RFI__5_and_Note_to_Offerors.docx

DOCX document 13 KB Posted

Attached to
Civil Engineering Multiple Award Construction Contract (CEMACC) Federal contract opportunity
Solicitation number
FA8501-17-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

RFI #5 and Notice to Offerors

View the file

Other files for this federal contract opportunity

Other files attached to Civil Engineering Multiple Award Construction Contract (CEMACC), newest first.
File Type Posted
RFI__6__-_17_Feb_17.docx DOCX document
Notice_to_Offerors_Attachment_8.docx DOCX document
RFI.docx DOCX document
N27 Utility Pit_01.JPG JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
Lighting Panel in adjacent fabric structure.JPG JPG image
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_01.jpg JPG image
RFI__3_For_FBO_Post_27_Jan_2017.docx DOCX document
N27 Utility Pit_02.JPG JPG image
UHHZ_150376_C17_Fabric_Shelter_LAYOUT_SECTION.pdf PDF
Lighting Panel in adjacent fabric structure.JPG JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_04.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_02.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA schedule.jpg JPG image
N27 Utility Pit_01.JPG JPG image
RFI_'s__2_20-Jan-2017.docx DOCX document
N27_Utility_Photos.zip ZIP file
Sign_In_Sheet,_Site_Visit_Slides.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Atch__23_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__5_Appendix_C.docx DOCX document
Atch__19_Tax_Liability_Form.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__12_Wage_Determination_Buidling_CEMACC.pdf PDF
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__15_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__31_UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_As-Built_Drawings_combined.pdf PDF
Atch__25_-_Best_Practices_for_Landscape_Guidelines_Robins_AFB_3-15-2011.pdf PDF
Atch__1_CEMACC_SOW_21_Dec_2016.docx DOCX document
Atch__13_Wage_Determination_Heavy.pdf PDF
Atch__34_UHHZ_150376_Cnst_Inst_C17_Fabric_Shelter_at_N_27_Statement_of_Work_03NOV2016.pdf PDF
FA8501-17-R-0001.pdf PDF
Atch__4_-_Robins_AFB_Division_1_Specs_and_Forms.pdf PDF
Atch__18_-_BLANK_SAMPLE_Master_Utility_Outage.pdf PDF
Atch__37_Matrix.pdf PDF
Atch__33_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Show all 50

Civil Engineering Multiple Award Construction Contract (CEMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI #5 and ***NOTE TO OFFERORS****** Question:

The Design Schedule defined in the B140 CMM SOW calls for a design schedule that will extend to 120 days. Amendment 2 calls for the 140 CMM project to be completed in 153 days from the Construction NTP. Is it correct that the Construction NTP will be issued after the Final Design Submittal is completed and approved?

Answer:

The period of performance was separated between Design and Construction on this project. The design phase period of performance for 160049 is 120 days and the construction period of performance is 153 days as indicated in FAR Clause 52.211-10 which would give you the total of 273 days

Question:

The Design Schedule defined in the B149 Locker Room SOW calls for a design schedule that will extend to 135 days. Amendment 2 calls for the 149 Locker Room Project to be completed in 153 days from the Construction NTP. Is it correct that the Construction NTP will be issued after the Final Design Submittal is completed and approved?

Answer:

In addition, the design phase period of performance for 160082 is 135 days and the construction period of performance is 153 days which would give you a total of 288 days that you made reference to in your question.

The design period of performance is captured in the SOW and the Construction Period of Performance is captured in the FAR Clause.

*****NOTE TO OFFERORS*******

Please note that 20 Feb 2017 is a federal holiday. Please do not arrange for delivery of proposals on that date as no one will be here to accept them.

File details come from the government source that posted it. Updated .