31 05 19.13 - Geotextiles For Earthwork.pdf

PDF 310 KB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This is a technical specification section for geotextiles for earthwork, prepared by Herbert, Rowland & Grubic, Inc. for the Biosolids Project 011139.0465 owned by Ephrata Borough Authority in Pennsylvania. The specification covers three primary product categories: subsurface drainage geotextile (TenCate Geosynthetics Mirafi FW402 or approved equal), sediment control geotextile materials (TenCate Geosynthetics Mirafi HP570 or approved equal), and nonwoven geotextile materials (TenCate Geosynthetics Mirafi S1200 or approved equal), along with associated accessories including sewing thread, securing pins, and wire staples. The specification requires compliance with Pennsylvania Department of Transportation and Department of Environmental Protection standards, AASHTO M288, and multiple ASTM International testing standards. Manufacturers and installers must have a minimum of three years' documented experience. Materials must be delivered in original manufacturer packaging, stored in clean and dry locations, and protected from moisture and dust. The specification mandates that no payment will be made for materials until approved Build-America, Buy-America Act (BABA) certification is received.

The specification establishes detailed performance criteria for each geotextile type, including tensile strength, elongation, burst strength, CBR puncture resistance, UV resistance, apparent opening size, permittivity, and flow rate requirements. Installation procedures specify minimum overlap requirements of 18 inches for unseamed joints and 12 inches for seamed joints, with securement pin spacing varying from 24 inches on steeper slopes to 5 feet on flatter slopes. Damaged geotextiles must be repaired with patches extending minimum 12 inches beyond damaged areas, with complete removal and replacement required for unrepairable materials. Fill placement restrictions include a maximum drop height of 3 feet and prohibition on equipment operation directly over geotextiles. Materials must not remain uncovered for more than 14 days after installation, and adequate ballast must be provided to prevent wind uplift.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 05 19.13 – GEOTEXTILES FOR EARTHWORK

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 1 011139.0465

SECTION 31 05 19.13 - GEOTEXTILES FOR EARTHWORK

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Turf reinforcement mats (TRMs).

2. Nonwoven geotextile material.

B. Related Requirements:

1. Section 31 05 16 - Aggregates for Earthwork.

2. Section 31 22 13 - Rough Grading.

3. Section 31 23 23 – Fill.

4. Section 31 25 00 – Erosion and Sedimentation Controls

5. Section 32 91 13 – Soil Preparations.

C. Refer to the General Conditions and noted Supplemental Conditions for Build-America, Buy-America Act (BABA) requirements. No payment will be made for materials until approved BABA certification is received as required.

1.2 REFERENCE STANDARDS

A. American Association of State Highway and Transportation Officials:

1. AASHTO M288 - Standard Specification for Geotextile Specification for Highway

Applications.

B. ASTM International:

1. ASTM D3786/D3786M - Standard Test Method for Bursting Strength of Textile

Fabrics-Diaphragm Bursting Strength Tester Method

2. ASTM D4355/D4355M - Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture and Heat in a Xenon Arc Type Apparatus.

3. ASTM D4491/D4491M - Standard Test Methods for Water Permeability of

Geotextiles by Permittivity.

4. ASTM D4533/D4533M - Standard Test Method for Trapezoid Tearing Strength of

Geotextiles.

5. ASTM D4632/D4632M - Standard Test Method for Grab Breaking Load and

Elongation of Geotextiles.

6. ASTM D4751 - Standard Test Method for Determining Apparent Opening Size of a Geotextile.

7. ASTM D4833/D4833M - Standard Test Method for Index Puncture Resistance of

Geomembranes and Related Products.

8. ASTM D4873 - Standard Guide for Identification, Storage, and Handling of

Geosynthetic Rolls and Samples.

9. ASTM D4884/D4844M - Standard Test Method for Strength of Sewn or Bonded

Seams of Geotextiles.

10. ASTM D4886 - Standard Test Method for Abrasion Resistance of Geotextiles (Sand

Paper/Sliding Block Method).

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 2 011139.0465

11. ASTM D6524 - Standard Test Method for Measuring the Resiliency of Turf Reinforcement Mats (TRMs).

12. ASTM D6525/D6525M - Standard Test Method for Measuring Nominal Thickness of Rolled Erosion Control Products.

13. ASTM D6566 - Standard Test Method for Measuring Mass per Unit Area of Turf Reinforcement Mats.

14. ASTM D6567 - Standard Test Method for Measuring the Light Penetration of a Turf Reinforcement Mat (TRM).

15. ASTM D6575 - Standard Test Method for Determining Stiffness of Geosynthetics Used as Turf Reinforcement Mats (TRMs).

16. ASTM D6818 - Standard Test Method for Ultimate Tensile Properties of Rolled Erosion Control Products.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer information including tensile strength, elongation, thickness, UV resistance, and other material specifications.

C. Shop Drawings: Indicate fabric layout, seam locations, and overlap details in installation drawings.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.

F. Source Quality-Control Submittals: Indicate results of factory tests and inspections.

G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

H. Qualifications Statements:

1. Submit qualifications for manufacturer and installer.

2. Submit manufacturer's approval of installer.

1.4 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of geotextile material, including placement depth.

1.5 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 73 00 - Execution Requirements: Requirements for maintenance materials.

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 3 011139.0465

1.6 QUALITY ASSURANCE

A. Perform Work according to Pennsylvania Department of Transportation and Department of Environmental Protection standards.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Comply with ASTM D4873.

D. Store materials according to manufacturer instructions.

E. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

PART 2 - PRODUCTS

2.1 SUBSURFACE DRAINAGE GEOTEXTILE

A. Manufacturers:

1. TenCate Geosynthetics - Mirafi FW402.

2. Or approved equal.

3. Substitutions: As specified in Section 01 60 00 - Product Requirements.

B. Description:

1. Non-biodegradable, UV-resistant, woven geotextile fabric.

2. Material: Polypropylene.

3. Calendar such that yarns will retain relative positions.

C. Performance and Design Criteria:

1. Comply with AASHTO M288.

2. Mass per Unit Area:

a. 5.6 oz./sq. yd.

b. Comply with ASTM D6566.

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 4 011139.0465

3. Thickness:

a. 24 mils.

b. Comply with ASTM D6525/D6525M.

4. Tensile Strength (Grab):

a. 2,400 by 1,680 lbf/ft.

b. Comply with ASTM D4595.

5. Maximum Elongation:

a. 24 percent.

b. Comply with ASTM D4632.

6. Burst Strength:

a. 189 psi.

b. Comply with ASTM D3786.

7. CBR Puncture:

a. 675 lb.

b. Comply with ASTM D6241.

8. UV Resistance at 5000 Hours:

a. Strength Retention: 90 percent.

b. Comply with ASTM D4355/D4355M.

9. Apparent Opening Size:

a. 40 US Std Seive.

b. Comply with ASTM D4751.

10. Permittivity

a. 2.1 sec-1

b. Comply with ASTM D4491.

11. Flow Rate

a. 145 gal/min/sq. ft.

b. Comply with ASTM D4491.

2.2 SEDIMENT CONTROL GEOTEXTILE MATERIALS

A. Manufacturers:

1. TenCate Geosynthetics - Mirafi HP570.

2. Or approved equal.

3. Substitutions: As specified in Section 01 60 00 - Product Requirements.

B. Description:

1. Non-biodegradable, UV-resistant, woven geotextile fabric.

2. Material: Polypropylene.

3. Calendar such that yarns will retain relative positions.

C. Performance and Design Criteria:

1. Comply with AASHTO M288.

2. Tensile Strength (Grab):

a. 4,800 lbf/ft.

b. Comply with ASTM D4595.

3. Maximum Elongation:

a. 20 percent.

b. Comply with ASTM D4632.

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 5 011139.0465

4. UV Resistance at 500 Hours:

a. Strength Retention: 80 percent.

b. Comply with ASTM D4355/D4355M.

5. Apparent Opening Size:

a. 33330 US Std Seive.

b. Comply with ASTM D4751.

6. Permittivity

a. 0.4 sec-1

b. Comply with ASTM D4491.

7. Flow Rate

a. 30 gal/min/sq. ft.

b. Comply with ASTM D4491.

2.3 NONWOVEN GEOTEXTILE MATERIALS

A. Manufacturers:

1. TenCate Geosynthetics - Mirafi S1200.

2. Or approved equal.

3. Substitutions: As specified in Section 01 60 00 - Product Requirements.

B. Description:

1. Non-biodegradable, UV-resistant, nonwoven geotextile fabric.

2. Material: Polypropylene.

3. Edges: Selvaged or finished to prevent separation of outer material.

4. Calendar such that yarns will retain relative positions.

C. Performance and Design Criteria:

1. Minimum Unseamed Sheet Width: 15 feet.

2. Nominal Weight: 12 oz./sq. yd.

3. Minimum Sheet Thickness: 130 mils.

4. Apparent Opening Size:

a. No. 100 to No. 140 U.S. standard sieve size.

b. Comply with ASTM D4751.

5. Water Permittivity: 0.9 per second, minimum average roll value.

6. Vertical Water Flow Rate:

a. 65 gpm/sq. ft., minimum average roll value.

b. Comply with ASTM D4491/D4491M.

7. Wide-Width Strip Tensile Strength:

a. 310 lbf, minimum average roll value.

b. Comply with ASTM D4632/D4632M.

8. Elongation:

a. 50 percent, minimum average roll value.

b. Comply with ASTM D4632/D4632M.

9. Trapezoidal Tear Strength:

a. 120 lbf, minimum average roll value.

b. Comply with ASTM D4533/D4533M.

10. CBR Puncture Strength:

a. 900 lb, minimum average roll value.

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 6 011139.0465

b. Comply with ASTM D6241.

11. UV Resistance at 500 Hours:

a. Strength Retention: 80 percent.

b. Comply with ASTM D4355/D4355M.

2.4 ACCESSORIES

A. Sewing Thread:

1. Material: Polypropylene Polyester or Kevlar.

2. Durability: Equal to or greater than durability of geotextile.

B. Securing Pins:

1. Material: Steel rods or bars.

2. Diameter: 3/16 inch.

3. Minimum Length: 12 inches.

4. Washers:

a. Material: Steel.

b. Outside Diameter: Minimum 1-1/2 inches.

c. Inside Diameter: 1/4 inch.

d. Thickness: 1/8 inch.

C. Wire Staples:

1. Material: Steel.

2. Minimum Size: 10 gage.

3. Minimum Length: 6 inches.

2.5 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.

B. Provide shop inspection and testing of completed assembly.

C. Certificate of Compliance:

1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.

2. Specified shop tests are not required for Work performed by approved manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that underlying surface is smooth and free of ruts or protrusions that could damage geotextile material.

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 7 011139.0465

3.2 PREPARATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.

B. Subgrade Material and Compaction Requirements: As specified in Section 31 23 16.13 - Trenching or 31 23 23 - Fill.

3.3 INSTALLATION

A. Geotextile Material:

1. Lay and maintain smooth and free of tensile stresses, folds, wrinkles, or creases.

2. Ensure that material is in direct contact with subgrade.

3. Orientate with long dimension of each sheet transverse to direction of slope.

4. Minimum Unseamed Joints Overlap: 18 inches.

B. Securement Pins:

1. Insert through geotextile midway between edges of overlaps and minimum 6 inches from free edges.

2. Minimum Spacing:

a. Slopes Steeper than 3 Horizontal on 1 Vertical: 24 inches o.c.

b. Slopes 3 Horizontal on 1 Vertical to 4 Horizontal on 1 Vertical: 3 feet o.c.

c. Slopes Flatter than 4 Horizontal on 1 Vertical: 5 feet o.c.

3. Ensure that washer bears against geotextile.

C. Seams:

1. Minimum Seamed Joints Overlap: 12 inches at longitudinal and transverse joints.

2. Seams across Slope: Lap upper panel over lower panel.

3. Sewn Seams:

a. Continuously sew seams at locations indicated on Drawings.

b. Stitch Type: As recommended by geotextile manufacturer.

c. Tie off thread at the end of each seam to prevent unraveling.

