Summary

This is a Multiple Contract Summary specification document for the Alterations for Penn Township Municipal Building project in Pennsylvania, prepared by Herbert, Rowland & Grubic, Inc. The project is divided into two separate contracts: Contract #1 for General Construction work including demolition, sitework, concrete, general alteration construction, exterior replacement finishes, storefront glass, and replacement doors; and Contract #2 for Electrical Construction work including heating and lighting for the new vestibule, rear entry and side entry. Bids are being received online via the PennBid Program until 10:00 AM local time on September 3, 2026, with the Notice of Intent to Award to be considered by the Township Board of Supervisors at its September 14, 2026 meeting. Bidding documents are available at https://pennbid.bonfirehub.com/. Each contractor is responsible for complete systems and assemblies, including products, components, accessories, and installation as required by the Contract Documents.

The specification establishes that each contractor bears responsibility for trenches, excavation, blocking, backing panels, sleeves, metal fabrication supports, access panels, equipment pads, and roof-mounted equipment curbs for its own work. The General Contractor is responsible for temporary heating, cooling, and ventilation with all associated utility charges, while both contractors share responsibility for electric power service costs regardless of which entity uses the electricity. The General Contractor assumes overall project coordination responsibilities including scheduling, sequencing, utility interruption coordination, and preparation of combined construction schedules for Engineer review and approval. The Electrical Contractor's coordination activities include scheduling electrical activities, coordinating workspace access, preparing coordination drawings, and coordinating tests and inspections specific to electrical work. All official notifications, addenda, and bidding documents will be provided exclusively through the designated PennBid website.

View the file

Other files

File Type Posted
00 01 10 - Table of Contents.pdf PDF
00 01 01 - LA Cover - need date.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
2026.07.14 - H9 - Penn Twp Office - Bid Set - SEALED.pdf PDF
00 55 00 - Notice to Proceed.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 62 76 - App for Payment.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
2026.07.14 - H9 - Penn Twp Shop - Bid Set - SEALED.pdf PDF
01 77 00 - Closeout Procedures-R.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
00 72 00 - Standard General Conditions 2018.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 01 07 - Seal Page - Office Building.pdf PDF
00 63 36 - Field Order Form-R.pdf PDF
00 01 01 - LA Cover.pdf PDF
00 73 00 - Supplementary Conditions 2018.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 32 16 - Construction Progress Schedule.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 42 00 - References.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 12 00 - MULTIPLE CONTRACT SUMMARY

Herbert, Rowland & Grubic, Inc. 01 12 00 - 1 006566.0459

SECTION 01 12 00 - MULTIPLE CONTRACT SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Summary of each contract.

2. Responsibilities for coordination.

3. Responsibilities for temporary facilities.

4. Responsibilities for controls.

B. Related Requirements:

1. Section 01 10 00 - Project Summary: Work covered by the Contract Documents, restrictions on use of Project site, phased construction, coordination with occupants, and work restrictions.

2. Section 01 31 13 - Project Coordination: general coordination requirements.

1.2 SCOPE OF WORK

A. Extent of Contract:

1. Unless otherwise indicated, the work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents.

2. Trenches and other excavation for the work of each contract shall be the work of each contract for its own work.

3. Each contract includes blocking, backing panels, sleeves, and metal fabrication supports for its own work.

4. Furnishing of access panels for the work of each contract shall be the work of each contract for its own work. Installation of access panels shall be the work of each contract for its own work.

5. Equipment pads for the work of each contract shall be the work of each contract for its own work.

6. Roof-mounted equipment curbs for the work of each contract shall be the work of each contract for its own work.

7. Painting for the work of each contract shall be the work of the General Contractor.

8. Cutting and Patching: Cutting provided under each contract for its own work.

Patching for the Work of each Contract shall be the work of each Contractor.

B. Work in the General Construction Contract includes, but is not limited to, the following:

1. Remaining work not identified as work under other contracts.

2. Development and maintenance of the construction schedule.

3. Site preparation, including clearing, demolition and relocations, and earthwork.

4. Site improvements, including roadways, parking lots, pedestrian paving, site development furnishings and equipment, and landscaping.

5. Selective demolition.

6. Foundations, including footings, and foundation walls.

7. Slabs-on-grade, including earthwork, subdrainage systems, and insulation.

Herbert, Rowland & Grubic, Inc. 01 12 00 - 2 006566.0459

8. Exterior closure, including walls, parapets, doors, windows, and louvers.

9. Roofing, including coverings, flashings and roof specialties; responsible for roofing portion of the work after the curbs are installed by other Contractors.

10. Interior construction, including partitions, doors, interior glazed openings, and fittings.

11. Interior finishes.

12. Miscellaneous items, including patching, concrete equipment bases and painting of other Contractor’s work.

13. Installation of control panels for equipment purchased under this this Contract.

C. Work in the Electrical Contract includes, but is not limited to, the following:

1. Site lighting.

2. Site electrical power and distribution.

3. Selective electrical demolition.

4. Exterior and interior lighting.

5. Electrical connections to equipment furnished by the General Contractor.

6. Ventilation System Controls, sensors and wiring.

1.3 TEMPORARY FACILITY RESPONSIBILITIES

A. Temporary Facilities and Controls: In addition to specific responsibilities for temporary facilities and controls indicated in this Section and in Section 01 50 00 "Temporary Facilities and Controls," each contractor is responsible for the following:

1. Installation, operation, maintenance, and removal of each temporary facility necessary for its own normal construction activity, and costs and use charges associated with each facility, except as otherwise provided for in this Section.

