00 01 10 - Table of Contents.pdf
PDF 267 KB Posted
- Solicitation number
- Not on record
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a Table of Contents document for a construction project managed by Herbert, Rowland & Grubic, Inc. on behalf of Penn Township in Pennsylvania for alterations to the Penn Township Municipal Building. The project consists of two separate contracts: Contract #1 covers general construction work including demolition, sitework, concrete, general alteration construction, exterior replacement finishes, storefront glass, replacement doors, and associated work; Contract #2 covers electrical construction work including heating and lighting provisions for the new vestibule, rear entry, and side entry, plus associated work. Bids are to be submitted online via the PennBid Program, with a deadline of 10:00 AM local time on September 3, 2026. Following the bid submission and public display of bids on PennBid, the Township Board of Supervisors will consider the Notice of Intent to Award at its September 14, 2026 meeting at the Township Office. The bidding documents are available for download at https://pennbid.bonfirehub.com/, and prospective bidders are urged to register with the designated website as plan holders to receive all official notifications, addenda, and project updates.
The document serves as a comprehensive index to the project specifications and contracting requirements, organizing sections into Division 00 (Procurement and Contracting Requirements), Division 01 (General Requirements), and specifications for individual trades. The procurement section includes standard bidding documents such as the Advertisement for Bids, Instructions to Bidders, Bid Bond, Non-Collusion Affidavit, EEO Certificate, and Public Works Employment Verification Form. Contracting requirements include the Agreement Between Owner and Contractor, Notice to Proceed, Performance Bond, Payment Bond, and various project forms for applications, requests for information, change orders, and lien releases. The specifications reference wage rate requirements, equal employment opportunity requirements, anti-pollution measures, and statutory requirements applicable to the project.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Herbert, Rowland & Grubic, Inc. 00 01 10 - 1 006566.0459
Alterations for Penn Township Municipal Building
Penn Township
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION: PAGES
SEALS PAGE ....................................................................................................................................... 00 01 07: 1
Procurement Requirements ADVERTISEMENT FOR BIDS ............................................................................................................... 00 11 13: 3 INSTRUCTIONS TO BIDDERS .............................................................................................................. 00 21 13: 11 BID BOND .......................................................................................................................................... 00 43 13: 2 NON-COLLUSION AFFIDAVIT ............................................................................................................. 00 45 19: 1 EEO CERTIFICATE .............................................................................................................................. 00 45 36: 1 PUBLIC WORKS EMPLOYMENT VERIFICATION FORM ....................................................................... 00 45 46: 1
Contracting Requirements AGREEMENT BETWEEN OWNER and CONTRACTOR for CONSTRUCTION CONTRACT ..................... 00 52 00: 8 NOTICE TO PROCEED FORM.............................................................................................................. 00 55 00: 1 PROJECT FORMS ............................................................................................................................... 00 60 00: 1 PERFORMANCE BOND ...................................................................................................................... 00 61 13.13: 5 PAYMENT BOND ............................................................................................................................... 00 61 13.16: 5 CONTRACTORS APPLICATION FOR PAYMENT ................................................................................... 00 62 76: 6 REQUEST FOR INFORMATION FORM ................................................................................................ 00 63 13: 1 FIELD ORDER FORM .......................................................................................................................... 00 63 36: 1 WORK CHANGE DIRECTIVE FORM .................................................................................................... 00 63 49: 1 CHANGE ORDER FORM ..................................................................................................................... 00 63 63: 1 CERTIFICATE OF SUBSTANTIAL COMPLETION FORM ........................................................................ 00 65 16: 1 AFFIDAVIT OF RELEASE OF LIENS FORM ........................................................................................... 00 65 19.16: 1 CONSENT OF SURETY FOR FINAL PAYMENT FORM .......................................................................... 00 65 19.19: 1 STANDARD GENERAL CONDITIONS ................................................................................................... 00 72 00: 78 SUPPLEMENTARY CONDITIONS ........................................................................................................ 00 73 00: 14 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.................................................................... 00 73 36: 4 WAGE RATE REQUIREMENTS ............................................................................................................ 00 73 43: 4 WAGE DETERMINATION SCHEDULE ................................................................................................. 00 73 46: 8 ANTI-POLLUTION MEASURES ............................................................................................................ 00 73 53: 1 STATUTORY REQUIREMENTS ............................................................................................................ 00 73 73: 8
Specifications
DIVISION 01 – GENERAL REQUIREMENTS PAGES
01 10 00 PROJECT SUMMARY
01 12 00 MULTIPLE CONTRACT SUMMARY
01 22 00 UNIT PRICES
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 26 13 REQUESTS FOR INTERPRETATION
01 29 00 PAYMENT PROCEDURES
01 31 13 PROJECT COORDINATION
01 31 19 PROJECT MEETINGS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 61 00 PRODUCT REQUIREMENTS
01 73 00 EXECUTION REQUIREMENTS
01 77 00 CLOSEOUT PROCEDURES
01 78 39 PROJECT RECORD DOCUMENTS
TABLE OF CONTENTS
Herbert, Rowland & Grubic, Inc. 00 01 10 - 2 006566.0459
DRAWINGS
File details come from the government source that posted it. Updated .