This is an Operation and Maintenance Data specification document for the Biosolids Project 011139.0465, a construction project managed by Ephrata Borough Authority in Pennsylvania. The specification establishes comprehensive requirements for the preparation, submission, and delivery of operation and maintenance manuals and documentation upon project completion. The project involves coordination and interconnection of two new owner-procured biodryers, demolition and replacement of dewatered solids conveyor systems, wall demolition and replacement, indoor utility replacements, site piping replacement/relocation, a dumpster loading canopy, and associated electrical improvements. Bidding for two separate contracts—Contract No. EBA26-2 for General Construction and Contract No. EBA26-3 for Electrical Construction—will be received through PennBid until December 8, 2026 at 10:00 AM, with a pre-bid open house scheduled for November 18, 2026 from 8:00 AM to 10:00 AM. The contractor must submit three bound copies and electronic PDF files of final operation and maintenance manuals prior to system startup or commissioning, with all materials requiring Engineer approval before substantial completion.

The manuals must be bound in three D-ring binders with durable plastic covers and organized into three distinct parts: a directory containing contact information for the engineer, contractor, subcontractors, and equipment suppliers; operation and maintenance instructions arranged by system and subsystem with design criteria, equipment lists, parts lists, operating and maintenance instructions, finish care requirements, and safety precautions; and project documents including shop drawings, product data, air and water balance reports, certificates, and original warranties and bonds. The specification requires detailed operating procedures covering startup, break-in, routine operations, regulation and control, shutdown, seasonal variations, and electronic system sequences, along with comprehensive maintenance requirements including preventative maintenance guides, troubleshooting procedures, lubrication schedules, wiring diagrams, control diagrams, and spare parts lists with current pricing and recommended quantities for storage. The contractor is also responsible for furnishing service and maintenance of components at frequencies consistent with reliable operation, using original manufacturer parts, and obtaining prior written Owner consent before assigning or transferring any maintenance service to agents or subcontractors.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 78 23 - OPERATION AND MAINTENANCE DATA

Herbert, Rowland & Grubic, Inc. 01 78 23 - 1 011139.0465

SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA

PART 1 - GENERAL

1.1 SUMMARY

A. SECTION INCLUDES

1. Operation and maintenance data.

2. Maintenance service.

B. Related Sections:

1. Section 01 77 00 – Closeout Procedures: Project closeout requirements.

2. Section 01 78 39 - Project Record Documents: Record Drawings, record

Specifications, and record Product Data.

3. Section 01 91 13 - Commissioning: General commissioning requirements.

1.2 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Submit three bound copies and an electronic file of each final manual prior to start-up or commissioning of system or equipment. Final manuals must be approved by Engineer prior to the substantial completion.

1.3 OPERATION AND MAINTENANCE DATA

A. Submit in PDF composite electronic indexed file.

B. Submit data bound in 8-1/2 x 11-inch text pages, three D side ring binders with durable plastic covers.

C. Prepare binder cover with printed title "OPERATION AND MAINTENANCE INSTRUCTIONS," title of Project. Title shall also be printed on the binder spline.

D. Internally subdivide binder contents with permanent page dividers, logically organized as described below; with tab titling clearly printed under reinforced laminated plastic tabs.

E. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.

F. Contents: Prepare table of contents for each volume, with each product or system description identified, typed on white paper, in three parts as follows:

1. Part 1: Directory, listing names, addresses, and telephone numbers of Engineer, Contractor, Subcontractors, and major equipment suppliers.

2. Part 2: Operation and maintenance instructions, arranged by system and subdivided by subsystem. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Include the following:

a. Significant design criteria.

b. List of equipment.

Herbert, Rowland & Grubic, Inc. 01 78 23 - 2 011139.0465

c. Parts list for each component.

d. Operating instructions.

e. Maintenance instructions for equipment and systems.

f. Maintenance instructions for special finishes, including recommended cleaning methods and materials, and special precautions identifying detrimental agents.

g. Safety precautions to be taken when operating and maintaining or working near equipment.

3. Part 3: Project documents and certificates, including the following:

a. Shop Drawings and product data.

b. Air and water balance reports.

c. Certificates.

d. Originals of warranties and bonds.

1.4 MANUAL FOR OPERATION

A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:

1. System, subsystem, and equipment descriptions.

2. Performance and design criteria.

3. Operating standards.

4. Operating procedures.

5. Operating logs.

6. Wiring diagrams.

7. Controls – sequence of operations and diagrams.

8. Piped system diagrams.

9. Precautions against improper use.

10. License requirements including inspection and renewal dates.

B. Descriptions: Include the following:

1. Product name and model number.

2. Manufacturer's name.

3. Equipment identification with serial number of each component.

4. Equipment function.

5. Operating characteristics.

6. Limiting conditions.

7. Performance curves.

8. Engineering data and tests.

9. Complete nomenclature and number of replacement parts.

C. Operating Procedures: Include the following, as applicable:

1. Startup procedures.

2. Equipment or system break-in procedures.

3. Routine and normal operating instructions.

4. Regulation and control procedures.

5. Instructions on stopping.

6. Normal shutdown instructions.

7. Seasonal and weekend operating instructions.

8. Required sequences for electronic systems.

Herbert, Rowland & Grubic, Inc. 01 78 23 - 3 011139.0465

9. Special operating instructions and procedures.

1.5 MANUAL FOR MATERIALS AND FINISHES

A. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Engineer will review draft and return one copy with comments.

