This is a specification document for Temporary Facilities and Controls prepared by Herbert, Rowland & Grubic, Inc. for the Penn Township Municipal Building Alterations project in Pennsylvania. The document outlines comprehensive requirements for temporary construction facilities and controls that contractors must provide during execution of the work. Key requirements include temporary utilities (electricity, lighting, water, sanitary facilities), construction facilities (field offices, vehicular access, parking), and temporary controls (barriers, enclosures, security, dust control, erosion and sediment control, noise control, pest control, and pollution control). The specification mandates that contractors coordinate all site usage with the Owner to ensure continuous operations, maintain dust and debris control through polyethylene curtains and daily cleaning, provide temporary sanitary facilities at project mobilization, maintain limited on-site parking with off-site alternatives as needed, and establish fire prevention measures including portable fire extinguishers at stairways, trailers, and during roofing operations. Traffic regulation requirements include coordination with authorities having jurisdiction for haul routes, trained flag persons for traffic control, and appropriate signage and signals. Contractors must protect existing trees and plants within drip lines with six-foot barriers, restrict unauthorized site access through a security program with entry logs, and prevent photography without Owner approval.

The specification establishes that contractors are responsible for all costs associated with temporary facilities and utilities required for construction operations. Removal of all temporary utilities, equipment, facilities, and materials must be completed before final payment application, with restoration of existing and permanent facilities to original condition. The document does not address pricing terms, set-asides, incumbents, or funding sources, as it is purely a technical specification section detailing contractor obligations for temporary facilities management and environmental controls during the alteration project.

View the file

Other files

File Type Posted
00 01 10 - Table of Contents.pdf PDF
00 01 01 - LA Cover - need date.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
01 12 00 - Multiple Contract Summary.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
2026.07.14 - H9 - Penn Twp Office - Bid Set - SEALED.pdf PDF
00 55 00 - Notice to Proceed.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 62 76 - App for Payment.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 36 EEO Certificate.pdf PDF
2026.07.14 - H9 - Penn Twp Shop - Bid Set - SEALED.pdf PDF
01 77 00 - Closeout Procedures-R.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
00 72 00 - Standard General Conditions 2018.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 01 07 - Seal Page - Office Building.pdf PDF
00 63 36 - Field Order Form-R.pdf PDF
00 01 01 - LA Cover.pdf PDF
00 73 00 - Supplementary Conditions 2018.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 32 16 - Construction Progress Schedule.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 42 00 - References.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 50 00 - TEMPORARY FACILITIES AND CONTROLS

Herbert, Rowland & Grubic, Inc. 01 50 00 - 1 006566.0459

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Temporary facilities under Construction Management Agreement.

B. Temporary Utilities:

1. Temporary electricity.

2. Temporary lighting for construction purposes.

3. Temporary heating.

4. Temporary cooling.

5. Temporary ventilation.

6. Communication services.

7. Temporary water service.

8. Temporary sanitary facilities.

C. Construction Facilities:

1. Field offices and sheds.

2. Vehicular access.

3. Parking.

4. Progress cleaning and waste removal.

5. Traffic regulation.

6. Fire-prevention facilities.

D. Temporary Controls:

1. Barriers.

2. Enclosures and fencing.

3. Security.

4. Water control.

5. Dust control.

6. Erosion and sediment control.

7. Noise control.

8. Pest and rodent control.

9. Pollution control.

E. Removal of utilities, facilities, and controls.

1.2 REFERENCES

A. ASTM International:

1. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building

Materials.

2. ASTM E 90 - Standard Test Method for Laboratory Measurement of Airborne

Sound Transmission Loss of Building Partitions and Elements.

3. ASTM E 119 - Standard Test Methods for Fire Tests of Building Construction and

Materials.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 2 006566.0459

1.3 CONTRACTOR USE OF PREMISES

A. Contractors use of the site shall at all times be coordinated with the Owner so as to ensure continuous operation.

B. Contractors shall not be provided space in any of the existing buildings, except as required, to accomplish the Work of the Contracts.

C. Contractor shall take all precautions to minimize dust, dirt, and debris while working in the areas indicated on the Contract Drawings. Provide polyethylene curtains or other barriers over opening between new work and existing work areas as required. Clean and remove debris daily before leaving work site.

