This is a Construction Agreement for a Stipulated Price Contract between Penn Township (Owner) and a contractor for alterations to the Penn Township Municipal Building. The project includes general construction work such as demolition, sitework, concrete, exterior replacement finishes, storefront glass, and replacement doors, as well as electrical work including heating and lighting for new vestibules and entry points. Herbert, Rowland & Grubic, Inc. and Hex 9 Architects serve as the project engineers and designers. Bids were due by 10:00 AM on September 3, 2026, with the Notice of Intent to Award to be considered by the Township Board of Supervisors on September 14, 2026. The Work must reach Substantial Completion on or before April 12, 2027, with final completion and readiness for payment by April 26, 2027. The contract consists of 15 drawing sheets and includes both general and supplementary conditions, specifications, performance and payment bonds, and work change directives as part of the contract documents.
The contract price is established through the contractor's bid as submitted on the Bid Form. Progress payments are made monthly on or about the second Monday of each month based on the percentage of work completed, with 10 percent retainage applied prior to Substantial Completion. Once 50 percent or more of the work is completed and deemed satisfactory, retainage may be reduced to 5 percent. Upon Substantial Completion, payments increase to 100 percent of completed work less 150 percent of the engineer's estimate for remaining punch list items. The contractor is subject to liquidated damages of $1,000 per day for delays beyond the Substantial Completion date and an additional $1,000 per day for delays in final completion. All payments not made when due accrue interest at 10 percent per annum. The contractor must comply with Pennsylvania prevailing wage requirements, steel products procurement acts, anti-discrimination provisions, workers' compensation insurance, and EPA and PADEP environmental requirements. The contractor must also maintain comprehensive accounting records for three years after final payment and assume all risk and liability for work performance.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Herbert, Rowland & Grubic, Inc. 00 52 00 - 1 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
AGREEMENT BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT
This Agreement is by and between Penn Township (“Owner”) and
_______________________________________________________________________ (“Contractor”).
Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions.
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
1.1 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Alterations for Penn Township Municipal Building.
ARTICLE 2—THE PROJECT
2.1 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Alterations for Penn Township Municipal Building.
ARTICLE 3—ENGINEER
3.1 The Owner has retained Herbert, Rowland & Grubic, Inc. and Hex 9 Architects (“Engineers”) to act as Owner’s representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract.
3.2 The part of the Project that pertains to the Work has been designed by Hex 9 Architects.
ARTICLE 4—CONTRACT TIMES
4.1 Time is of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.2 Contract Times: Dates
A. The Work will be substantially complete on or before April 12, 2027 and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before April 26, 2027.
4.5 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time.
Herbert, Rowland & Grubic, Inc. 00 52 00 - 2 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $1,000 for each day that expires after such time until the Work is completed and ready for final payment.
3. Liquidated damages for failing to timely attain Substantial Completion, and final completion are not additive, and will not be imposed concurrently.
B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such liquidated damages are Owner’s sole and exclusive remedy for such delay, and Owner is precluded from recovering any other damages, whether actual, direct, excess, or consequential, for such delay, except for special damages (if any) specified in this Agreement.
ARTICLE 5—CONTRACT PRICE
5.1 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents, as indicated on the Bid Form.
A. The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer.
B. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an exhibit.
ARTICLE 6—PAYMENT PROCEDURES
6.1 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.2 Progress Payments; Retainage
A. Owner shall make progress payments on the basis of Contractor’s Applications for Payment on or about the second Monday of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments
Herbert, Rowland & Grubic, Inc. 00 52 00 - 3 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract.
a. 10 percent of the value of the Work completed (with the balance being retainage).
1) If 50 percent or more of the Work has been completed, as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, the retainage may be reduced from 10 percent to 5 percent.
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions, and less 150 percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment.
6.3 Final Payment
A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the Contract Price in accordance with Paragraph 15.06 of the General Conditions.
6.4 Consent of Surety
A. Owner will not make final payment or return or release retainage at Substantial Completion or any other time, unless Contractor submits written consent of the surety to such payment, return, or release.
6.5 Interest
A. All amounts not paid when due will bear interest at the rate of 10 percent per annum.
ARTICLE 7—CONTRACT DOCUMENTS
7.1 Contents
A. The Contract Documents consist of all of the following:
1. This Agreement.
2. Bonds:
a. Performance bond (together with power of attorney).
b. Payment bond (together with power of attorney).
3. General Conditions.
4. Supplementary Conditions.
5. Specifications as listed in the table of contents of the project manual (copy of list attached).
6. Drawings (not attached but incorporated by reference) consisting of 15 sheets bearing the following general title: Alterations for Penn Township Municipal Building.
8. Addenda (numbers [number] to [number], inclusive).
9. Exhibits to this Agreement (enumerated as follows):
Herbert, Rowland & Grubic, Inc. 00 52 00 - 4 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
a. N/A
10. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
c. Change Orders.
d. Field Orders.
B. The Contract Documents listed in Paragraph 7.1.A are attached to this Agreement (except as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 7.
