Performance Work Statement for Demolition of Building 10427 Attachment 3_ List of Deliverables (AF Form 66).pdf
Air Force Form PDF 53 KB Posted
- Attached to
- Demolition of Bldg 53 and Bldg 10427
- Solicitation number
- FA500020Q0033
About this file
This document is a schedule of material submittals form for a federal contract to demolish two buildings at Joint Base Elmendorf Richardson in Alaska. The contract requires demolition of Building 53 by January 2021 according to the specifications in Performance Work Statement HJZH 20-1003, and demolition of Building 10427 by April 2022 per the requirements in Performance Work Statement FXSB 11-1001.
The schedule of submittals lists 24 required documents for submittal to the contracting office at dates ranging from 10 days to 30 days prior to the start of demolition work. This includes hazard mitigation plans, waste disposal plans, safety data sheets, training records, and daily reports during performance. The Air Force Pacific Air Forces is the contracting agency for the demolition of these two buildings.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66 (Computer Generated) PAGE 1 of 6
PROJECT NUMBER : PROJECT TITLE: SOLICITATIO
SCHEDULE OF MATERIAL SUBMITTALS FXSB 11-1001
Demolish Building 10427
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINIST
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
APPROVED DIS-
APPROVED
HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5.
x
NLT 10 working days prior to material being brought onto installation
2 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5.
x NLT 7 Working Days After Final Acceptance
3 Quality Control Plan x
6 LEAD WASTE MANAGEMENT
PLAN (If needed)
7 *Submittal x x
8 1.3.2
9 ASBESTOS ABATEMENT WORK
PLAN (If needed) x
10 *Submittal x
20 Days Prior to work start
30 Days prior to abatement work start
30 Days Prior to work start
AF FORM 66 (Computer Generated) PAGE 2 of 6
PROJECT NUMBER : PROJECT TITLE: SOLICITATIO
SCHEDULE OF MATERIAL SUBMITTALS FXSB 11-1001
Demolish Building 10427
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINIST
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
APPROVED DIS-
APPROVED
11 1.3.2
12 Disposal of Lead Containing Material (If needed) x
AF FORM 66 (Computer Generated) PAGE 3 of 6
PROJECT NUMBER : PROJECT TITLE: SOLICITATIO
SCHEDULE OF MATERIAL SUBMITTALS FXSB 11-1001
Demolish Building 10427
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINIST
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
APPROVED DIS-
APPROVED
13 *REQUIREMENTS x
14 1.3.4
Hazardous material Sampling and analysis plan and schedule. (If x
16 Requirements x
17 1.5
18 Record of Training for Contractor Employees x
19 *REQUIREMENTS x
20 1.5.2
21 Daily Reports
22 *REQUIREMENTS x
23 1.6.1
24 Safety Data Sheets (SDSs) x x
30 Days Prior to work start
30 Days Prior to work start
30 Days Prior to work start
Daily upon award of contract
AF FORM 66 (Computer Generated) PAGE 4 of 6
ON/CONTRACT NO.:
TRATOR
REMARKS
AF FORM 66 (Computer Generated) PAGE 5 of 6
ON/CONTRACT NO.:
AF FORM 66 (Computer Generated) PAGE 6 of 6
ON/CONTRACT NO.:
AF66- Material Submittals
File details come from the government source that posted it. Updated .