01 61 00 - Product Requirements.pdf

PDF 221 KB Posted

Attached to
Alterations for Penn Township Municipal Building - Shop
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a Product Requirements specification document prepared by Herbert, Rowland & Grubic, Inc. for the Alterations for Penn Township Municipal Building project in Pennsylvania. The specification establishes standards for all products incorporated into the Work, defining requirements for product selection, delivery, storage, and handling. Products must comply with specified requirements and reference standards, be new at time of installation, and be furnished by qualified manufacturers suitable for intended use. Where specifications name a single product and manufacturer, the contractor must provide that named product; where multiple manufacturers are listed, the contractor may select any compliant option. The document establishes a substitution process for alternate products demonstrating equal qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics. Products must be transported and delivered in manufacturer's original sealed containers with complete labels and instructions, with delivery scheduled to minimize long-term on-site storage and prevent overcrowding of construction spaces.

The specification requires contractors to promptly inspect shipments for compliance with requirements, correct quantities, and product damage. Products must be stored and protected according to manufacturer's instructions with seals and labels intact and legible, with sensitive products stored in weathertight, climate-controlled enclosures. Exterior storage of fabricated products must be placed on sloped supports aboveground, and products subject to deterioration must be covered with impervious sheeting with ventilation to prevent condensation. Loose granular materials must be stored on solid flat surfaces in well-drained areas. The specification reserves the Engineer's right to limit product selection to those with warranties not in conflict with Contract Document requirements. Equipment electrical characteristics and components must comply with specifications detailed in individual Specification Sections.

View the file

Other files

File Type Posted
00 01 10 - Table of Contents.pdf PDF
00 01 01 - LA Cover - need date.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
01 12 00 - Multiple Contract Summary.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
2026.07.14 - H9 - Penn Twp Office - Bid Set - SEALED.pdf PDF
00 55 00 - Notice to Proceed.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 62 76 - App for Payment.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
2026.07.14 - H9 - Penn Twp Shop - Bid Set - SEALED.pdf PDF
01 77 00 - Closeout Procedures-R.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
00 72 00 - Standard General Conditions 2018.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 01 07 - Seal Page - Office Building.pdf PDF
00 63 36 - Field Order Form-R.pdf PDF
00 01 01 - LA Cover.pdf PDF
00 73 00 - Supplementary Conditions 2018.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 32 16 - Construction Progress Schedule.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 42 00 - References.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 61 00 - PRODUCT REQUIREMENTS

Herbert, Rowland & Grubic, Inc. 01 61 00 - 1 006566.0459

SECTION 01 61 00 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Products.

B. Product delivery requirements.

C. Product storage and handling requirements.

D. Product options.

E. Equipment electrical characteristics and components.

1.2 DEFINITIONS

A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent:

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. “Or Equal” Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis of Design Product: The Project was designed generally around the first or singularly named manufacturers. Where a specific manufacturer's product is named, including make or model number or other designation, it is to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics. If the Contractor chooses to furnish an alternately named manufacturer or product, a substitution request must be made in accordance with paragraph

7.05 of the General Conditions.

1.3 PRODUCTS

A. At minimum, comply with specified requirements and reference standards.

B. Specified products define standard of quality, type, function, dimension, appearance, and performance required.

C. Furnish products of qualified manufacturers that are suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise. Confirm that

Herbert, Rowland & Grubic, Inc. 01 61 00 - 2 006566.0459 manufacturer's production capacity can provide sufficient product, on time, to meet Project requirements.

1.4 PRODUCT DELIVERY REQUIREMENTS

A. Transport and handle products according to manufacturer's instructions.

B. Deliver products in manufacturer's original sealed container or packaging, complete with labels/instructions for storing, handling, unpacking, protecting, and installing.

C. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.

D. Provide equipment and personnel to handle products; use methods to prevent soiling, disfigurement, or damage.

E. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces:

1. Coordinate delivery with installation to ensure minimum storage for items that are hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

1.5 PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. Store and protect products according to manufacturer's instructions.

B. Store products with seals and labels intact and legible.

C. Store sensitive products in weathertight, climate-controlled enclosures in an environment suitable to product.

D. For exterior storage of fabricated products, place products on sloped supports aboveground.

E. Provide bonded off-Site storage and protection when Site does not permit on-Site storage or protection.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.

H. Provide equipment and personnel to store products; use methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

1.6 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Products complying with specified reference standards or description.

Herbert, Rowland & Grubic, Inc. 01 61 00 - 3 006566.0459

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and that are new at time of installation:

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Engineer reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

B. Product Selection Procedures:

1. Product: Where Specifications name a single product and manufacturer, provide the named product. Where Specifications include a list of names of both products and manufacturers, provide one of the products listed that complies with requirements.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or equal source that complies with requirements. Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements.

3. Basis-of-Design Product: Where Specifications name a product and manufacturer, provide the specified product. Where Contract Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named provide named product. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system.

4. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, textures" or a similar phrase, select a product that complies with other specified requirements:

a. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that does not include premium items.

b. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 EQUIPMENT ELECTRICAL CHARACTERISTICS AND COMPONENTS

A. As specified in individual Specification Sections.

PART 3 - EXECUTION - Not Used.

END OF SECTION