00 62 76 - App for Payment.pdf

PDF 166 KB Posted

Attached to
Biosolids Project 011139.0465
Solicitation number
US.260443
Issued by
Lancaster County, Pennsylvania

About this file

This is a Contractor's Application for Payment form (EJCDC C-620) used to request progress payments on a construction contract for the Biosolids Project 011139.0465 administered by Ephrata Borough Authority in Pennsylvania. The form is designed to document work completed and materials stored during a specified application period, with separate sections for lump sum work and unit price work. The application allows contractors to report the original contract price, changes made through change orders, total work completed and materials stored to date, retainage amounts, previous payments received, and the amount due for the current application period. The form requires certification from the contractor that all previous payments have been properly applied to legitimate obligations, that title to all work and materials will pass to the owner free of liens and encumbrances, and that all work complies with contract documents and is not defective. Multiple approval signatures are required from the contractor, engineer, owner, and funding agency representatives.

The application form includes comprehensive tracking mechanisms for project costs and progress, with columns for scheduled values, work completed both in prior applications and during the current period, percentage of scheduled value completion, balance to finish, and materials currently stored. A separate stored materials summary section documents items placed in storage, including submittal numbers, supplier invoice numbers, incorporation dates, and remaining storage amounts. All amounts on the form default to zero unless specific project values are entered, indicating this is a blank template awaiting completion for individual project applications. The form serves as the standard documentation method for contractors to request payment from owners during the construction phase of projects.

View the file

Other files

File Type Posted
26 08 00 - Electrical Field Acceptance Tests.pdf PDF
00 63 25 - Substitution Request Form (During Construction).pdf PDF
40 05 36 - Fiberglass-Reinforced Plastic Process Pipe.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 60 00 - Project Forms.pdf PDF
26 29 23 - VFDs .pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
26 05 19 - Conductors.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
05 53 00 - Metal Gratings (VPR).pdf PDF
02 41 19.13 - Selective Building Demolition (VPR).pdf PDF
01 29 00 - Payment Procedures.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
01 64 00 - Owner Furnished Products.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 25 00 - Erosion And Sedimentation Controls.pdf PDF
40 05 65.23 - Swing Check Valves.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
05 50 00 - Metal Fabrications (VPR).pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
26 09 16 - Auxiliary Controls & Relays.pdf PDF
01 10 00 - Project Summary.pdf PDF
05 52 00 - Metal Railings (VPR).pdf PDF
26 24 19 - MCC.pdf PDF
26 05 53 - Electrical System Identification.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 60 00 - Grouting (VPR).pdf PDF
01 61 00 - Product Requirements.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 31 00a Ephrata Boro Record Drawings.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
26 27 16 - Control Panels & Enclosures.pdf PDF
26 05 26 - Grounding.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 01 01 - LA Cover.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
32 92 19 - Seeding.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
05 31 23 - Steel Roof Decking (VPR).pdf PDF
00 52 00b - Agmnt btw Own and Cntr for Const Con Stip Price - Electrical Construction.pdf PDF
Show 40 more

Latest 50 of 125 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From

1.

2.

3.

4.

5.

a. X

b. X c.

6.

7.

8.

9.

Current Contract Price (Line 1 + Line 2)

Contractor:

Net change by Change Orders to

Original Contract Price

Total Work completed and materials stored to date

(Sum of Column G Lump Sum Total and Column J Unit Price Total)

Retainage

Work Completed

Stored Materials

Total Retainage (Line 5.a + Line 5.b)

Amount eligible to date (Line 4 - Line 5.c)

Less previous payments (Line 6 from prior application)

Amount due this application

Application Date:

Approved by Funding Agency

By:

Title:

Date:

By:

Title:

Date:

By:

Title:

Date:

By:

Title:

Date:

Signature: Date:

Contractor's Certification

Balance to finish, including retainage (Line 3 - Line 4 + Line 5c)

Approved by Owner

The undersigned Contractor certifies, to the best of its knowledge, the following:

(1) All previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by prior Applications for Payment;

(2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this

Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens, security interest, or encumbrances); and

(3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective.

Recommended by Engineer

Contractor's Application for Payment

Application No.:

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Application Period:

Contract:

Owner:

Contractor:

Engineer:

Project:

EJCDC C-620 Contractor's Application for Payment

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.

Owner:

Engineer:

Contractor:

Project:

Contract:

Application No.: From to

A C D E F G H I

(D + E) From

Previous

Application

This Period

-$ -$ -$ -$ -$ -$ Original Contract Totals

Work Completed

Item No. Description

Scheduled Value

Application Period: Application Date:

Progress Estimate - Lump Sum Work Contractor's Application for Payment

Owner's Project No.:

B

Original Contract

% of Scheduled

Value (G / C)

Balance to Finish (C

- G)

Materials Currently

Stored (not in D or

E)

Work Completed and Materials

Stored to Date

(D + E + F)

Engineer's Project No.:

Contractor's Project No.:

Lump Sum

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 2 of 6

Contractor:

Project:

Contract:

Application No.: From to

A C D E F G H I

(D + E) From

Previous

Application

This Period

Work Completed

Item No. Description

Scheduled Value

Application Period: Application Date:

Progress Estimate - Lump Sum Work Contractor's Application for Payment

Owner's Project No.:

B

% of Scheduled

Value (G / C)

Balance to Finish (C

- G)

Materials Currently

Stored (not in D or

E)

Work Completed and Materials

Stored to Date

(D + E + F)

Engineer's Project No.:

Contractor's Project No.:

Change Order Totals

Project Totals

Original Contract and Change Orders

Change Orders

Lump Sum

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 3 of 6

Contractor:

Project:

Contract:

Application No.: Application Period: From to

A B C D E F G H I J K L M

Previous Amount

Stored

Amount Stored this

Period

Amount Stored to

Date (G+H)

Amount Previously

Incorporated in the

Work

Amount

Incorporated in the

Work this Period

Total Amount

Incorporated in the

Work

(J+K)

Stored Materials Summary

Totals

Storage Location

Description of Materials or

Equipment Stored

Submittal No.

(with

Specification

Section No.)

Supplier

Invoice No.

Item No.

(Lump Sum Tab) or Bid Item No.

(Unit Price Tab)

Application Date:

Contractor's Application for Payment

Materials Stored Incorporated in Work

Materials

Remaining in

Storage

(I-L)

Application

No. When

Materials

Placed in

Storage

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Stored Materials

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 6 of 6

File details come from the government source that posted it. Updated .