6. AF Form 3065 Progress Report.pdf
PDF 34 KB Posted
- Attached to
- Repair BPC Gym Federal contract opportunity
- Solicitation number
- FA5702-21-R-0005
About this file
This document contains a progress report template for federal contractors and a solicitation for repair work at a gym on Al Udeid Air Base in Qatar.
The progress report template collects information on contract details like the contractor, reporting period, project and contract numbers, and completion date. It includes a table to report the percentage of total work completed for each line item work element in the current and cumulative periods. The contractor and contracting officer must certify completion percentages.
The solicitation seeks proposals to repair the Base Physical Conditioning (BPC) Gym at Al Udeid Air Base in Qatar for the Department of the Air Force Air Combat Command. Proposals are due on July 8, 2021 at 1:00 PM local time and must follow the instructions in Sections L and M.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question and Answers.pdf | ||
| Solicitation Amendment FA570221R00050002 SF 30.pdf | ||
| Solicitation Amendment FA570221R00050001 SF 30.pdf | ||
| 3. AF Form 3000 Material Submittal.pdf | ||
| 8. Past Performance Questionnaire.docx | DOCX document | |
| 11. 20-0033 LD Construction (signed).pdf | ||
| 9. Base Access Information.pdf | ||
| 10. 20-0033 LD Design (signed).pdf | ||
| Solicitation - FA570221R0005.pdf | ||
| 1. 20-0033 Repair BPC Gym (B10550) SOW.pdf | ||
| 2. 20-0033 REPAIR BPC GYM (B10550) V6.pdf | ||
| 4. AF Form 66 Schedule of Material Submittals.xls | XLS spreadsheet | |
| 5. AF Form 3064 Progress Schedule.xlsx | XLSX spreadsheet | |
| 7. Construction Cost Estimate Breakdown.xls | XLS spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB NO. 0704-0188CONTRACT PROGRESS REPORT
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO : SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060.
CONTRACTOR ADDRESS
REPORT NO. PERIOD COVERED
FROM:
PROJECT NO. CONTRACT NO. COMPLETION DATE
TO:
LINE
NO.
% OF
TOTAL JOB
% COMPLETED
THIS PERIOD
% COMPLETED
CUMULATIVE
WORK ELEMENT
TOTAL
REMARKS
At the Contracting Officer's discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR
CONTRACTOR BASE CIVIL ENGINEER
TYPE OR PRINT NAME AND TITLE SIGNATURE DATE
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLE SIGNATURE DATE
AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.
| CONTRACTOR: |
| ADDRESS: |
| REPORT NO: |
| PERIOD COVERED FROM TO: |
| PROJECT NO: |
| CONTRACT NO: |
| COMPLETION DATE: |
| LINE NORow1: |
| WORK ELEMENTRow1: |
| OF TOTAL JOBRow1: |
| COMPLETED THIS PERIODRow1: |
| COMPLETED CUMULATIVERow1: |
| LINE NORow2: |
| WORK ELEMENTRow2: |
| OF TOTAL JOBRow2: |
| COMPLETED THIS PERIODRow2: |
| COMPLETED CUMULATIVERow2: |
| LINE NORow3: |
| WORK ELEMENTRow3: |
| OF TOTAL JOBRow3: |
| COMPLETED THIS PERIODRow3: |
| COMPLETED CUMULATIVERow3: |
| LINE NORow4: |
| WORK ELEMENTRow4: |
| OF TOTAL JOBRow4: |
| COMPLETED THIS PERIODRow4: |
| COMPLETED CUMULATIVERow4: |
| LINE NORow5: |
| WORK ELEMENTRow5: |
| OF TOTAL JOBRow5: |
| COMPLETED THIS PERIODRow5: |
| COMPLETED CUMULATIVERow5: |
| LINE NORow6: |
| WORK ELEMENTRow6: |
| OF TOTAL JOBRow6: |
| COMPLETED THIS PERIODRow6: |
| COMPLETED CUMULATIVERow6: |
| LINE NORow7: |
| WORK ELEMENTRow7: |
| OF TOTAL JOBRow7: |
| COMPLETED THIS PERIODRow7: |
| COMPLETED CUMULATIVERow7: |
| LINE NORow8: |
| WORK ELEMENTRow8: |
| OF TOTAL JOBRow8: |
| COMPLETED THIS PERIODRow8: |
| COMPLETED CUMULATIVERow8: |
| LINE NORow9: |
| WORK ELEMENTRow9: |
| OF TOTAL JOBRow9: |
| COMPLETED THIS PERIODRow9: |
| COMPLETED CUMULATIVERow9: |
| LINE NORow10: |
| WORK ELEMENTRow10: |
| OF TOTAL JOBRow10: |
| COMPLETED THIS PERIODRow10: |
| COMPLETED CUMULATIVERow10: |
| LINE NORow11: |
| WORK ELEMENTRow11: |
| OF TOTAL JOBRow11: |
| COMPLETED THIS PERIODRow11: |
| COMPLETED CUMULATIVERow11: |
| LINE NORow12: |
| WORK ELEMENTRow12: |
| OF TOTAL JOBRow12: |
| COMPLETED THIS PERIODRow12: |
| COMPLETED CUMULATIVERow12: |
| LINE NORow13: |
| WORK ELEMENTRow13: |
| OF TOTAL JOBRow13: |
| COMPLETED THIS PERIODRow13: |
| COMPLETED CUMULATIVERow13: |
| LINE NORow14: |
| WORK ELEMENTRow14: |
| OF TOTAL JOBRow14: |
| COMPLETED THIS PERIODRow14: |
| COMPLETED CUMULATIVERow14: |
| LINE NORow15: |
| WORK ELEMENTRow15: |
| OF TOTAL JOBRow15: |
| COMPLETED THIS PERIODRow15: |
| COMPLETED CUMULATIVERow15: |
| OF TOTAL JOBTOTAL: |
| COMPLETED THIS PERIODTOTAL: |
| COMPLETED CUMULATIVETOTAL: |
| REMARKS: |
| TYPE OR PRINT NAME AND TITLE: |
| DATE: |
| TYPE OR PRINT NAME AND TITLE_2: |
| DATE_2: |
| BASE CIVIL ENGINEER: Off |
| Contractor: Off |