2. Plug-in electric power cords and extension cords, supplementary plug-in task lighting, and special lighting necessary exclusively for its own activities.

3. Its own field office, complete with necessary furniture, utilities, and telephone service.

4. Its own storage and fabrication sheds.

5. Temporary enclosures for its own construction activities.

6. Staging and scaffolding for its own construction activities.

7. General hoisting facilities for its own construction activities.

8. Waste disposal facilities, including collection and legal disposal of its own hazardous, dangerous, unsanitary, or other harmful waste materials.

9. Progress cleaning of work areas affected by its operations on a daily basis.

10. Secure lockup of its own tools, materials, and equipment.

11. Construction aids and miscellaneous services and facilities necessary exclusively for its own construction activities.

B. Temporary Heating, Cooling, and Ventilation: The General Contractor is responsible for temporary heating, cooling, and ventilation, including utility-use charges, temporary meters, and temporary connections.

C. Use Charges: Comply with the following:

1. Electric Power Service: Include the cost for electric power service, whether metered or otherwise, for electricity used by all entities engaged in construction activities at Project site in each Contract.

Herbert, Rowland & Grubic, Inc. 01 12 00 - 3 006566.0459

D. Temporary facilities and controls in the General Contract include, but are not limited to, the following:

1. Temporary facilities and controls that are not otherwise specifically assigned to the other contractors.

2. Sediment and erosion control.

3. Temporary enclosure for building exterior, except as indicated.

4. Excavation support and protection, unless required solely for the Work of another contract.

5. General waste disposal facilities.

6. Barricades, warning signs, and lights.

7. Site enclosure fence.

8. Security enclosure and lockup.

9. Environmental protection.

E. Temporary facilities and controls in the Electrical Contract include, but are not limited to, the following:

1. As necessary to complete work and provide complete systems as identified in these specifications and as shown on the Contract Drawings.

1.4 COORDINATION ACTIVITIES

A. Coordination activities of General Contractor include, but are not limited to, the following:

1. Provide overall coordination of the Work.

2. Coordinate shared access to workspaces.

3. Coordinate product selections for compatibility.

4. Provide overall coordination of temporary facilities and controls.

5. Coordinate, schedule, and approve interruptions of permanent and temporary utilities, including those necessary to make connections for temporary services.

6. Coordinate construction and operations of the Work with work performed by each Contract.

7. Prepare coordination drawings in collaboration with each contractor to coordinate work by more than one contract.

8. Coordinate sequencing and scheduling of the Work. Include the following:

B. Initial Coordination Meeting: At earliest possible date, arrange and conduct a meeting with contractors for sequencing and coordinating the Work; negotiate reasonable adjustments to schedules.

C. Prepare a combined contractors' construction schedule for entire Project. Base schedule on preliminary construction schedule. Secure time commitments for performing critical construction activities from contractors. Show activities of each contract on a separate sheet. Prepare a simplified summary sheet indicating combined construction activities of contracts.

1. Submit schedules to Engineer for review and approval.

2. Distribute copies of approved schedules to contractors.

3. Provide photographic documentation.

4. Provide quality-assurance and quality-control services specified in Section

01 40 00 "Quality Requirements."

Herbert, Rowland & Grubic, Inc. 01 12 00 - 4 006566.0459

5. Coordinate sequence of activities to accommodate tests and inspections, and coordinate schedule of tests and inspections.

6. Provide information necessary to adjust, move, or relocate existing utility structures affected by construction.

7. Locate existing permanent benchmarks, control points, and similar reference points, and establish permanent benchmarks on Project site.

8. Provide field surveys of in-progress construction and site work.

9. Provide progress cleaning of common areas and coordinate progress cleaning of areas or pieces of equipment where more than one contractor has worked.

10. Coordinate cutting and patching.

11. Coordinate protection of the Work.

12. Coordinate firestopping.

13. Coordinate completion of interrelated punch list items.

14. Coordinate preparation of Project record documents if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

15. Print and submit record documents if installations by more than one contractor are indicated on the same Contract Drawing or shop drawing.

16. Collect record Specification Sections from contractors, collate Sections into numeric order, and submit complete set.

17. Coordinate preparation of operation and maintenance manuals if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

18. Coordinate start-up and testing of equipment.

D. Electrical Contractor: Coordination activities include, but are not limited to, the following:

1. Schedule and sequence electrical activities.

2. Coordinate sharing access to workspaces.

3. Coordinate integration of work into limited spaces.

4. Coordinate protection of the work.

5. Coordinate cutting and patching for the work.

6. Prepare coordination drawings.

7. Coordinate tests and inspections for the work.

8. Coordinate temporary services and facilities.

PART 2 - PRODUCTS - Not Used.

PART 3 - EXECUTION - Not Used.

END OF SECTION