00 63 36 - Field Order Form.pdf
PDF 204 KB Posted
- Solicitation number
- Not on record
- Issued by
- Lancaster County, Pennsylvania
About this file
This Field Order Form document is associated with Penn Township's construction project for alterations to the Penn Township Municipal Building in Pennsylvania. The project encompasses two separate contracts: Contract #1 involves general construction work including demolition, sitework, concrete, general alteration construction, exterior replacement finishes, storefront glass, replacement doors, and associated work; Contract #2 covers electrical construction work to provide heating and lighting for the new vestibule, rear entry, and side entry. Bids for the project will be received online through the PennBid Program until 10:00 AM local time on September 3, 2026, with bids publicly displayed at that time. The Township Board of Supervisors will consider the Notice of Intent to Award at its September 14, 2026 meeting at the Township Office. Bidding documents are available for download at https://pennbid.bonfirehub.com/, and prospective bidders are urged to register as plan holders on the designated website, which will be updated periodically with addenda and other relevant project information.
The document emphasizes that all official notifications, addenda, and bidding documents will be provided exclusively through the designated PennBid website, with neither the owner nor engineer responsible for documents obtained from alternative sources. Interested parties should obtain complete bidding documentation from the official website to ensure they receive all current information and amendments necessary for accurate bid preparation.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Herbert, Rowland & Grubic, Inc. 00 63 36 - 1 006566.0459
Field Order No. [#]
Date Issued: Effective Date:
Owner: Owner’s Contract No.:
Engineer: Contractor’s Project No.:
Contractor: Engineer's Project No.:
Project: Contract Name:
Contractor is hereby directed to promptly execute this Field Order, issued in accordance with General Conditions Paragraph 11.01, for minor changes in the Work without changes in Contract Price or Contract Times. If Contractor considers that a change in Contract Price or Contract Times is required, submit a Change Proposal before proceeding with this Work.
Reference:
Specification(s) Drawing(s) / Detail(s)
Description:
Attachments:
ISSUED:
By:
Engineer (Authorized Signature)
Title:
Date:
Copy to: Owner