1.4 TEMPORARY FACILITIES

A. Temporary Provisions Provided by Contractor:

1. Temporary barriers, barricades, covered walkways, fencing, exterior closures, and interior closures.

2. Temporary field offices.

3. Cleaning during construction.

4. Access roads and approaches.

5. Temporary sanitary facilities.

6. Temporary heating and ventilating after enclosure.

7. Temporary electrical service and distribution system for power and lighting.

8. Temporary telephone and internet service.

B. Each Contractor: Coordinate provisions with Engineer or Owner and provide the following items as necessary for execution of the Work including associated costs:

1. Construction aids.

2. Temporary fire protection, dust control, erosion and sediment control, water control, noise control, and other necessary temporary controls.

3. Temporary barriers, barricades, and similar devices as necessary for safety and protection of construction personnel and public.

4. On Owner’s approval, may provide temporary field office including electrical service and temporary telephone.

5. Temporary tree and plant protection.

6. Temporary heating before building enclosure.

7. Electrical service required in addition to temporary service and distribution provided by herein.

8. Temporary provisions for protection of installed Work.

1.5 TEMPORARY ELECTRICITY

A. Each Contract shall provide and pay for power service required as needed for construction operation.

1.6 TEMPORARY LIGHTING FOR CONSTRUCTION PURPOSES

A. Provide and maintain lighting for construction operations.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 3 006566.0459

1.7 TEMPORARY HEATING

A. N/A.

1.8 TEMPORARY COOLING

A. N/A.

1.9 TEMPORARY VENTILATION

A. N/A.

1.10 COMMUNICATION SERVICES

A. N/A.

1.11 TEMPORARY WATER SERVICE

A. Each Contractor shall provide and pay for suitable quality water service as needed to maintain conditions for construction operations.

1.12 TEMPORARY SANITARY FACILITIES

A. Each Contractor shall provide and maintain required facilities and enclosures. Existing facility use is not permitted. Provide facilities at time of Project mobilization.

1.13 FIELD OFFICES AND SHEDS

A. There will be limited on-site availability for Contractor’s field office and/or shed.

B. If Site space is not adequate, utilize an offsite location.

C. Do not use existing facilities for field offices or for storage.

D. Locate field offices and sheds a minimum distance of 30 feet from structures.

1.14 VEHICULAR ACCESS

A. Provide unimpeded access for emergency vehicles. Maintain 20 foot-wide driveways with turning space between and around combustible materials.

B. Provide and maintain access to fire hydrants and control valves free of obstructions.

C. Provide means of removing mud from vehicle wheels before entering streets.

1.15 PARKING

A. There will be limited on-site parking available.

B. If Site space is not adequate, provide additional off-Site parking.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 4 006566.0459

C. Maintenance:

1. Maintain traffic and parking areas in sound condition, free of excavated material, construction equipment, products, mud, snow, ice, and the like.

2. Maintain existing and permanent paved areas used for construction; promptly repair breaks, potholes, low areas, standing water, and other deficiencies, to maintain paving and drainage in original condition.

D. Removal, Repair:

1. Repair facilities damaged by use, to original condition.

E. Mud from Site vehicles: Provide means of removing mud from vehicle wheels before entering streets.

1.16 PROGRESS CLEANING AND WASTE REMOVAL

A. Maintain areas free of waste materials, debris, and rubbish. Maintain Site in clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, before enclosing spaces.

C. Broom and vacuum clean interior areas before starting surface finishing, and continue cleaning to eliminate dust.

D. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.

1.17 TRAFFIC REGULATION

A. Signs, Signals, and Devices:

1. Post-Mounted and Wall-Mounted Traffic Control and Informational Signs: As approved by authorities having jurisdiction.

2. Traffic Control Signals: As approved by local jurisdictions.

3. Traffic Cones, Drums, Flares, and Lights: As approved by authorities having jurisdiction.

4. Flag Person Equipment: As required by authorities having jurisdiction.

B. Flag Persons: Provide trained and equipped flag persons to regulate traffic when construction operations or traffic encroach on public traffic lanes.

