00 65 16 - Certificate of Substantial Completion.pdf
PDF 250 KB Posted
- Attached to
- Biosolids Project 011139.0465
- Solicitation number
- US.260443
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a Certificate of Substantial Completion prepared by Herbert, Rowland & Grubic, Inc., an engineer, for the Ephrata Borough Authority's Biosolids Improvements Project. The certificate, based on the modified EJCDC C-625 form, documents that authorized representatives of the Owner, Contractor, and Engineer have inspected the Work and found it to be substantially complete. The document covers two separate construction contracts: Contract No. EBA26-2 for General Construction and Contract No. EBA26-3 for Electrical Construction. The project involves coordination and interconnection of two new owner-procured Biodryers, demolition and replacement of dewatered solids conveyor systems, selective wall demolition and replacement, indoor utility replacements, site piping replacement and relocation, a dumpster loading canopy, and associated electrical improvements. The Date of Substantial Completion establishes the commencement of the contractual correction period and applicable warranties as required by the Contract Documents. A punch list of items to be completed or corrected is attached to this Certificate, though it may not be all-inclusive and does not alter the Contractor's responsibility to complete all Work in accordance with the Contract Documents.
The Certificate specifies that amendments to both Owner and Contractor responsibilities regarding security, operation, safety, maintenance, heat, utilities, insurance, and warranties are noted as "None," indicating no modifications to the standard contractual obligations. The Certificate explicitly states that it does not constitute acceptance of Work not in accordance with the Contract Documents, nor does it release the Contractor's obligation to complete all Work as specified. The document requires execution by the Engineer through authorized signature, with spaces provided for the signatory's name and title. No pricing terms, set-asides, or funding information is contained within this Certificate of Substantial Completion document.
View the file
Other files
Show 40 more
Latest 50 of 125 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modified EJCDC® C-625, Certificate of Substantial Completion. Prepared and published 2018 by the Engineers Joint Contract Documents Committee.
Herbert, Rowland & Grubic, Inc. 00 65 16 - 1 011139.0465
CERTIFICATE OF SUBSTANTIAL COMPLETION
Owner: Ephrata Borough Authority Owner's Contract No.:
Contractor: Contractor’s Project No.:
Engineer: Herbert, Rowland and Grubic, Inc. Engineer's Project No.: 011139.0465
Project: Biosolids Improvements Project Contract No. EBA26-2 – General Construction Contract No. EBA26-3 – Electrical Construction
Contract Name:
This ☐ Preliminary ☐ Final Certificate of Substantial Completion applies to:
All Work The following specified portions of the Work:
Date of Substantial Completion:
The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and Engineer, and found to be substantially complete. The Date of Substantial Completion of the Work or portion thereof designated above is hereby established, subject to the provisions of the Contract pertaining to Substantial Completion.
The date of Substantial Completion in the final Certificate of Substantial Completion marks the commencement of the contractual correction period and applicable warranties required by the Contract.
A punch list of items to be completed or corrected is attached to this Certificate. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.
Amendments of contractual responsibilities recorded in this Certificate should be the product of mutual agreement of Owner and Contractor; see Paragraph 15.03.D of the General Conditions.
The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, insurance, and warranties upon Owner's use or occupancy of the Work must be as provided in the Contract, except as amended as follows:
Amendments to Owner's responsibilities: None As follows
Amendments to Contractor's responsibilities: None As follows:
The following documents are attached to and made a part of this Certificate:
This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents, nor is it a release of Contractor's obligation to complete the Work in accordance with the Contract.
EXECUTED BY ENGINEER:
By:
(Authorized signature)
Name:
Title: