Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls
XLS spreadsheet 136 KB Posted
- Solicitation number
- FA8501-17-R-0001
About this file
Revised Attachment 8 Blank SF Form 3052
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER - 1
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 1 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | COVER SHEET | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | GENERAL CONDITIONS - 1 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | $0 | $0 |
| 4.0 | $0 | $0 | ||||||||||
| 5.0 | CIVIL CONSTRUCTION - 1 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | $0 | $0 |
| 6.0 | ||||||||||||
| 7.0 | CIVIL CONSTRUCTION - 2 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | ||
| 8.0 | $0 | $0 | ||||||||||
| 9.0 | STRUCTURAL CONSTRUCTION - 1 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | $0.00 | $0 |
| 10.0 | $0 | $0 | ||||||||||
| 11.0 | STRUCTURAL CONSTRUCTION - 2 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0.00 | $0 | ||
| 12.0 | ||||||||||||
| 13.0 | ARCHITECTURAL CONSTRUCTION - 1 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0.00 | $0 | ||
| 14.0 | ||||||||||||
| 15.0 | HVAC - FP -1 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | $0.00 | $0 |
| 16.0 | ||||||||||||
| 17.0 | ELECTRICAL CONSTRUCTION - 1 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | $0.00 | $0 |
| 18.0 | ||||||||||||
| 19.0 | ELECTRICAL CONSTRUCTION - 2 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | $0.00 | $0 |
| 20.0 | ||||||||||||
| 21.0 | ELECTRICAL CONSTRUCTION - 3 | sqft | 0.0 | $0.00 | $0 | 0.0 | $0.00 | $0 | $0 | $0 | $0.00 | $0 |
| 22.0 | ||||||||||||
| 23.0 | ||||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | ||||||||||||
| 27.0 | ||||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 1.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
GC 1
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 2 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | GENERAL CONDITIONS - 1 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | General Conditions | |||||||||||
| 4.0 | $0 | |||||||||||
| 5.0 | $0 | |||||||||||
| 6.0 | $0 | |||||||||||
| 7.0 | $0 | |||||||||||
| 8.0 | $0 | |||||||||||
| 9.0 | $0 | |||||||||||
| 10.0 | $0 | |||||||||||
| 11.0 | $0 | |||||||||||
| 12.0 | $0 | |||||||||||
| 13.0 | $0 | |||||||||||
| 14.0 | $0 | |||||||||||
| 15.0 | $0 | |||||||||||
| 16.0 | $0 | |||||||||||
| 17.0 | $0 | |||||||||||
| 18.0 | $0 | |||||||||||
| 19.0 | ||||||||||||
| 20.0 | ||||||||||||
| 21.0 | ||||||||||||
| 22.0 | ||||||||||||
| 23.0 | ||||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | ||||||||||||
| 27.0 | ||||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 2.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
CIVIL - 1
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 3 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | CIVIL CONSTRUCTION - 1 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | $0.00 | |||||||||||
| 8.0 | $0.00 | |||||||||||
| 9.0 | $0.00 | |||||||||||
| 10.0 | $0.00 | |||||||||||
| 11.0 | $0.00 | |||||||||||
| 12.0 | ||||||||||||
| 13.0 | ||||||||||||
| 14.0 | $0.00 | |||||||||||
| 15.0 | $0.00 | |||||||||||
| 16.0 | $0.00 | |||||||||||
| 17.0 | $0.00 | |||||||||||
| 18.0 | $0.00 | |||||||||||
| 19.0 | $0.00 | |||||||||||
| 20.0 | $0.00 | |||||||||||
| 21.0 | $0.00 | |||||||||||
| 22.0 | $0.00 | |||||||||||
| 23.0 | $0.00 | |||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | $0.00 | |||||||||||
| 27.0 | $0.00 | |||||||||||
| 28.0 | $0.00 | |||||||||||
| 29.0 | $0.00 | |||||||||||
| 30.0 | $0.00 | |||||||||||
| Railing, 2 rail, 1-1/2" dia, HD Galv. | Page | 3.0 | Materials | $0 | 0.0 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
CIVIL - 2
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 4 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | CIVIL CONSTRUCTION - 2 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | $0.00 | |||||||||||
| 8.0 | $0.00 | |||||||||||
| 9.0 | $0.00 | |||||||||||
| 10.0 | ||||||||||||
| 11.0 | ||||||||||||
| 12.0 | $0.00 | |||||||||||
| 13.0 | $0.00 | |||||||||||
| 14.0 | ||||||||||||
| 15.0 | ||||||||||||
| 16.0 | ||||||||||||
| 17.0 | ||||||||||||
| 18.0 | ||||||||||||
| 19.0 | ||||||||||||
| 20.0 | ||||||||||||
| 21.0 | ||||||||||||
| 22.0 | ||||||||||||
| 23.0 | ||||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | ||||||||||||
| 27.0 | ||||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 4.0 | Materials | $0 | 0.0 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
STRUCT - 1
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 5 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | STRUCTURAL CONSTRUCTION - 1 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | $0.00 | |||||||||||
| 8.0 | $0.00 | |||||||||||
| 9.0 | $0.00 | |||||||||||
| 10.0 | $0.00 | |||||||||||
| 11.0 | $0.00 | |||||||||||
| 12.0 | ||||||||||||
| 13.0 | ||||||||||||
| 14.0 | $0.00 | |||||||||||
| 15.0 | $0.00 | |||||||||||
| 16.0 | $0.00 | |||||||||||
| 17.0 | $0.00 | |||||||||||
| 18.0 | $0.00 | |||||||||||
| 19.0 | $0.00 | |||||||||||
| 20.0 | $0.00 | |||||||||||
| 21.0 | $0.00 | |||||||||||
| 22.0 | $0.00 | |||||||||||
| 23.0 | ||||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | ||||||||||||
| 27.0 | ||||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 5.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
STRUCT - 2
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 6 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | STRUCTURAL CONSTRUCTION - 2 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | $0.00 | |||||||||||
| 8.0 | $0.00 | |||||||||||
| 9.0 | $0.00 | |||||||||||
| 10.0 | $0.00 | |||||||||||
| 11.0 | $0.00 | |||||||||||
| 12.0 | $0.00 | |||||||||||
| 13.0 | $0.00 | |||||||||||
| 14.0 | $0.00 | |||||||||||
| 15.0 | ||||||||||||
| 16.0 | ||||||||||||
| 17.0 | ||||||||||||
| 18.0 | ||||||||||||
| 19.0 | ||||||||||||
| 20.0 | ||||||||||||
| 21.0 | ||||||||||||
| 22.0 | ||||||||||||
| 23.0 | ||||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | ||||||||||||
| 27.0 | ||||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 6.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
Arch - 1
| CONSTRUCTION CBREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 7 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | ARCHITECTURAL CONSTRUCTION - 1 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | $0.00 | |||||||||||
| 8.0 | $0.00 | |||||||||||
| 9.0 | $0.00 | |||||||||||
| 10.0 | $0.00 | |||||||||||
| 11.0 | ||||||||||||
| 12.0 | ||||||||||||
| 13.0 | $0.00 | |||||||||||
| 14.0 | $0.00 | |||||||||||
| 15.0 | $0.00 | |||||||||||
| 16.0 | $0.00 | |||||||||||
| 17.0 | ||||||||||||
| 18.0 | ||||||||||||
| 19.0 | ||||||||||||
| 20.0 | ||||||||||||
| 21.0 | ||||||||||||
| 22.0 | ||||||||||||
| 23.0 | ||||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | ||||||||||||
| 27.0 | ||||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 7.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
HVAC-FP-1
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 8 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - GENERAL CONDITIONS | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | HVAC - FP -1 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | $0.00 | |||||||||||
| 8.0 | $0.00 | |||||||||||
| 9.0 | ||||||||||||
| 10.0 | ||||||||||||
| 11.0 | $0.00 | |||||||||||
| 12.0 | ||||||||||||
| 13.0 | ||||||||||||
| 14.0 | ||||||||||||
| 15.0 | ||||||||||||
| 16.0 | ||||||||||||
| 17.0 | ||||||||||||
| 18.0 | ||||||||||||
| 19.0 | ||||||||||||
| 20.0 | ||||||||||||
| 21.0 | ||||||||||||
| 22.0 | ||||||||||||
| 23.0 | ||||||||||||
| 24.0 | ||||||||||||
| 25.0 | ||||||||||||
| 26.0 | ||||||||||||
| 27.0 | ||||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 8.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0 | $0 | |||||||
| GC | OverHead | $0 | ||||||||||
| SubTotal | $0 | |||||||||||
| GC | Profit | $0 | ||||||||||
| Subtotal | $0 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0 | ||||||||
| Subtotal | $0 | Subtotal | $0 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0 | ||||||||
| $0 | Grand Total | $0 |
Elect - 1
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 9 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - ELECTRICAL | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | ELECTRICAL CONSTRUCTION - 1 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | $0.00 | |||||||||||
| 8.0 | $0.00 | |||||||||||
| 9.0 | $0.00 | |||||||||||
| 10.0 | $0.00 | |||||||||||
| 11.0 | $0.00 | |||||||||||
| 12.0 | $0.00 | |||||||||||
| 13.0 | ||||||||||||
| 14.0 | ||||||||||||
| 15.0 | $0.00 | |||||||||||
| 16.0 | $0.00 | |||||||||||
| 17.0 | $0.00 | |||||||||||