4. Thermal Seams:

a. As recommended by geotextile manufacturer.

b. Comply with ASTM D4886.

D. Penetrations: As indicated on Drawings.

E. Repairing Damaged Geotextiles:

1. Repair torn or damaged geotextile by placing patch of same type of geotextile over damaged area minimum of 12 inches beyond edge of damaged area, and fasten as recommended by geotextile manufacturer.

2. Remove and replace geotextile rolls which cannot be repaired.

F. Fill and Cover:

1. Place fill to prevent tensile stress or wrinkles in geotextile.

2. Place fill from bottom of side-slopes upward.

3. Do not drop fill from height greater than 3 feet.

Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 8 011139.0465

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

3.5 PROTECTION

A. Section 01 73 00 - Execution Requirements: Requirements for protecting finished Work.

B. Ballast: Adequate to prevent uplift of material by wind.

C. UV Exposure: Do not leave material uncovered for more than 14 days after installation.

D. Do not use staples or pins to hold geotextiles in place where located adjacent to other geosynthetic layers that could be damaged.

E. Do not operate equipment directly on top of geotextile.

END OF SECTION

PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Turf reinforcement mats (TRMs).
2. Nonwoven geotextile material.
B. Related Requirements:
1. Section 31 05 16 - Aggregates for Earthwork.
2. Section 31 22 13 - Rough Grading.
3. Section 31 23 23 – Fill.
4. Section 31 25 00 – Erosion and Sedimentation Controls
5. Section 32 91 13 – Soil Preparations.

C. Refer to the General Conditions and noted Supplemental Conditions for Build-America, Buy-America Act (BABA) requirements. No payment will be made for materials until approved BABA certification is received as required.