D. The Contract Documents may only be amended, modified, or supplemented as provided in the Contract.
ARTICLE 8—REPRESENTATIONS, CERTIFICATIONS, AND STIPULATIONS
8.1 Contractor’s Representations
A. In order to induce Owner to enter into this Contract, Contractor makes the following representations:
1. Contractor has examined and carefully studied the Contract Documents, including Addenda.
2. Contractor has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Contractor has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Contractor has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and
Herbert, Rowland & Grubic, Inc. 00 52 00 - 5 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
procedures of construction to be employed by Contractor; and (c) Contractor’s safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
9. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
10. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing In the hiring of employees for the performance of Work under this Agreement or any subcontract, neither Contractor nor any subcontractor or any person acting on behalf of the Contractor or any subcontractor shall be reason of gender, race, creed or color discriminate against any citizen of the Commonwealth of Pennsylvania who is qualified and available to perform the work to which such employment relates.
12. In the hiring of employees for the performance of Work under this Agreement or any subcontract, neither Contractor nor any subcontractor or any person acting on behalf of the Contractor or any subcontractor shall by reason of gender, race, creed or color discriminate against any citizen of the Commonwealth of Pennsylvania who is qualified and available to perform the work to which such employment relates.
13. Neither Contractor nor any subcontractor or any person on behalf of Contractor or any subcontractor shall in any manner discriminate against or intimidate any employee hired for the performance of the Work under this Agreement on account of gender, race, creed or color.
14. Contractor shall accept the provisions for the Workers’ Compensation Act of 1915, and any supplements or amendments thereof, and Contractor shall insure its liability thereunder or file with Owner a certificate of exemption from insurance issued by the Department of Labor and Industry of the Commonwealth of Pennsylvania.
15. That it is financially solvent and experienced in and competent to perform the Work.
16. That it is familiar with all Federal, State, Township and County laws, ordinances and regulations which may in any way affect the completion of the Work.
17. That it has carefully examined the Contract Documents and that it has familiarized itself with the various conditions affecting the Work.
18. That it will perform the Work in accordance with the requirements of the Contract Documents.
Herbert, Rowland & Grubic, Inc. 00 52 00 - 6 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
19. The Contractor and all Subcontractors shall comply with all applicable provisions of the Pennsylvania Human Relations Act, 43 P.S. § 951 et seq., and all applicable regulations promulgated thereunder. The Contractor agrees that the provisions of the Act, as amended, are made a part of this Agreement.
20. In accordance with Act 3 of 1978, if any steel or steel products are to be used or supplied in the performance of the Work, only those produced in the United States as defined in the Act shall be used or supplied in the performance of the Work, including any subcontracts. In accordance with Act 161 of 1982, cast iron products shall also be considered steel products governed by the Steel Products Procurement Act, and all cast iron products shall be produced in the United States. In accordance with Act 141 of 1984, steel products is defined to include machinery and equipment, and machinery and equipment which is governed by the Steel Products Procurement Act shall be supplied in accordance with the requirements of such Act.
21. Contractor shall assume all risk of damage or loss which may occur in the performance of the Work or any part thereof and with respect to any of the materials or other things done, furnished and supplied by the Contractor, or used and employed in the Work and in the performance of this Agreement. Contractor shall assume all liability for, and shall indemnify and hold the Owner harmless from and against, all claims and expenses resulting from accidents, negligence or other cause that may occur during the performance of the Work and this Agreement to any person or persons employed upon the Work or to any other person or persons who may be injured or to any property which may be damaged in any manner whatsoever by and during the performance of the Work, together with all costs (including attorneys' fees cost of defense) incurred in connection with said claim or claims. The parties hereto agree that in any and all relevant respects the Contractor is to be considered as an independent contractor.
22. Contractor shall comply with Pennsylvania Act 187 of 1996 relating to the Pennsylvania One Call System.
23. Contractor and all subcontractors shall comply with all requirements of EPA and PADEP, and furnishing the Work required by the Contract Documents.
8.2 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 8.2:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner,
(b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
Herbert, Rowland & Grubic, Inc. 00 52 00 - 7 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
8.3 Standard General Conditions
A. Owner stipulates that if the General Conditions that are made a part of this Contract are EJCDC® C-700, Standard General Conditions for the Construction Contract (2018), published by the Engineers Joint Contract Documents Committee, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or “track changes” (redline/strikeout), or in the Supplementary Conditions.
8.4 Accounting Records
A. Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 13.01.E of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice, Owner shall be afforded reasonable access during normal business hours to all Contractor’s records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and Contractor’s fee. Contractor shall preserve all such documents for a period of three years after the final payment by Owner.
Herbert, Rowland & Grubic, Inc. 00 52 00 - 8 006566.0459
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.
This Agreement will be effective on [indicate date on which Contract becomes effective] (which is the Effective Date of the Contract).
Owner: Contractor:
Penn Township (typed or printed name of organization) (typed or printed name of organization)
By: By:
(individual’s signature) (individual’s signature)
Date: Date:
(date signed) (date signed)
Name: Name:
(typed or printed) (typed or printed)
Title: Title:
(typed or printed) (typed or printed)
(If [Type of Entity] is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest: Attest:
(individual’s signature) (individual’s signature)
Title: Title:
(typed or printed) (typed or printed)
Address for giving notices: Address for giving notices:
97 N Penryn Road
Manheim, PA 17545
Designated Representative: Designated Representative:
Name: Name:
(typed or printed) (typed or printed)
Title: Title:
(typed or printed) (typed or printed)
Address: Address:
Phone: Phone:
Email: Email:
(If [Type of Entity] is a corporation, attach evidence of authority to sign. If [Type of Entity] is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of this Agreement.)
License No.:
(where applicable)
State:
File details come from the government source that posted it. Updated .