2. - Construction AF Form 66.pdf

PDF 145 KB Posted

Attached to
Replace Swamp Cooler B5045 Federal contract opportunity
Solicitation number
FA487724R0012
Issued by
Department of the Air Force Air Combat Command

About this file

This document appears to be an Air Force Form 66, which details the required attachments and documentation for a construction project. The key details are as follows:

The required attachments include an AF Form 103, affidavits, certifications, hazardous material usage reports, air quality and AZPDES permits, asbestos and lead-based paint permits and abatement plans, construction and demolition debris diversion plan, and asbestos manifests. The number of copies required and due dates for each attachment are specified. This documentation must be provided at various project milestones such as pre-construction, notice to proceed, construction start, construction end, and project finalization.

The related federal contract opportunity is for the repair and replacement of a swamp cooler on Building 5045 at Davis-Monthan AFB. The project has an estimated value between $100,000 and $250,000 and is set aside for Woman-Owned Small Businesses under NAICS code 238220. Key dates include the EAL submission deadline of April 24, 2024, a site visit on May 2, 2024, RFI due date of May 8, 2024, and proposal due date of May 24, 2024.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. OF COPIES REQUIRED

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

AF Form 103 Job Order Sec 01010, Para 1.3c 1

Affidavits Sec 01010, Para 1.6a 1

Certifications Sec 01010, Para 1.6b 1

Hazardous Material Usage Sec 01010, Para 2.5c Env Cont Guide Sec 3.3 Hazardous Material

HAZMAT Usage Reports Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage

Air Quality Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Air Quality

AZPDES General Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 SWPP

Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Asbestos

LBP Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Lead-Based Paint

Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 Asbestos

Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 C&D Plan

Asbestos Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Asbestos Removal

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

7 Days after Reciept of Permit

(1st of the month for projects >60days) (End of project for projects <60 days)

2 Days Prior to Construction

7 Days after Reciept of Permit

7 Days after Reciept of Permit

7 Days after Reciept of Asbestos Demolition Permit

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Replace Swamp Cooler Bldg 5045FBNV23-0047

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

7 Days After Reciept of Manifest

AF FORM 66 (Computer Generated) PAGE 1 of 3

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Replace Swamp Cooler Bldg 5045FBNV23-0047

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Recycling Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables

Non-Hazardous Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables

18 Record As-Builts Sec 01010, Para 3.2.2.a

19 DD Form 1354 Sec 01010, Para 3.2.2.c.1

20 DD Form 1354 Checklist Sec 01010, Para 3.2.2.c.2

26 Warranty/Guarantee Items Sec 01010, Para 3.2.2.c.3

21 O&M Manual Sec 01010, Para 3.2.2.d 3

Schedule Sec 01011, Para 1.5.1 1

Design Charrette Submittal Sec 01011, Para 2.10.1 1

24 65% Design Submittal Sec 01011, Para 2.10.3 1

25 95% Design Submittal Sec 01011, Para 2.10.4 1

26 100% Design Submittal Sec 01011, Para 2.10.5 1

Soil Compaction Test Results for Utilities and Facilities Sec 01011, Para 3.3

3 days after Disposal

Coordinated Prior to Removal from Installation

3 Days after Disposal (1st of the month for projects >60days) (End of project for projects <60 days)(1st of the month for projects >60days) (End of project for projects <60 days)

1 Package-Provide Copies as indicated 1 Package-Provide Copies as indicated 1 Package-Provide Copies as indicated 1 Package-Provide Copies as indicated

AF FORM 66 (Computer Generated) PAGE 2 of 3

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Replace Swamp Cooler Bldg 5045FBNV23-0047

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

28 Asbestos Survey Env Cont Guide Sec 3.3 Asbestos

Lead-Based Paint Survey Env Cont Guide Sec 3.3 Lead-Based Paint

Outdoor Painting Exemption Env Cont Guide Sec 3.3 Minimize Organics

Recovered Materials Certification Env Cont Guide Sec 3.5 Recovered Materials

Contractor to add Submittals as required or requested.

7 Days after Construction Complete (Only for Contracts >$100,000)

(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885) for surveys already conducted (7 Days after Reciept of Survey) Contact DM Env Ofice (x4885)

7 Days after Reciept of Excemption

AF FORM 66 (Computer Generated) PAGE 3 of 3