About this file

This is a Work Change Directive Form template developed by Herbert, Rowland & Grubic, Inc. (HRG) for use on the Alterations for Penn Township Municipal Building project in Pennsylvania. The form is designed to authorize contractors to proceed with work changes prior to final agreement on contract modifications. The directive applies to both Contract #1 (General Construction) and Contract #2 (Electrical Construction) for the Penn Township Municipal Building alterations project. Bids for the project were received online via the PennBid Program until 10:00 AM on September 3, 2026, with the Notice of Intent to Award scheduled for consideration by the Township Board of Supervisors on September 14, 2026. General Construction work includes demolition, sitework, concrete, general alteration construction, exterior replacement finishes, storefront glass, replacement doors, and associated work, while Electrical Construction work includes heating and lighting provisions for the new vestibule, rear entry, and side entry.

The Work Change Directive Form permits the contractor to proceed with changes to the work scope when non-agreement exists on pricing of proposed changes or when project schedule or other reasons necessitate immediate action. The form allows for preliminary, non-binding estimates of changes to contract price and contract time, with options to document the change as a lump sum, unit prices, cost of work, or other basis. Authorization signatures are required from the Engineer (HRG), Owner (Penn Township), and applicable Funding Agency representatives, along with dates of issuance and effectiveness. Supporting documentation and attachments detailing the scope and purpose of the change directive must be provided with the form submission.

View the file

Other files

File Type Posted
00 01 10 - Table of Contents.pdf PDF
00 01 01 - LA Cover - need date.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
01 12 00 - Multiple Contract Summary.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
2026.07.14 - H9 - Penn Twp Office - Bid Set - SEALED.pdf PDF
00 55 00 - Notice to Proceed.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 62 76 - App for Payment.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
2026.07.14 - H9 - Penn Twp Shop - Bid Set - SEALED.pdf PDF
01 77 00 - Closeout Procedures-R.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 72 00 - Standard General Conditions 2018.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 01 07 - Seal Page - Office Building.pdf PDF
00 63 36 - Field Order Form-R.pdf PDF
00 01 01 - LA Cover.pdf PDF
00 73 00 - Supplementary Conditions 2018.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 32 16 - Construction Progress Schedule.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 42 00 - References.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 63 49 - 1 006566.0459

WORK CHANGE DIRECTIVE NO. [X]

Date of Issuance: Effective Date: [DATE EXECUTED BY OWNER]

Owner: Contract No.:

Contractor: Contract Name:

Engineer: HRG Project No.:

Project:

Contractor is directed to proceed promptly with the following change(s):

Description: [Description of the change to the Work]

Attachments: [List documents supporting change]

Purpose for Work Change Directive: [Describe the purpose for the change to the Work]

Directive to proceed promptly with the Work described herein, prior to agreeing to changes on Contract Price and Contract Time, is issued due to:

Non-agreement on pricing of proposed change

Necessity to proceed for schedule or other Project reasons.

Estimated Change in Contract Price and Contract Times (non-binding, preliminary):

Contract Price: $ [increase] [decrease] [not yet estimated].

Contract Time: days [increase] [decrease] [not yet estimated].

Basis of determining change in Contract Price:

Lump Sum Unit Prices Cost of the Work Other

RECOMMENDED: AUTHORIZED BY: APPROVED (if applicable):

By: By: By:

Engineer (Authorized Signature) Owner (Authorized Signature) Funding Agency

Title: Title: Title:

Date: Date: Date:

File details come from the government source that posted it. Updated .