Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls

XLS spreadsheet 136 KB Posted

Attached to
Civil Engineering Multiple Award Construction Contract (CEMACC)
Solicitation number
FA8501-17-R-0001
Issued by

About this file

Revised Attachment 8 Blank SF Form 3052

View the file

Other files

File Type Posted
RFI__6__-_17_Feb_17.docx DOCX document
Notice_to_Offerors_Attachment_8.docx DOCX document
CEMACC_RFI__6.docx DOCX document
RFI__5_and_Note_to_Offerors.docx DOCX document
RFI.docx DOCX document
Amendment_2_CEMACC.pdf PDF
RFI__4_Questions_and_Answers_updated_7_Feb_17.docx DOCX document
Bldg 140 Existing Mezz HVAC Unit to be demoed_01.jpg JPG image
N27_Site_Plan.pdf PDF
Lighting Panel in adjacent fabric structure.JPG JPG image
YKAA-FP0001_BLDG_140_MAIN_FLOOR.dwg DWG drawing
N27 Utility Pit_03.JPG JPG image
Bldg 140 Existing Mezz GE plug-in busway.jpg JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
N27 Utility Pit_01.JPG JPG image
N27 Utility Pit_02.JPG JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_01.jpg JPG image
RFI__3_For_FBO_Post_27_Jan_2017.docx DOCX document
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
UHHZ_150376_C17_Fabric_Shelter_LAYOUT_SECTION.pdf PDF
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
Bldg 149 Addition existing Electrical Panel HAA.jpg JPG image
Bldg 149 Addition existing Electrical Panel HAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_04.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_02.jpg JPG image
N27_Utility_Pit_Detail_Sheet_print_on_11_x_17_size_paper.pdf PDF
Lift_Station_adjacent_to_Bldg_149.tif TIF image
FA8501-17-R-0001-0001_(AMENDMENT).pdf PDF
Bldg 149 Addition existing stepdown transformer.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
RFI_'s__2_20-Jan-2017.docx DOCX document
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
Sign_In_Sheet,_Site_Visit_Slides.pdf PDF
RFI__1.docx DOCX document
Bldg_149_As-Built_AutoCAD_Files.zip ZIP file
Atch__14_Wage_Determination_Highway.pdf PDF
Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__15_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__31_UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_As-Built_Drawings_combined.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER - 1

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage1
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0COVER SHEETsqft0.0
2.0
3.0GENERAL CONDITIONS - 1sqft0.0$0.00$00.0$0.00$0$0$0$0$0
4.0$0$0
5.0CIVIL CONSTRUCTION - 1sqft0.0$0.00$00.0$0.00$0$0$0$0$0
6.0
7.0CIVIL CONSTRUCTION - 2sqft0.0$0.00$00.0$0.00$0$0$0
8.0$0$0
9.0STRUCTURAL CONSTRUCTION - 1sqft0.0$0.00$00.0$0.00$0$0$0$0.00$0
10.0$0$0
11.0STRUCTURAL CONSTRUCTION - 2sqft0.0$0.00$00.0$0.00$0$0.00$0
12.0
13.0ARCHITECTURAL CONSTRUCTION - 1sqft0.0$0.00$00.0$0.00$0$0.00$0
14.0
15.0HVAC - FP -1sqft0.0$0.00$00.0$0.00$0$0$0$0.00$0
16.0
17.0ELECTRICAL CONSTRUCTION - 1sqft0.0$0.00$00.0$0.00$0$0$0$0.00$0
18.0
19.0ELECTRICAL CONSTRUCTION - 2sqft0.0$0.00$00.0$0.00$0$0$0$0.00$0
20.0
21.0ELECTRICAL CONSTRUCTION - 3sqft0.0$0.00$00.0$0.00$0$0$0$0.00$0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0.0Page1.0Materials$00.00Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

GC 1

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage2
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0GENERAL CONDITIONS - 1sqft0.0
2.0
3.0General Conditions
4.0$0
5.0$0
6.0$0
7.0$0
8.0$0
9.0$0
10.0$0
11.0$0
12.0$0
13.0$0
14.0$0
15.0$0
16.0$0
17.0$0
18.0$0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0.0Page2.0Materials$00.00Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

CIVIL - 1

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage3
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0CIVIL CONSTRUCTION - 1sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0$0.00
8.0$0.00
9.0$0.00
10.0$0.00
11.0$0.00
12.0
13.0
14.0$0.00
15.0$0.00
16.0$0.00
17.0$0.00
18.0$0.00
19.0$0.00
20.0$0.00
21.0$0.00
22.0$0.00
23.0$0.00
24.0
25.0
26.0$0.00
27.0$0.00
28.0$0.00
29.0$0.00
30.0$0.00
Railing, 2 rail, 1-1/2" dia, HD Galv.Page3.0Materials$00.0Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

CIVIL - 2

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage4
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0CIVIL CONSTRUCTION - 2sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0$0.00
8.0$0.00
9.0$0.00
10.0
11.0
12.0$0.00
13.0$0.00
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0.0Page4.0Materials$00.0Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

