the requirement.
FA5702-21-R-0005
Attachment 9
b. The UPC office will request pertinent information from the contractors to fill out the base pass request to include, but not limited to, names of personnel, the Qatari ID numbers, Passport numbers, etc.
c. The contractor shall be prompt in replying to the UPCs in their request for supporting documentation to complete the base access request for the contractor’s personnel, vehicles, etc. when necessary. The contractor shall not submit individuals from the following nationalities: AFGHANISTAN, BURUNDI, CHINA, EGYPT, IRAN, IRAQ, LIBYA, MALI, NORTH KOREA, PAKISTAN, RUSSIA, SAUDIA ARABIA, SYRIA, VENEZUELA, and YEMEN. If any individuals from these countries are submitted, Host Nation may deny entry into the base.
5. Escorts
a. Upon entry into AUAB, contractor personnel are required to be in the presence of a military escort at all times.
b. The contractor shall notify the program manager (379th Expeditionary Civil Engineering
Squadron) 72 hours in advance of any escort requirements. If the time shifts, the program manager shall be notified no later than 24 hours in advance.
File details come from the government source that posted it. Updated .