Determination of Liquidated Damages.pdf

PDF 35 KB Posted

Attached to
Demolition of Bldg 53 and Bldg 10427
Solicitation number
FA500020Q0033
Issued by

About this file

This document contains a determination of liquidated damages for a civil engineering office and details of a federal contract opportunity for demolition services. The determination specifies that liquidated damages for delays in completing delivery orders beyond scheduled dates would be $312.87 per day, calculated based on estimated costs of two hours per day at specified hourly rates for an inspector, project engineer, and chief of engineering.

The federal contract opportunity is a solicitation to provide demolition services for Building 53 and Building 10427 at Joint Base Elmendorf Richardson. The services include demolishing the buildings to meet specifications in the respective Performance Work Statements. The solicitation number is FA500020Q0033 and was issued by the Department of the Air Force Pacific Air Forces.

View the file

Other files

File Type Posted
Solicitation Amendment FA500020Q00330002 SF 30.pdf PDF
MFR for Solicitation FA500020Q0033 Question and Answers.pdf PDF
Solicitation Amendment FA500020Q00330001 SF 30.pdf PDF
Solicitation Amendment FA500020Q00330001 SF 30.pdf PDF
MFR for Solicitation FA500020Q0033 Question and Answers.pdf PDF
Performance Work Statement for Bldg 10427 Demo.pdf PDF
Performance Work Statement for Bldg 53 Demo.pdf PDF
Open Market Construction Contract General Specifications and Contract Provisions.pdf PDF
Performance Work Statement for Demolition of Building 53 Attachment 2_ Exisiting Condition Pictures.pdf PDF
JBER Telecommunications Installation Standards.pdf PDF
Solicitation - FA500020Q0033.pdf PDF
Performance Work Statement for Demolition of Building 10427 Attachment 3_ List of Deliverables (AF Form 66).pdf PDF
SCA Wage Determination No 2015-5681.pdf PDF
Performance Work Statement for Demolition of Building 10427 Attachment 1_ Project Drawings.pdf PDF
Performance Work Statement for Demolition of Building 10427 Attachment 2_ Existing Condition Pictures.pdf PDF
Performance Work Statement for Demolition of Building 53 Attachment 4_ Utility Demo.pdf PDF
Performance Work Statement for Demolition of Building 53 Attachment 3_ List of Deliverables (AF Form 66).pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January 2020

OPEN MARKET CONTRACT

DETERMINATION OF LIQUIDATED DAMAGES:

The estimated damages for the Civil Engineering Office for each day of delay per delivery order beyond the delivery order completion date are:

1. Inspector 2 hours/day @ $55.27/hour = $110.54

2. Project Engineer 2 hours/day @ $58.64/hour = $117.28

3. Chief of Engineering 1 hour/day @ $85.05/hour = $85.05

Total Civil Engineering Cost = $312.87