1.2 REFERENCE STANDARDS
A. American Association of State Highway and Transportation Officials:
1. AASHTO M288 - Standard Specification for Geotextile Specification for Highway Applications.
B. ASTM International:
1. ASTM D3786/D3786M - Standard Test Method for Bursting Strength of Textile Fabrics-Diaphragm Bursting Strength Tester Method
2. ASTM D4355/D4355M - Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture and Heat in a Xenon Arc Type Apparatus.
3. ASTM D4491/D4491M - Standard Test Methods for Water Permeability of Geotextiles by Permittivity.
4. ASTM D4533/D4533M - Standard Test Method for Trapezoid Tearing Strength of Geotextiles.
5. ASTM D4632/D4632M - Standard Test Method for Grab Breaking Load and Elongation of Geotextiles.
6. ASTM D4751 - Standard Test Method for Determining Apparent Opening Size of a Geotextile.
7. ASTM D4833/D4833M - Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products.
8. ASTM D4873 - Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples.
9. ASTM D4884/D4844M - Standard Test Method for Strength of Sewn or Bonded Seams of Geotextiles.
10. ASTM D4886 - Standard Test Method for Abrasion Resistance of Geotextiles (Sand Paper/Sliding Block Method).
11. ASTM D6524 - Standard Test Method for Measuring the Resiliency of Turf Reinforcement Mats (TRMs).
12. ASTM D6525/D6525M - Standard Test Method for Measuring Nominal Thickness of Rolled Erosion Control Products.
13. ASTM D6566 - Standard Test Method for Measuring Mass per Unit Area of Turf Reinforcement Mats.
14. ASTM D6567 - Standard Test Method for Measuring the Light Penetration of a Turf Reinforcement Mat (TRM).
15. ASTM D6575 - Standard Test Method for Determining Stiffness of Geosynthetics Used as Turf Reinforcement Mats (TRMs).
16. ASTM D6818 - Standard Test Method for Ultimate Tensile Properties of Rolled Erosion Control Products.
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer information including tensile strength, elongation, thickness, UV resistance, and other material specifications.
C. Shop Drawings: Indicate fabric layout, seam locations, and overlap details in installation drawings.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.
F. Source Quality-Control Submittals: Indicate results of factory tests and inspections.
G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
H. Qualifications Statements:
1. Submit qualifications for manufacturer and installer.
2. Submit manufacturer's approval of installer.
1.4 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record actual locations of geotextile material, including placement depth.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Section 01 73 00 - Execution Requirements: Requirements for maintenance materials.
1.6 QUALITY ASSURANCE
A. Perform Work according to Pennsylvania Department of Transportation and Department of Environmental Protection standards.
1.7 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Comply with ASTM D4873.
D. Store materials according to manufacturer instructions.
E. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
PART 2 - PRODUCTS
2.1 SUBSURFACE DRAINAGE GEOTEXTILE
A. Manufacturers:
1. TenCate Geosynthetics - Mirafi FW402.
2. Or approved equal.
3. Substitutions: As specified in Section 01 60 00 - Product Requirements.
B. Description:
1. Non-biodegradable, UV-resistant, woven geotextile fabric.
2. Material: Polypropylene.
3. Calendar such that yarns will retain relative positions.
C. Performance and Design Criteria:
1. Comply with AASHTO M288.
2. Mass per Unit Area:
a. 5.6 oz./sq. yd.
b. Comply with ASTM D6566.
3. Thickness:
a. 24 mils.
b. Comply with ASTM D6525/D6525M.
4. Tensile Strength (Grab):
a. 2,400 by 1,680 lbf/ft.
b. Comply with ASTM D4595.
5. Maximum Elongation:
a. 24 percent.
b. Comply with ASTM D4632.
6. Burst Strength:
a. 189 psi.
b. Comply with ASTM D3786.
7. CBR Puncture:
a. 675 lb.
b. Comply with ASTM D6241.
8. UV Resistance at 5000 Hours:
a. Strength Retention: 90 percent.
b. Comply with ASTM D4355/D4355M.
9. Apparent Opening Size:
a. 40 US Std Seive.
b. Comply with ASTM D4751.
10. Permittivity
a. 2.1 sec-1
b. Comply with ASTM D4491.
11. Flow Rate
a. 145 gal/min/sq. ft.
b. Comply with ASTM D4491.
2.2 SEDIMENT CONTROL GEOTEXTILE MATERIALS
A. Manufacturers:
1. TenCate Geosynthetics - Mirafi HP570.
2. Or approved equal.
3. Substitutions: As specified in Section 01 60 00 - Product Requirements.
B. Description:
1. Non-biodegradable, UV-resistant, woven geotextile fabric.
2. Material: Polypropylene.
3. Calendar such that yarns will retain relative positions.
C. Performance and Design Criteria:
1. Comply with AASHTO M288.
2. Tensile Strength (Grab):
a. 4,800 lbf/ft.
b. Comply with ASTM D4595.
3. Maximum Elongation:
a. 20 percent.
b. Comply with ASTM D4632.
4. UV Resistance at 500 Hours:
a. Strength Retention: 80 percent.
b. Comply with ASTM D4355/D4355M.
5. Apparent Opening Size:
a. 33330 US Std Seive.
b. Comply with ASTM D4751.
6. Permittivity
a. 0.4 sec-1
b. Comply with ASTM D4491.
7. Flow Rate
a. 30 gal/min/sq. ft.
b. Comply with ASTM D4491.
2.3 NONWOVEN GEOTEXTILE MATERIALS
A. Manufacturers:
1. TenCate Geosynthetics - Mirafi S1200.
2. Or approved equal.
3. Substitutions: As specified in Section 01 60 00 - Product Requirements.
B. Description:
1. Non-biodegradable, UV-resistant, nonwoven geotextile fabric.
2. Material: Polypropylene.
3. Edges: Selvaged or finished to prevent separation of outer material.
4. Calendar such that yarns will retain relative positions.
C. Performance and Design Criteria:
1. Minimum Unseamed Sheet Width: 15 feet.
2. Nominal Weight: 12 oz./sq. yd.
3. Minimum Sheet Thickness: 130 mils.
4. Apparent Opening Size:
a. No. 100 to No. 140 U.S. standard sieve size.
b. Comply with ASTM D4751.
5. Water Permittivity: 0.9 per second, minimum average roll value.
6. Vertical Water Flow Rate:
a. 65 gpm/sq. ft., minimum average roll value.
b. Comply with ASTM D4491/D4491M.
7. Wide-Width Strip Tensile Strength:
a. 310 lbf, minimum average roll value.
b. Comply with ASTM D4632/D4632M.
8. Elongation:
a. 50 percent, minimum average roll value.
b. Comply with ASTM D4632/D4632M.
9. Trapezoidal Tear Strength:
a. 120 lbf, minimum average roll value.
b. Comply with ASTM D4533/D4533M.
10. CBR Puncture Strength:
a. 900 lb, minimum average roll value.
b. Comply with ASTM D6241.
11. UV Resistance at 500 Hours:
a. Strength Retention: 80 percent.
b. Comply with ASTM D4355/D4355M.
2.4 ACCESSORIES
A. Sewing Thread:
1. Material: Polypropylene Polyester or Kevlar.
2. Durability: Equal to or greater than durability of geotextile.
B. Securing Pins:
1. Material: Steel rods or bars.
2. Diameter: 3/16 inch.
3. Minimum Length: 12 inches.
4. Washers:
a. Material: Steel.
b. Outside Diameter: Minimum 1-1/2 inches.
c. Inside Diameter: 1/4 inch.
d. Thickness: 1/8 inch.
C. Wire Staples:
1. Material: Steel.
2. Minimum Size: 10 gage.
3. Minimum Length: 6 inches.
2.5 SOURCE QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.
B. Provide shop inspection and testing of completed assembly.
C. Certificate of Compliance:
1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify that underlying surface is smooth and free of ruts or protrusions that could damage geotextile material.
3.2 PREPARATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.
B. Subgrade Material and Compaction Requirements: As specified in Section 31 23 16.13 - Trenching or 31 23 23 - Fill.
3.3 INSTALLATION
A. Geotextile Material:
1. Lay and maintain smooth and free of tensile stresses, folds, wrinkles, or creases.
2. Ensure that material is in direct contact with subgrade.
3. Orientate with long dimension of each sheet transverse to direction of slope.
4. Minimum Unseamed Joints Overlap: 18 inches.
B. Securement Pins:
1. Insert through geotextile midway between edges of overlaps and minimum 6 inches from free edges.
2. Minimum Spacing:
a. Slopes Steeper than 3 Horizontal on 1 Vertical: 24 inches o.c.
b. Slopes 3 Horizontal on 1 Vertical to 4 Horizontal on 1 Vertical: 3 feet o.c.
c. Slopes Flatter than 4 Horizontal on 1 Vertical: 5 feet o.c.