B. For equipment or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance.

C. Submit three sets of revised final volumes within ten days after final inspection.

D. Submit in PDF composite electronic indexed file of final manual within ten days after final inspection.

E. Building Products, Applied Materials, and Finishes: Include product data, with catalog number, size, composition, and color and texture designations. Include information for re-ordering custom-manufactured products.

F. Instructions for Care and Maintenance: Include manufacturer's recommendations for cleaning agents and methods, precautions against detrimental agents and methods, and recommended schedule for cleaning and maintenance.

G. Moisture Protection and Weather Exposed Products: Include product data listing applicable reference standards, chemical composition, and details of installation. Include recommendations for inspections, maintenance, and repair.

H. Additional Requirements: As specified in individual product Specification Sections.

I. Include listing in table of contents for design data, with tabbed fly sheet and space for insertion of data.

1.6 MANUAL FOR EQUIPMENT AND SYSTEMS

A. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Engineer will review draft and return one copy with comments.

B. For equipment, or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance.

C. Submit three sets of revised final volumes within ten days after final inspection.

D. Submit in PDF composite electronic indexed file of final manual within ten days after final inspection.

E. Each Item of Equipment and Each System: Include description of unit or system and component parts. Identify function, normal operating characteristics, and limiting conditions. Include performance curves, with engineering data and tests, and complete nomenclature and model number of replaceable parts.

F. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and

Herbert, Rowland & Grubic, Inc. 01 78 23 - 4 011139.0465 communications; by label machine.

G. Include color-coded wiring diagrams as installed.

H. Operating Procedures: Include startup, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shutdown, and emergency instructions. Include summer, winter, and special operating instructions.

I. Maintenance Requirements: Include routine procedures and guide for preventative maintenance and troubleshooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions.

J. Include servicing and lubrication schedule and list of lubricants required.

K. Include manufacturer's printed operation and maintenance instructions.

L. Include sequence of operation by controls manufacturer.

M. Include original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance.

N. Include control diagrams by controls manufacturer as installed.

O. Include Contractor's coordination drawings with color-coded piping diagrams as installed.

P. Include charts of valve tag numbers, with location and function of each valve, keyed to flow and control diagrams.

Q. Include list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage.

R. Include test and balancing reports as specified in Section 01 40 00 - Quality Requirements.

S. Additional Requirements: As specified in individual product Specification Sections.

T. Include listing in table of contents for design data with tabbed dividers and space for insertion of data.

1.7 MAINTENANCE SERVICE

A. Furnish service and maintenance of components indicated in Specification.

B. Examine system components at frequency consistent with reliable operation. Clean, adjust, and lubricate as required.

C. Include systematic examination, adjustment, and lubrication of components. Repair or replace parts whenever required. Use parts produced by manufacturer of original component.