C. Flares and Lights: Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic.

D. Haul Routes:

1. Consult with authorities having jurisdiction and establish public thoroughfares to be used for haul routes and Site access.

E. Traffic Signs and Signals:

Herbert, Rowland & Grubic, Inc. 01 50 00 - 5 006566.0459

1. Provide signs at approaches to Site and on Site, at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic.

2. Provide, operate, and maintain traffic control signals to direct and maintain orderly flow of traffic in areas under Contractor's control and areas affected by Contractor's operations.

3. Relocate signs and signals as Work progresses, to maintain effective traffic control.

F. Removal:

1. Remove equipment and devices when no longer required.

2. Repair damage caused by installation.

3. Remove post settings to depth of 2 feet.

1.18 FIRE-PREVENTION FACILITIES

A. Prohibit smoking on site and within buildings.

B. Establish fire watch for cutting, welding, and other hazardous operations capable of starting fires. Maintain fire watch before, during, and after hazardous operations until threat of fire does not exist.

C. Portable Fire Extinguishers: NFPA 10; 10-pound capacity, 4A-60B: C UL rating:

1. Provide one fire extinguisher at each stairway on each floor of buildings under construction and demolition.

2. Provide minimum of one fire extinguisher in every construction trailer and storage shed.

3. Provide minimum of one fire extinguisher on roof during roofing operations using heat-producing equipment.

1.19 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations.

B. Tree and Plant Protection: Preserve and protect existing trees and plants designated to remain:

1. Protect areas within drip lines from traffic, parking, storage, dumping, chemically injurious materials and liquids, ponding, and continuous running water.

2. Provide 6-foot-high barriers around drip line, with access for maintenance.

3. Replace trees and plants damaged by construction operations.

C. Protect non-owned vehicular traffic, stored materials, Site, and structures from damage.

1.20 ENCLOSURES AND FENCING

A. Construction: Contractor's option.

Herbert, Rowland & Grubic, Inc. 01 50 00 - 6 006566.0459

1.21 SECURITY

A. Security Program:

1. Protect Work on existing premises and Owner's operations from theft, vandalism, and unauthorized entry.

B. Entry Control:

1. Restrict entrance of persons and vehicles to Project Site and existing facilities.

2. Allow entrance only to authorized persons with proper identification.

3. Maintain log of workers and visitors and make available to Owner on request.

4. Coordinate access of Owner's personnel to Site in coordination with Owner's security forces.

C. Restrictions:

1. Do not allow cameras on Site or photographs taken except by written approval of

Owner.

2. Do no work on Sundays and days indicated in Contract Documents.

1.22 WATER CONTROL

A. Grade Site to drain. Maintain excavations free of water. Provide, operate, and maintain necessary pumping equipment.

1.23 DUST CONTROL

A. Execute Work by methods that minimize raising dust from construction operations.

B. Provide positive means to prevent airborne dust from dispersing into atmosphere and into Owner, adjoining property occupied areas.

1.24 EROSION AND SEDIMENT CONTROL

A. Plan and execute construction by methods to control surface drainage from cuts and fills from borrow and waste disposal areas. Prevent erosion and sedimentation.

B. Minimize surface area of bare soil exposed at one time.

C. Provide temporary measures including berms, dikes, drains, and other devices to prevent water flow.

D. Construct fill and waste areas by selective placement to avoid erosive surface silts and clays.

E. Periodically inspect earthwork to detect evidence of erosion and sedimentation. Promptly apply corrective measures.

1.25 NOISE CONTROL

A. Provide methods, means, and facilities to minimize noise produced by construction

Herbert, Rowland & Grubic, Inc. 01 50 00 - 7 006566.0459 operations.

1.26 PEST AND RODENT CONTROL

A. Provide methods, means, and facilities to prevent rodents from accessing or invading premises.

1.27 POLLUTION CONTROL

A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances and pollutants produced by construction operations.

1.28 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, and materials before Final Application for Payment.

B. Clean and repair damage caused by installation or use of temporary Work.

C. Restore existing and permanent facilities used during construction to original condition.

Restore permanent facilities used during construction to specified condition.

PART 2 - PRODUCTS - Not Used.

PART 3 - EXECUTION - Not Used.

END OF SECTION