00 60 00 - Project Forms.pdf

PDF 246 KB Posted

Attached to
Alterations for Penn Township Municipal Building - Shop
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a Project Forms document for the Alterations for Penn Township Municipal Building project in Pennsylvania, prepared by Herbert, Rowland & Grubic, Inc. The project consists of two separate contracts: Contract #1 for General Construction work including demolition, sitework, concrete, alterations, exterior finishes, storefront glass, and replacement doors; and Contract #2 for Electrical Construction work including heating and lighting provisions for new vestibules and entry areas. Bids are due online through the PennBid Program by 10:00 AM local time on September 3, 2026, with publicly displayed bid results following submission. The Township Board of Supervisors will consider the Notice of Intent to Award at its September 14, 2026 meeting. Bidding documents are available for download from https://pennbid.bonfirehub.com/, and prospective bidders are encouraged to register as plan holders on the designated website, which will be updated periodically with addenda and other relevant information.

The project utilizes a modified EJCDC (Engineers Joint Contract Documents Committee) agreement structure, including a modified EJCDC C-520 Owner/Contractor Agreement and modified EJCDC C-700 General Conditions with supplementary conditions incorporated into the Project Manual. Standard construction administration forms will be employed throughout the project, including Performance Bonds (EJCDC C-610), Payment Bonds (EJCDC C-615), Requests for Information, Field Orders, Work Change Directives, Change Orders, Applications for Payment, Certificates of Substantial Completion, and Affidavits of Release of Liens. All forms will be available in native format through the Project Documentation Website or upon request.

View the file

Other files

File Type Posted
00 01 10 - Table of Contents.pdf PDF
00 01 01 - LA Cover - need date.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
01 12 00 - Multiple Contract Summary.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
2026.07.14 - H9 - Penn Twp Office - Bid Set - SEALED.pdf PDF
00 55 00 - Notice to Proceed.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 62 76 - App for Payment.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
2026.07.14 - H9 - Penn Twp Shop - Bid Set - SEALED.pdf PDF
01 77 00 - Closeout Procedures-R.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
00 72 00 - Standard General Conditions 2018.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 01 07 - Seal Page - Office Building.pdf PDF
00 63 36 - Field Order Form-R.pdf PDF
00 01 01 - LA Cover.pdf PDF
00 73 00 - Supplementary Conditions 2018.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 32 16 - Construction Progress Schedule.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 42 00 - References.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 60 00 – PROJECT FORMS

Herbert, Rowland & Grubic, Inc. 00 60 00 - 1 006566.0459

SECTION 00 60 00 – PROJECT FORMS

PART 1 - GENERAL

1.1 FORM OF AGREEMENT AND GENERAL CONDITIONS

A. The following form of Owner/Contractor Agreement and form of the General Conditions shall be used for Project:

1. The Agreement between the Owner and Contractor is included in the Project

Manual, modified EJCDC C-520.

2. The General Conditions are included in the Project Manual, modified EJCDC C-

700.

3. The Supplementary Conditions for Project are incorporated into a modified copy of the General Conditions included in the Project Manual.

1.2 ADMINISTRATIVE FORMS

A. Preconstruction Forms:

1. Performance Bond: Section 00 61 13.13 of Project Manual, EJCDC C-610.

2. Payment Bond: Section 00 61 13.16 of the Project Manual, EJCDC C-615.

B. Information and Modification Forms: The following forms contained in the Project

Manual will be utilized:

1. Requests for Information (RFIs): Section 00 63 13, modified CSI 13.2A.

2. Field Order: Section 00 63 36, modified EJCDC C-942.

3. Work Change Directive: Section 00 63 49, modified EJCDC C-940.

4. Change Order Form: Section 00 63 63, modified EJCDC C-941.

5. Forms identified above will be available in their native format and will be made available on the Project Documentation Website or upon request.

C. Application for Payment: The following forms contained in the Project Manual will be utilized:

1. Application for Payment Form: Section 00 62 76, EJCDC C-620.

2. Forms identified above will be available in their native format and will be made available on the Project Documentation Website or upon request.

D. Closeout Forms: The following forms contained in the Project Manual will be utilized:

1. Certificate of Substantial Completion: Section 00 65 16, modified EJCDC C-625.

2. Affidavit of Release of Liens: Section 00 65 19.16.

3. Consent of Surety to Final Payment: Section 00 65 19.19.

END OF SECTION

File details come from the government source that posted it. Updated .