This document contains Updated RFI Guidance related to a federal contract opportunity. The key details are:
The federal contract opportunity is for the Repair/Replace Swamp Coolers B5045 project at Davis-Monthan AFB. It is a Woman-Owned Small Business Set-Aside with a NAICS code of 238220 and a size standard of $19 Million. The project magnitude is between $100,000 and $250,000. The RFI is due on 8 May 2024 at 4:00 pm Arizona Local Time, with RFI responses posted on 13 May 2024. Proposals are due on 24 May 2024 at 12:00 pm Arizona Local Time. A site visit is scheduled for 2 May 2024 at 9:00 am Arizona Local Time. The contractor shall provide all material and services to remove and replace one Swamp Cooler on Bldg 5045. No technical narrative is required at the time of bid submission. As-built drawings are available.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA487724R00120004 SF 30.pdf | ||
| 14. E-603-ELECTRICAL PANEL.pdf | ||
| 12. E-601-ELECTRICAL ONE-LI.pdf | ||
| 11. 05045-019-002.PDF | ||
| Solicitation Amendment FA487724R00120003 SF 30.pdf | ||
| 15. E-604-ELECTRICAL PANEL.pdf | ||
| 13. E-602-ELECTRICAL PANEL.pdf | ||
| 10. 05045-018-010.PDF | ||
| 8. Swamp Cooler - Q&A.pdf | ||
| Solicitation Amendment FA487724R00120002 SF 30.pdf | ||
| 9. Swamp Cooler - Sign In.pdf | ||
| Solicitation Amendment FA487724R00120001 SF 30.pdf | ||
| 7. Wage Determination AZ20240040 4.19.2024.pdf | ||
| 7. Wage Determination - AZ202400.pdf | ||
| 4. DMAFB Design Compatibility Guidelines 2017.pdf | ||
| 6. Template of Contractor EAL.xlsx | XLSX spreadsheet | |
| 3. Contractor Environmental Guide (15 May 2019).pdf | ||
| Solicitation - FA487724R0012.pdf | ||
| 5. AF Form 3052-BLANK.xlsx | XLSX spreadsheet | |
| 2. - Construction AF Form 66.pdf | ||
| 1. FBNV230047 - SOW - Swamp Coolers.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated RFI Guidance
34. Will the government require a technical narra�ve regarding this project scope from the bidding contractors at �me of bid submission? No, a technical narra�ve is not required.
35. Are there as-builts? See atachments 10-15.