3. Ensure that washer bears against geotextile.

C. Seams:
1. Minimum Seamed Joints Overlap: 12 inches at longitudinal and transverse joints.
2. Seams across Slope: Lap upper panel over lower panel.
3. Sewn Seams:
a. Continuously sew seams at locations indicated on Drawings.
b. Stitch Type: As recommended by geotextile manufacturer.
c. Tie off thread at the end of each seam to prevent unraveling.
4. Thermal Seams:
a. As recommended by geotextile manufacturer.
b. Comply with ASTM D4886.
D. Penetrations: As indicated on Drawings.
E. Repairing Damaged Geotextiles:
1. Repair torn or damaged geotextile by placing patch of same type of geotextile over damaged area minimum of 12 inches beyond edge of damaged area, and fasten as recommended by geotextile manufacturer.
2. Remove and replace geotextile rolls which cannot be repaired.
F. Fill and Cover:
1. Place fill to prevent tensile stress or wrinkles in geotextile.
2. Place fill from bottom of side-slopes upward.
3. Do not drop fill from height greater than 3 feet.
3.4 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
3.5 PROTECTION
A. Section 01 73 00 - Execution Requirements: Requirements for protecting finished Work.
B. Ballast: Adequate to prevent uplift of material by wind.
C. UV Exposure: Do not leave material uncovered for more than 14 days after installation.
D. Do not use staples or pins to hold geotextiles in place where located adjacent to other geosynthetic layers that could be damaged.
E. Do not operate equipment directly on top of geotextile.

File details come from the government source that posted it. Updated .