2. - Construction AF Form 66.pdf
PDF 145 KB Posted
- Attached to
- Replace Swamp Cooler B5045 Federal contract opportunity
- Solicitation number
- FA487724R0012
About this file
This document appears to be an Air Force Form 66, which details the required attachments and documentation for a construction project. The key details are as follows:
The required attachments include an AF Form 103, affidavits, certifications, hazardous material usage reports, air quality and AZPDES permits, asbestos and lead-based paint permits and abatement plans, construction and demolition debris diversion plan, and asbestos manifests. The number of copies required and due dates for each attachment are specified. This documentation must be provided at various project milestones such as pre-construction, notice to proceed, construction start, construction end, and project finalization.
The related federal contract opportunity is for the repair and replacement of a swamp cooler on Building 5045 at Davis-Monthan AFB. The project has an estimated value between $100,000 and $250,000 and is set aside for Woman-Owned Small Businesses under NAICS code 238220. Key dates include the EAL submission deadline of April 24, 2024, a site visit on May 2, 2024, RFI due date of May 8, 2024, and proposal due date of May 24, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA487724R00120004 SF 30.pdf | ||
| 14. E-603-ELECTRICAL PANEL.pdf | ||
| 12. E-601-ELECTRICAL ONE-LI.pdf | ||
| 16. Updated RFI Guidance.pdf | ||
| Solicitation Amendment FA487724R00120003 SF 30.pdf | ||
| 15. E-604-ELECTRICAL PANEL.pdf | ||
| 13. E-602-ELECTRICAL PANEL.pdf | ||
| 10. 05045-018-010.PDF | ||
| 11. 05045-019-002.PDF | ||
| 8. Swamp Cooler - Q&A.pdf | ||
| Solicitation Amendment FA487724R00120002 SF 30.pdf | ||
| 9. Swamp Cooler - Sign In.pdf | ||
| 7. Wage Determination AZ20240040 4.19.2024.pdf | ||
| Solicitation Amendment FA487724R00120001 SF 30.pdf | ||
| 7. Wage Determination - AZ202400.pdf | ||
| 4. DMAFB Design Compatibility Guidelines 2017.pdf | ||
| 5. AF Form 3052-BLANK.xlsx | XLSX spreadsheet | |
| 1. FBNV230047 - SOW - Swamp Coolers.pdf | ||
| 6. Template of Contractor EAL.xlsx | XLSX spreadsheet | |
| 3. Contractor Environmental Guide (15 May 2019).pdf | ||
| Solicitation - FA487724R0012.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. OF COPIES REQUIRED
Awarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
AF Form 103 Job Order Sec 01010, Para 1.3c 1
Affidavits Sec 01010, Para 1.6a 1
Certifications Sec 01010, Para 1.6b 1
Hazardous Material Usage Sec 01010, Para 2.5c Env Cont Guide Sec 3.3 Hazardous Material
HAZMAT Usage Reports Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage
Air Quality Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Air Quality
AZPDES General Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 SWPP
Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Asbestos
LBP Removal/Demolition Activity Permit Sec 01010, Para 2.5d Env Cont Guide Sec 3.3 Lead-Based Paint
Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 Asbestos
Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.5e Env Cont Guide Sec 3.3 C&D Plan
Asbestos Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Asbestos Removal
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT TITLE: PROJECT NUMBER:
7 Days after Reciept of Permit
(1st of the month for projects >60days) (End of project for projects <60 days)
2 Days Prior to Construction
7 Days after Reciept of Permit
7 Days after Reciept of Permit
7 Days after Reciept of Asbestos Demolition Permit
REMARKS
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
C er tif ic at es
M an uf ac tu re r's In st ru ct io ns
M an uf ac tu re r's F ie ld
R ep or ts
O pe ra tio n an d
M ai nt en an ce
M an ua ls
C lo se ou t S ub m itt al
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Replace Swamp Cooler Bldg 5045FBNV23-0047
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
P re co ns tr uc tio n Su bm itt al s
S ho p
D ra w in gs
P ro du ct
D at a
S am pl es
D es ig n D at a
T es t R ep or ts
7 Days After Reciept of Manifest
AF FORM 66 (Computer Generated) PAGE 1 of 3
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT TITLE: PROJECT NUMBER:
REMARKS
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
C er tif ic at es
M an uf ac tu re r's In st ru ct io ns
M an uf ac tu re r's F ie ld
R ep or ts
O pe ra tio n an d
M ai nt en an ce
M an ua ls
C lo se ou t S ub m itt al
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Replace Swamp Cooler Bldg 5045FBNV23-0047
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
P re co ns tr uc tio n Su bm itt al s
S ho p
D ra w in gs
P ro du ct
D at a
S am pl es
D es ig n D at a
T es t R ep or ts
Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Recycling Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables
Non-Hazardous Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables
18 Record As-Builts Sec 01010, Para 3.2.2.a
19 DD Form 1354 Sec 01010, Para 3.2.2.c.1
20 DD Form 1354 Checklist Sec 01010, Para 3.2.2.c.2
26 Warranty/Guarantee Items Sec 01010, Para 3.2.2.c.3
21 O&M Manual Sec 01010, Para 3.2.2.d 3
Schedule Sec 01011, Para 1.5.1 1
Design Charrette Submittal Sec 01011, Para 2.10.1 1
24 65% Design Submittal Sec 01011, Para 2.10.3 1
25 95% Design Submittal Sec 01011, Para 2.10.4 1
26 100% Design Submittal Sec 01011, Para 2.10.5 1
Soil Compaction Test Results for Utilities and Facilities Sec 01011, Para 3.3
3 days after Disposal
Coordinated Prior to Removal from Installation
3 Days after Disposal (1st of the month for projects >60days) (End of project for projects <60 days)(1st of the month for projects >60days) (End of project for projects <60 days)
1 Package-Provide Copies as indicated 1 Package-Provide Copies as indicated 1 Package-Provide Copies as indicated 1 Package-Provide Copies as indicated
AF FORM 66 (Computer Generated) PAGE 2 of 3
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT TITLE: PROJECT NUMBER:
REMARKS
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
C er tif ic at es
M an uf ac tu re r's In st ru ct io ns
M an uf ac tu re r's F ie ld
R ep or ts
O pe ra tio n an d
M ai nt en an ce
M an ua ls
C lo se ou t S ub m itt al
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Replace Swamp Cooler Bldg 5045FBNV23-0047
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
P re co ns tr uc tio n Su bm itt al s
S ho p
D ra w in gs
P ro du ct
D at a
S am pl es
D es ig n D at a
T es t R ep or ts
28 Asbestos Survey Env Cont Guide Sec 3.3 Asbestos
Lead-Based Paint Survey Env Cont Guide Sec 3.3 Lead-Based Paint
Outdoor Painting Exemption Env Cont Guide Sec 3.3 Minimize Organics
Recovered Materials Certification Env Cont Guide Sec 3.5 Recovered Materials
Contractor to add Submittals as required or requested.
7 Days after Construction Complete (Only for Contracts >$100,000)
(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885) for surveys already conducted (7 Days after Reciept of Survey) Contact DM Env Ofice (x4885)
7 Days after Reciept of Excemption
AF FORM 66 (Computer Generated) PAGE 3 of 3
AF Form 66
File details come from the government source that posted it. Updated .