STRUCT - 1

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage5
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0STRUCTURAL CONSTRUCTION - 1sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0$0.00
8.0$0.00
9.0$0.00
10.0$0.00
11.0$0.00
12.0
13.0
14.0$0.00
15.0$0.00
16.0$0.00
17.0$0.00
18.0$0.00
19.0$0.00
20.0$0.00
21.0$0.00
22.0$0.00
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0.0Page5.0Materials$00.00Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

STRUCT - 2

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage6
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0STRUCTURAL CONSTRUCTION - 2sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0$0.00
8.0$0.00
9.0$0.00
10.0$0.00
11.0$0.00
12.0$0.00
13.0$0.00
14.0$0.00
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0.0Page6.0Materials$00.00Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

Arch - 1

CONSTRUCTION CBREAKDOWN OF WORK TO BE ACCOMPLISHEDPage7
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0ARCHITECTURAL CONSTRUCTION - 1sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0$0.00
8.0$0.00
9.0$0.00
10.0$0.00
11.0
12.0
13.0$0.00
14.0$0.00
15.0$0.00
16.0$0.00
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0.0Page7.0Materials$00.00Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

HVAC-FP-1

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage8
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - GENERAL CONDITIONSMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0HVAC - FP -1sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0$0.00
8.0$0.00
9.0
10.0
11.0$0.00
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0.0Page8.0Materials$00.00Labor$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0$0
GCOverHead$0
SubTotal$0
GCProfit$0
Subtotal$0
0.0Buisness$0$0$0
Subtotal$0Subtotal$0
ProjectBid Bond$0Bid Bond$0
$0Grand Total$0

Elect - 1

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage9
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - ELECTRICALMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0ELECTRICAL CONSTRUCTION - 1sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0$0.00
8.0$0.00
9.0$0.00
10.0$0.00
11.0$0.00
12.0$0.00
13.0
14.0
15.0$0.00
16.0$0.00
17.0$0.00
18.0$0.00
19.0$0.00
20.0$0.00
21.0
22.0
23.0$0.00
24.0$0.00
25.0$0.00
26.0$0.00
27.0$0.00
28.0
29.0
30.0
0.0Page9.0Materials$00.00Labor$0$0$0.00
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0.00$0.00
GCOverHead$0.00
SubTotal$0.00
GCProfit$0.00
Subtotal$0.00
0.0Buisness$0$0$0.00
Subtotal$0Subtotal$0.00
ProjectBid Bond$0Bid Bond$0.00
$0Grand Total$0.00

Elect - 2

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage10
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - ELECTRICALMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0ELECTRICAL CONSTRUCTION - 2sqft0.0
2.0
3.0
4.0$0.00
5.0$0.00
6.0$0.00
7.0
8.0
9.0$0.00
10.0$0.00
11.0$0.00
12.0$0.00
13.0$0.00
14.0$0.00
15.0$0.00
16.0$0.00
17.0$0.00
18.0$0.00
19.0
20.0
21.0$0.00
22.0$0.00
23.0$0.00
24.0$0.00
25.0$0.00
26.0$0.00
27.0$0.00
28.0
29.0
30.0
0.0Page10.0Materials$00.00Labor$0$0$0.00
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0.00$0.00
GCOverHead$0.00
SubTotal$0.00
GCProfit$0.00
Subtotal$0.00
0.0Buisness$0$0$0.00
Subtotal$0Subtotal$0.00
ProjectBid Bond$0Bid Bond$0.00
$0Grand Total$0.00

Elect - 3

CONSTRUCTION BREAKDOWN OF WORK TO BE ACCOMPLISHEDPage11
CONTRACTOR:ADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:Dis-Advantage
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force BaseBuisness0.0%
Material Tax:0.0%Labor Burden:0.0%*Overhead:0.0%*Profit:0.0%*Bid Bond0.0%
(1)(2)(3)MATERIALLABOR(9)(10)
UNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERManAvg.DIRECTLINE
NO.ITEM - ELECTRICALMEASUREQUANTITYUNITTOTALHoursRateTOTALCOSTSTOTAL
=(3) X (4)= (6) X (7)=(5) + (8) + (9)
1.0ELECTRICAL CONSTRUCTION - 3sqft0.0
2.0
3.0
4.0$0
5.0$0
6.0$0
7.0$0
8.0$0
9.0$0
10.0$0
11.0$0
12.0$0
13.0$0
14.0$0
15.0$0
16.0
17.0
18.0$0
19.0$0
20.0$0
21.0$0
22.0$0
23.0$0
24.0$0
25.0$0
26.0$0
27.0$0
28.0$0
29.0
30.0
0.0Page11.0Materials$00.00Labor$0$0$0.00
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0.00$0.00
GCOverHead$0.00
SubTotal$0.00
GCProfit$0.00
Subtotal$0.00
0.0Buisness$0$0$0.00
Subtotal$0Subtotal$0.00
ProjectBid Bond$0Bid Bond$0.00
$0Grand Total$0.00