| 18.0 | $0.00 | |||||||||||
| 19.0 | $0.00 | |||||||||||
| 20.0 | $0.00 | |||||||||||
| 21.0 | ||||||||||||
| 22.0 | ||||||||||||
| 23.0 | $0.00 | |||||||||||
| 24.0 | $0.00 | |||||||||||
| 25.0 | $0.00 | |||||||||||
| 26.0 | $0.00 | |||||||||||
| 27.0 | $0.00 | |||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 9.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0.00 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0.00 | $0.00 | |||||||
| GC | OverHead | $0.00 | ||||||||||
| SubTotal | $0.00 | |||||||||||
| GC | Profit | $0.00 | ||||||||||
| Subtotal | $0.00 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0.00 | ||||||||
| Subtotal | $0 | Subtotal | $0.00 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0.00 | ||||||||
| $0 | Grand Total | $0.00 |
Elect - 2
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 10 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - ELECTRICAL | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | ELECTRICAL CONSTRUCTION - 2 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0.00 | |||||||||||
| 5.0 | $0.00 | |||||||||||
| 6.0 | $0.00 | |||||||||||
| 7.0 | ||||||||||||
| 8.0 | ||||||||||||
| 9.0 | $0.00 | |||||||||||
| 10.0 | $0.00 | |||||||||||
| 11.0 | $0.00 | |||||||||||
| 12.0 | $0.00 | |||||||||||
| 13.0 | $0.00 | |||||||||||
| 14.0 | $0.00 | |||||||||||
| 15.0 | $0.00 | |||||||||||
| 16.0 | $0.00 | |||||||||||
| 17.0 | $0.00 | |||||||||||
| 18.0 | $0.00 | |||||||||||
| 19.0 | ||||||||||||
| 20.0 | ||||||||||||
| 21.0 | $0.00 | |||||||||||
| 22.0 | $0.00 | |||||||||||
| 23.0 | $0.00 | |||||||||||
| 24.0 | $0.00 | |||||||||||
| 25.0 | $0.00 | |||||||||||
| 26.0 | $0.00 | |||||||||||
| 27.0 | $0.00 | |||||||||||
| 28.0 | ||||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 10.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0.00 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0.00 | $0.00 | |||||||
| GC | OverHead | $0.00 | ||||||||||
| SubTotal | $0.00 | |||||||||||
| GC | Profit | $0.00 | ||||||||||
| Subtotal | $0.00 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0.00 | ||||||||
| Subtotal | $0 | Subtotal | $0.00 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0.00 | ||||||||
| $0 | Grand Total | $0.00 |
Elect - 3
| CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHED | Page | 11 | ||||||||||
| CONTRACTOR: | ADDRESS | *** Put Contractor's Address Here | ||||||||||
| CONTRACT FOR: | ||||||||||||
| PROJECT NUMBER: | Dis-Advantage | |||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | Buisness | 0.0% | ||||||||
| Material Tax: | 0.0% | Labor Burden: | 0.0% | *Overhead: | 0.0% | *Profit: | 0.0% | *Bid Bond | 0.0% | |||
| (1) | (2) | (3) | MATERIAL | LABOR | (9) | (10) | ||||||
| UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | ||||||
| LINE | OF | PER | Man | Avg. | DIRECT | LINE | ||||||
| NO. | ITEM - ELECTRICAL | MEASURE | QUANTITY | UNIT | TOTAL | Hours | Rate | TOTAL | COSTS | TOTAL | ||
| =(3) X (4) | = (6) X (7) | =(5) + (8) + (9) | ||||||||||
| 1.0 | ELECTRICAL CONSTRUCTION - 3 | sqft | 0.0 | |||||||||
| 2.0 | ||||||||||||
| 3.0 | ||||||||||||
| 4.0 | $0 | |||||||||||
| 5.0 | $0 | |||||||||||
| 6.0 | $0 | |||||||||||
| 7.0 | $0 | |||||||||||
| 8.0 | $0 | |||||||||||
| 9.0 | $0 | |||||||||||
| 10.0 | $0 | |||||||||||
| 11.0 | $0 | |||||||||||
| 12.0 | $0 | |||||||||||
| 13.0 | $0 | |||||||||||
| 14.0 | $0 | |||||||||||
| 15.0 | $0 | |||||||||||
| 16.0 | ||||||||||||
| 17.0 | ||||||||||||
| 18.0 | $0 | |||||||||||
| 19.0 | $0 | |||||||||||
| 20.0 | $0 | |||||||||||
| 21.0 | $0 | |||||||||||
| 22.0 | $0 | |||||||||||
| 23.0 | $0 | |||||||||||
| 24.0 | $0 | |||||||||||
| 25.0 | $0 | |||||||||||
| 26.0 | $0 | |||||||||||
| 27.0 | $0 | |||||||||||
| 28.0 | $0 | |||||||||||
| 29.0 | ||||||||||||
| 30.0 | ||||||||||||
| 0.0 | Page | 11.0 | Materials | $0 | 0.00 | Labor | $0 | $0 | $0.00 | |||
| Sales Tax | $0 | Labor Burden | $0 | |||||||||
| Subtotal | $0 | Subtotal | $0 | $0.00 | $0.00 | |||||||
| GC | OverHead | $0.00 | ||||||||||
| SubTotal | $0.00 | |||||||||||
| GC | Profit | $0.00 | ||||||||||
| Subtotal | $0.00 | |||||||||||
| 0.0 | Buisness | $0 | $0 | $0.00 | ||||||||
| Subtotal | $0 | Subtotal | $0.00 | |||||||||
| Project | Bid Bond | $0 | Bid Bond | $0.00 | ||||||||
| $0 | Grand Total | $0.00 |
File details come from the government source that posted it. Updated .