This is an Application for Payment document related to the Alterations for Penn Township Municipal Building project in Pennsylvania. The document is associated with a construction project that includes two primary contracts: Contract #1 for General Construction work encompassing demolition, sitework, concrete, general alteration construction, exterior replacement finishes, storefront glass, replacement doors, and associated work; and Contract #2 for Electrical Construction work providing heating and lighting for the new vestibule, rear entry, side entry, and other associated work. Bids for the construction project were received online via the PennBid Program with a deadline of 10:00 AM local time on September 3, 2026, with the Notice of Intent to Award to be considered by the Township Board of Supervisors at its September 14, 2026 meeting. Bidding documents were available for download at https://pennbid.bonfirehub.com/, with prospective bidders urged to register as plan holders on the designated website for updates on addenda, registered plan holder lists, reports, and other project-relevant information.

The Application for Payment document serves as a mechanism for contractors to request payment for work completed on the project. All official notifications, addenda, and bidding documents were made available exclusively through the designated PennBid website, with neither Penn Township (Owner) nor the Engineer assuming responsibility for bidding documents obtained from alternative sources. Prospective bidders were required to utilize the official website to ensure receipt of all current project information and modifications throughout the bidding and execution phases.

View the file

Other files

File Type Posted
00 01 10 - Table of Contents.pdf PDF
00 01 01 - LA Cover - need date.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
01 12 00 - Multiple Contract Summary.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
2026.07.14 - H9 - Penn Twp Office - Bid Set - SEALED.pdf PDF
00 55 00 - Notice to Proceed.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
2026.07.14 - H9 - Penn Twp Shop - Bid Set - SEALED.pdf PDF
01 77 00 - Closeout Procedures-R.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
00 72 00 - Standard General Conditions 2018.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 01 07 - Seal Page - Office Building.pdf PDF
00 63 36 - Field Order Form-R.pdf PDF
00 01 01 - LA Cover.pdf PDF
00 73 00 - Supplementary Conditions 2018.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 32 16 - Construction Progress Schedule.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 22 00 - Unit Prices.pdf PDF
01 42 00 - References.pdf PDF
00 63 63 - Change Order Form.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From

1.

2.

3.

4.

5.

a. X

b. X c.

6.

7.

8.

9.

Current Contract Price (Line 1 + Line 2)

Contractor:

Net change by Change Orders to

Original Contract Price

Total Work completed and materials stored to date

(Sum of Column G Lump Sum Total and Column J Unit Price Total)

Retainage

Work Completed

Stored Materials

Total Retainage (Line 5.a + Line 5.b)

Amount eligible to date (Line 4 - Line 5.c)

Less previous payments (Line 6 from prior application)

Amount due this application

Application Date:

Approved by Funding Agency

By:

Title:

Date:

By:

Title:

Date:

By:

Title:

Date:

By:

Title:

Date:

Signature: Date:

Contractor's Certification

Balance to finish, including retainage (Line 3 - Line 4 + Line 5c)

Approved by Owner

The undersigned Contractor certifies, to the best of its knowledge, the following:

(1) All previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by prior Applications for Payment;

(2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this

Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens, security interest, or encumbrances); and

(3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective.

Recommended by Engineer

Contractor's Application for Payment

Application No.:

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Application Period:

Contract:

Owner:

Contractor:

Engineer:

Project:

EJCDC C-620 Contractor's Application for Payment

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.

Owner:

Engineer:

Contractor:

Project:

Contract:

Application No.: From to

A C D E F G H I

(D + E) From

Previous

Application

This Period

-$ -$ -$ -$ -$ -$ Original Contract Totals

Work Completed

Item No. Description

Scheduled Value

Application Period: Application Date:

Progress Estimate - Lump Sum Work Contractor's Application for Payment

Owner's Project No.:

B

Original Contract

% of Scheduled

Value (G / C)

Balance to Finish (C

- G)

Materials Currently

Stored (not in D or

E)

Work Completed and Materials

Stored to Date

(D + E + F)

Engineer's Project No.:

Contractor's Project No.:

Lump Sum

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 2 of 6

Contractor:

Project:

Contract:

Application No.: From to

A C D E F G H I

(D + E) From

Previous

Application

This Period

Work Completed

Item No. Description

Scheduled Value

Application Period: Application Date:

Progress Estimate - Lump Sum Work Contractor's Application for Payment

Owner's Project No.:

B

% of Scheduled

Value (G / C)

Balance to Finish (C

- G)

Materials Currently

Stored (not in D or

E)

Work Completed and Materials

Stored to Date

(D + E + F)

Engineer's Project No.:

Contractor's Project No.:

Change Order Totals

Project Totals

Original Contract and Change Orders

Change Orders

Lump Sum

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 3 of 6

From to

A C D E F G H I J K L

Item Quantity Units

Unit Price

Value of Bid Item

(C X E)

Estimated

Quantity

Incorporated in the Work

Value of Work

Completed to Date

(E X G)

-$ -$ -$ -$ -$ Original Contract Totals

B

Original Contract

% of

Value of

Item

(J / F)

Balance to Finish (F

- J)

($)Description

Work Completed

Materials Currently

Stored (not in G)

Work Completed and Materials

Stored to Date

(H + I)

Contract Information

Bid Item

No.

Engineer:

Contractor:

Project:

Contract:

Application Date:Application Period:Application No.:

Contractor's Application for PaymentProgress Estimate - Unit Price Work

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Owner:

Unit Price

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 4 of 6

From to

A C D E F G H I J K L

Item Quantity Units

Unit Price

Value of Bid Item

(C X E)

Estimated

Quantity

Incorporated in the Work

Value of Work

Completed to Date

(E X G)

B

% of

Value of

Item

(J / F)

Balance to Finish (F

- J)

($)Description

Work Completed

Materials Currently

Stored (not in G)

Work Completed and Materials

Stored to Date

(H + I)

Contract Information

Bid Item

No.

Engineer:

Contractor:

Project:

Contract:

Application Date:Application Period:Application No.:

Contractor's Application for PaymentProgress Estimate - Unit Price Work

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Owner:

Change Order Totals

Original Contract and Change Orders

Change Orders

Project Totals

Unit Price

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 5 of 6

Contractor:

Project:

Contract:

Application No.: Application Period: From to

A B C D E F G H I J K L M

Previous Amount

Stored

Amount Stored this

Period

Amount Stored to

Date (G+H)

Amount Previously

Incorporated in the

Work

Amount

Incorporated in the

Work this Period

Total Amount

Incorporated in the

Work

(J+K)

Stored Materials Summary

Totals

Storage Location

Description of Materials or

Equipment Stored

Submittal No.

(with

Specification

Section No.)

Supplier

Invoice No.

Item No.

(Lump Sum Tab) or Bid Item No.

(Unit Price Tab)

Application Date:

Contractor's Application for Payment

Materials Stored Incorporated in Work

Materials

Remaining in

Storage

(I-L)

Application

No. When

Materials

Placed in

Storage

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Stored Materials

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 6 of 6