D. Do not assign or transfer maintenance service to agent or Subcontractor without prior written consent of Owner.

Herbert, Rowland & Grubic, Inc. 01 78 23 - 5 011139.0465

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION – Not Used

END OF SECTION

PART 1 - GENERAL
1.1 SUMMARY
A. SECTION INCLUDES
1. Operation and maintenance data.
2. Maintenance service.
B. Related Sections:
1. Section 01 77 00 – Closeout Procedures: Project closeout requirements.
2. Section 01 78 39 - Project Record Documents: Record Drawings, record Specifications, and record Product Data.
3. Section 01 91 13 - Commissioning: General commissioning requirements.
1.2 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Submit three bound copies and an electronic file of each final manual prior to start-up or commissioning of system or equipment. Final manuals must be approved by Engineer prior to the substantial completion.
1.3 OPERATION AND MAINTENANCE DATA
A. Submit in PDF composite electronic indexed file.
B. Submit data bound in 8-1/2 x 11-inch text pages, three D side ring binders with durable plastic covers.
C. Prepare binder cover with printed title "OPERATION AND MAINTENANCE INSTRUCTIONS," title of Project. Title shall also be printed on the binder spline.
D. Internally subdivide binder contents with permanent page dividers, logically organized as described below; with tab titling clearly printed under reinforced laminated plastic tabs.
E. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.
F. Contents: Prepare table of contents for each volume, with each product or system description identified, typed on white paper, in three parts as follows:
1. Part 1: Directory, listing names, addresses, and telephone numbers of Engineer, Contractor, Subcontractors, and major equipment suppliers.
2. Part 2: Operation and maintenance instructions, arranged by system and subdivided by subsystem. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Include the following:
a. Significant design criteria.
b. List of equipment.
c. Parts list for each component.
d. Operating instructions.
e. Maintenance instructions for equipment and systems.
f. Maintenance instructions for special finishes, including recommended cleaning methods and materials, and special precautions identifying detrimental agents.
g. Safety precautions to be taken when operating and maintaining or working near equipment.
3. Part 3: Project documents and certificates, including the following:
a. Shop Drawings and product data.
b. Air and water balance reports.
c. Certificates.
d. Originals of warranties and bonds.
1.4 MANUAL FOR OPERATION
A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:
1. System, subsystem, and equipment descriptions.
2. Performance and design criteria.
3. Operating standards.
4. Operating procedures.
5. Operating logs.
6. Wiring diagrams.
7. Controls – sequence of operations and diagrams.
8. Piped system diagrams.
9. Precautions against improper use.
10. License requirements including inspection and renewal dates.
B. Descriptions: Include the following:
1. Product name and model number.
2. Manufacturer's name.
3. Equipment identification with serial number of each component.
4. Equipment function.
5. Operating characteristics.
6. Limiting conditions.
7. Performance curves.
8. Engineering data and tests.
9. Complete nomenclature and number of replacement parts.
C. Operating Procedures: Include the following, as applicable:
1. Startup procedures.
2. Equipment or system break-in procedures.
3. Routine and normal operating instructions.
4. Regulation and control procedures.
5. Instructions on stopping.
6. Normal shutdown instructions.
7. Seasonal and weekend operating instructions.
8. Required sequences for electronic systems.
9. Special operating instructions and procedures.
1.5 MANUAL FOR MATERIALS AND FINISHES
A. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Engineer will review draft and return one copy with comments.
B. For equipment or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance.
C. Submit three sets of revised final volumes within ten days after final inspection.
D. Submit in PDF composite electronic indexed file of final manual within ten days after final inspection.
E. Building Products, Applied Materials, and Finishes: Include product data, with catalog number, size, composition, and color and texture designations. Include information for re-ordering custom-manufactured products.
F. Instructions for Care and Maintenance: Include manufacturer's recommendations for cleaning agents and methods, precautions against detrimental agents and methods, and recommended schedule for cleaning and maintenance.
G. Moisture Protection and Weather Exposed Products: Include product data listing applicable reference standards, chemical composition, and details of installation. Include recommendations for inspections, maintenance, and repair.
H. Additional Requirements: As specified in individual product Specification Sections.
I. Include listing in table of contents for design data, with tabbed fly sheet and space for insertion of data.
1.6 MANUAL FOR EQUIPMENT AND SYSTEMS
A. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Engineer will review draft and return one copy with comments.
B. For equipment, or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance.
C. Submit three sets of revised final volumes within ten days after final inspection.
D. Submit in PDF composite electronic indexed file of final manual within ten days after final inspection.
E. Each Item of Equipment and Each System: Include description of unit or system and component parts. Identify function, normal operating characteristics, and limiting conditions. Include performance curves, with engineering data and tests, and comple...
F. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and communications; by label machine.
G. Include color-coded wiring diagrams as installed.
H. Operating Procedures: Include startup, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shutdown, and emergency instructions. Include summer, winter, and special operating instructions.
I. Maintenance Requirements: Include routine procedures and guide for preventative maintenance and troubleshooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions.
J. Include servicing and lubrication schedule and list of lubricants required.
K. Include manufacturer's printed operation and maintenance instructions.
L. Include sequence of operation by controls manufacturer.
M. Include original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance.
N. Include control diagrams by controls manufacturer as installed.
O. Include Contractor's coordination drawings with color-coded piping diagrams as installed.
P. Include charts of valve tag numbers, with location and function of each valve, keyed to flow and control diagrams.
Q. Include list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage.
R. Include test and balancing reports as specified in Section 01 40 00 - Quality Requirements.
S. Additional Requirements: As specified in individual product Specification Sections.
T. Include listing in table of contents for design data with tabbed dividers and space for insertion of data.
1.7 MAINTENANCE SERVICE
A. Furnish service and maintenance of components indicated in Specification.
B. Examine system components at frequency consistent with reliable operation. Clean, adjust, and lubricate as required.
C. Include systematic examination, adjustment, and lubrication of components. Repair or replace parts whenever required. Use parts produced by manufacturer of original component.
D. Do not assign or transfer maintenance service to agent or Subcontractor without prior written consent of Owner.
PART 2 - PRODUCTS - Not Used
PART 3 - EXECUTION – Not Used